Status of X-Band Structure Fabrication at Fermilab
October 25, 2001David Finley to NLC MAC @ SLACSlide 1 Status of X-Band Structure Fabrication at Fermilab Our First X-Band Structure Progress of RF Factory.
MCTF C. Johnstone MUTAC Meeting 8-10 April 2008 1 Debut of the MTA beamline Description, status and commissioning plans.
Prediction of chamber condition at long time scale is the goal of chamber simulation research. Chamber dynamics simulation program is on schedule. Program.
Debut of the MTA beamline
Zentralabteilung Forschungsreaktoren
LCGT Vacuum System
LOS Absorption Presentation for TCS Group
R . Garoby for
RR AIP
17.03.2010 Der LHC Beschleuniger - DPG - Bonn 1 Drawing by Sergio Cittolin Der LHC Beschleuniger: Herausforderungen auf dem Weg zu Teilchenkollisionen.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview 120203 VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of 10 -7 Pa, or lower.