Report on technical study of TSR@ISOLDE Fredrik Wenander, TSR workshop 14/2-2014 Outline 1.Beam-line layout 2.Storage time REXTRAP 3.Upgrade of charge.
Fredrik Wenander, ISCC 31/3-2014
Report on technical study of TSR@ISOLDE
Installation at Isolde (and costs)