2011.013
Pulse Tube Cryocooler-Seminar
Topic5 Refrigeration Cycle Handout
Air Conditioning Final
Report on Accelerator Plenary Session “Power Consumption” Chris Adolphsen & Philippe Lebrun LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
I. Ben-Zvi, 2 nd EIC Workshop, March 15-17, 2004 Electron Cooling of the Relativistic Heavy Ion Collider: Overview Ilan Ben-Zvi Collider-Accelerator Department.
LEP3: A high Luminosity e + e – Collider in the LHC tunnel to study the Higgs Boson M. Koratzinos On behalf of the LEP3 proto-working group HEP2012: Recent.
19./20. September 2007 Current leads for FAIR Cryogenic Expert Meeting 19./20. September 2007 Birgit Weckenmann.
High voltage test system update Summary of 2005 results Results from March, May 2006 Possible remaining R&D projects Polished electrodes, clean(er) LHe.
Superconducting Cavities for Super- KEKB S. Mitsunobu.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.