• ContactCall us or send an enquiry via our website with your initial enquiries.

• VisitVisit our display centre at 67-71 Westwood Drive Deer Park to see what we can do for you. We’re open from 10am – 5pm 7 days a week

• DiscussionTake the opportunity to meet with one of our design consultants and understand the way that Lazaway approaches the design and construction of your new pool, using the latest in construction technology as well as the latest equipment available in today’s market

• On Site inspectionContact us to make a time for a design consultant to visit your site with you discuss your project in detail.

Page 3: Lazaway Pool and Spas - Pool Construction

• ContractLazaway Pools prepare and issue an SPASA Vic contract specifying the scope of works and all inclusions and exclusions. Once the contract is signed and the 5% deposit is received, your project is ready to proceed.

• Site reportOur draftsman will meet with you and place the pool in your property, at this time accurate measurements are obtained which enables our surveyors to commence the building permit process. Simultaneously these drawings are forwarded to our engineers where they undertake the engineering of your pool and hydraulic flows to strict Australian guidelines drawings are prepared for both building permit and construction purposes.

Page 4: Lazaway Pool and Spas - Pool Construction

• Building permitOne of Lazaway Pools staff member in our construction department will make the necessary application to the relevant authorities re your building permit, if there is a town planning permit required, Lazaway Pools will go ahead and arrange all necessary town planning permits before your building permit is issued using our building surveyor. If there is no town planning or developers approvals required we can usually get your building permit within 2 weeks

• Color selectionsAn appointment at our Rowville head office is scheduled in where its time for you to choose the color of your pool and tiles, look at the equipment that you have chosen and get a thorough understanding of the process by which Lazaway starts and completes your pool.

• Investment by the clientDeposit to the value of 5% of contract sum

Page 5: Lazaway Pool and Spas - Pool Construction
Page 6: Lazaway Pool and Spas - Pool Construction
Page 7: Lazaway Pool and Spas - Pool Construction
Page 8: Lazaway Pool and Spas - Pool Construction
Page 9: Lazaway Pool and Spas - Pool Construction