Report - Patch Running Procedures Procedures, Std. Patch w/MSST Eline page 2 MAN-PAT-010 (R05) 6. All distances from the Blow Out Preventer (BOP)/Wellhead to rig floor need to be verified.

Please pass captcha verification before submit form