June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
LHC Lumi Days – 14/01/2011 D. Belohrad, JJ Gras, M. Ludwig, P. Odier (BE-BI) 1.
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
ALICE Beam Simulations Deepa Angal-Kalinin On behalf of ALICE simulation team F. Jackson, J. Jones, J. McKenzie, B. Muratori, Y. Saveliev, P. Williams,
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Vaia Papadimitriou The Supertable (Introducing Supertable II) Run II meeting September 2, 2004 Timofei Bolshakov and Vaia Papadimitriou.
Beam Arrival Time Monitors Josef Frisch, IBIC Sept. 15, 2015.
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group*
On M. I. to TeV Injection : Bunch Lengths and transfer efficiencies. Store 2150 – 2155.
An overview of the advanced accelerator research at SLAC. Experiments are being conducted with the goal of exploring high gradient acceleration mechanisms.
1 Alternative Bunch Compressor 30 th Sep. 2008 KNU Eun-San Kim.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.