ATLAS Pixel Detector Upgrade: IBL – Insertable B-Layer Tobias Flick University Wuppertal 17.09.2009, VERTEX 2009 Putten, Netherlands Preliminary.
O Inner Tracker UpgradeG. Darbo – INFN / Genova Milano, 10 February 2015 Inner Tracker Upgrade X Workshop ATLAS Italia 10 – 12 February 2015 G. Darbo –
STGC for ATLAS Small Wheel upgrade Short introduction to sTGC Layout of the system Achieving the necessary precision and construction of Module-1. Preliminary.
ATLAS Phase II For the High Luminosity LHC IPRD13 – Sienna Italy 07/10/2013 07/10/2013B.Todd Huffman1 Dr. B. Todd Huffman on behalf of the ATLAS Collaboration.
RCE status update (DOE Detector R&D program on H/P DAQ Systems)
Low Mass Local Supports for the ATLAS Upgrade Inner Silicon Barrel Tracker Peter Sutcliffe University of Liverpool On behalf of the ATLAS Upgrade Inner.
Development of sTGC Repair and maintenance of BW Short introduction to the Physics needs. Development of sTGC’s, how to achieve the needed precision. Short.
REFLECS project
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
Silicon strip staves and petals for the ATLAS Upgrade tracker of the HL-LHC
Technology Developments for Trigger, Data Acquisition, Software and Computing