CP09
PMP 450 Release 12 0 Notes
PMP 450 Planning Guide
PMP 450 Installation Guide
A Comparison Between ANSI&IEEE and IEC
Comparison Between ANI-IEEE and IEC for Metal-Clad Switchgear
Principles of C7 Signalling
Software Configuration Management
1 Mr. Dusit Thongjun Managing Director CGL Engineering Co., Ltd. CGL ENGINEERING CO., LTD. Mitigation of AC Induced Voltage On Buried Metallic Pipelines.
Ansi isa rp12.6 (95)
LBSC 690
CSSE 375 Software Construction and Evolution: Configuration Management Shawn and Steve “You don’t know what version the customer is running?” -- Your instructors.