1 LHC Machine Protection Rossano Giachino Acknowledgments to my colleagues of the MPWG Rossano Giachino for input and material. J.Wenninger B.Todd R.Schmidt.
Introductory comments on: “ How will the low level rf systems required for bunch compression, cavity tuning, machine protection, etc. be designed so as.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG 8.5.2007 Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
LHC Injector Complex Status K HANKE LHC Performance Workshop Chamonix 2014 K Cornelis, S Gilardoni, B Goddard, D Kuchler, M Lamont, D Manglunki, B Mikulec,
Latest results from the upgraded PITZ facility Chase Boulware, DESY, Zeuthen, Germany, for the PITZ collaboration cathode laser conditioning test stand.
CLIC related CERN-KEK collaboration J.P.Delahaye for the CLIC study team.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
LHC beyond 2020 Frank Zimmermann KEK Accelerator Seminar, July 2010.
Report to the Collaboration India-CMS Collaboration Meeting Delhi Univ, 27-28 March 2009 A. Gurtu Tata Institute of Fundamental Research, Mumbai.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 final focus prototype ( emphasizing French involvement )
LHC Status and Start-Up