pvgis
ELECBRC UNISTRUT
Beamanal --- Single-span and Continuous-span Beam Analysis
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Status of the LHCb experiment Andrei Golutvin ( Imperial & ITEP & CERN ) on behalf of the LHCb collaboration Outline: Introduction Detector Subsystems.
LHCb Roadmap 2009-10. 2008: DIRAC3 put in production m Production activities o Started in July o Simulation, reconstruction, stripping P Includes file.
Development of Large Scale Optimization Tools for Beam Tracking Codes Brahim Mustapha Beam Dynamics Group, Physics Division Argonne National Laboratory.
Task group report 135 cyberknie
[Eng]Tutorial Composite Beam 2007.0.1
Medical Physics Support of Linear Accelerators. Overview of Physics Support Accelerator safety issues Accelerator safety issues Task Group Report #35.
GSB : A real-time Software back-end for the GMRT Jayanta Roy National Centre for Radio Astrophysics Pune, India LFRU@GMRT, 12 th December 2008 Collaborators.