Report - Pumping Test in Drillhole OL-KR29 in Summer 2016 · 2 PUMPING TEST 2.1 Equipment Figure 2-1 presents a schematic drawing of the equipment used in the pumping test. The pumping was

Please pass captcha verification before submit form