CLIC requirements on Warm Magnets (for CLIC Modules mainly)
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto, 09-12-02.
4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues
1 Simulation of transition crossing in the Fermilab Booster Xi Yang September 5, 2006 Xi Yang the work has been done in collaboration with Alexandr Drozhdin.
CTF3 & CLIC Parameters Instrumentation already developed What will be done in the CLEX
LCWS12, 25/10/2012 1 CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
R. Corsini LCWS12 – Arlington 22 Oct. 2012 Overview of CLIC system tests R. Corsini for CLIC Collaboration OUTLINE: Why & how do we need system tests?
1 21-09-2012 «BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests 1.Environment 2.Heating and.
Two-beam module review , 15-16 September 2009 Module layout and types
Two Beam Scheme
THE CLIC PETS ON/OFF OPERATION: PRINCIPLEs, study and design
TBA modules in CTF3