Ttester1 10 En
Simulations with event pile up in MVD 1. Improvement of the MVD-digitiser 2. General simulations with pile up 3. Open charm reconstruction Christina Dritsa.
Module studies at IC
October, 2001CMS Tracker Electronics1 Module studies at IC OUTLINE laboratory setup description, APV I2C settings pulse shape studies (dependence on ISHA,
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
ESR Tester 096k
Figure 1 . Visualization of pig neurons and processes at 6.25 m resolution.
Simulations with event pile up in MVD
ttester_eng104k
LOFAR Status as of June 2003 Colin Lonsdale. What is LOFAR? Major new array for 10-240 MHz range 400 km across, fixed dipole receptors Fully digital,
Eng1.pdf