Report - GCC Transport and Railways Conference€¦ · •Lagos-Kano Railway –1315 km Std Gauge –100% Double-Tracked –$8.3 Billion cost; $2.5 billion Ex-Im Bank loan •Abuja Mass Transit

Please pass captcha verification before submit form