EPICS at SSRF/Shaghai in March.2008, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members at Mar.2008.
Beam commissioning strategy 09-12-09 Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
22 December 20143rd FCAL Hardware WG Meeting 1 BeamCal sensors overview Sergej Schuwalow, DESY Hamburg.
Introduction: Harvard ATLAS Group
H-Jet polarimeter status report
R. Assmann - LTC Two Beam Operation R.W. Aßmann with W. Venturini and V. Kain LTC 4.7.2007 Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Bunch Numbering
14 Aug. 2008John Huth Harvard DOE Review Introduction: Harvard ATLAS Group John Huth.
Beam commissioning strategy
Weekly summary