GridPP Status David Britton, 3/Sep/08.. 2 31/03/2014 Switching on the LHC The LHC was fully cold by mid August. This is being followed by continued powering.
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY John Dainton Nov 23 24 2006 CI SAC Welcome to the Cockcroft Institute John Dainton Director,
2011-10-05 LHC 8:30 meetingEBH 11 Wednesday 4 October 2011.
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Barcelona, 21 de maig de 2010. Introduction: Research objectives Detector IGISOL system (Ion Guide Isotope Separator On-Line) Efficiency calculation
N eutrino E xperiment with S pectrometer S i n E urope SPECTROMETER(S) Prospects for a New Neutrino CERN-PS Experiment: 1Alessandro Bertolin / Luca Stanco.
Neutrino Astroparticle Physics Lutz Köpke University of Mainz, Germany July 8, 2005 XXV Physics in Collision.
Feb 09, 2012 L. Vorobiev, I. RakhnoPage 1 Multi-Turn Stripping Injection and Foil Heating with Application to Project X Presentation Based on: Phys. Rev.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
1 RHIC – p+p and p+Au projections for 2018+ 21 March 2014 STAR meeting.
FP420 Infrastructure in LHC FP420 @ UTA 27-Mar-2007.
SeaQuest: Fermilab Experiment E906 ➡ Status and Plans Beyond SeaQuest ➡ Polarized Drell-Yan at Fermilab (E1027) Wolfgang Lorenzon (30-October-2013) PacSPIN2013.