  • Type Name of the Project/Tender Brief Scope of Work Location of the Project Planned start & finish

    Dates

    1 Construction P-8363 : Fire & Gas detection system at Zirku

    Provide an adequate F&G detection and alarm system to replace the

    existing aging system at Zirku with a new F&G system to increase the

    level of safety on the facility.

    ZirkuPlanned Award : Q4 2012

    Planned Finish : Q4 2014

    2 Construction P 8381 - Zirku Airport Upgrade

    ZR Airport expansion shall accommodate the following while keeping

    existing facilities intact:

    * Four helipads.

    * Two taxiways.

    * One access way.

    * Lighting and marking associated with above

    ZirkuPlanned Award : Q3 2012

    Planned Finish : Q1 2014

    3 Construction UZ750 Brownfiled Projects P-8276: Gas Injection and Gas Lift Facilities Upper ZakumPlanned Award : Q1 2012

    Planned Finish : Q1 2013

    4 EPCP-8362 :Potable Water & Sewage Treatment

    Plant at Zirku

    Installation of RO type desalination plants with total capacity of ~

    4450m3/day, new centralised STP, decentralied STUs and associated

    infrastructure/ piping upgrade to meet acute shortage of potable water and

    sewage treatment plant at Zirku.

    EPC works to be carried for this project.

    ZirkuPlanned Award : Q2 2013

    Planned Finish : Q1 2015

    5 FEED & EPC UZ750 Brownfiled Projects P-8385 Switchgear Replacement in Upper Zakum field. Upper Zakum

    FEED

    Planned Award : Q1 2012

    Planned Finish : Q1 2013

    EPC

    Planned Award : Q4 2013

    Planned Finish : Q1 2018

    6 EPC UZ750 Brownfiled ProjectsP-8341 Water Injection Plant Upgrade &

    P-8361 Cooling Water System Upgrade Upper Zakum

    EPC

    Planned Award : Q1 2013

    Planned Finish : Q4 2014

    7 Project P 8374 - Power upgrade at ZIRKU

    Installation of additional power generation facilities at Zirku Island since

    the existing power generation facilities enhancement due to the

    operational constraints for maintenance of aging turbines, increase in

    demand for the future projects and improve flexibility of operations

    Zirku

    EPC

    Planned Award : Q2 2013

    Planned Finish : Q2 2015

    8 Project P 8442 - Helicopter Maintenance Hanagr

    P8417 - Aviation Fuel Facility

    Construct an air conditioned hanger (23m X 23m) complet with offices,

    electrical/water/drainage utilities, communication facilities, standby

    generator, fire detection and fighting system, ..etc.

    Installation of jet fuel facility including but not necessary limited to civil

    foundations, associated piping system, electrical, instrumentation, fire

    detection and protection system (Pumps & tanks will be free issued by

    ZADCO ).

    Zirku

    EPC

    Planned Award : Q1 2013

    Planned Finish : Q4 2014

    9 EPC (P8382) - 7th Crude Oil Storage Tank at Zirku To build a seventh Crude oil storage tank on Zirku island with a capacity of

    Barrels 1 million.Zirku

    Planned Award : Q1 2013

    Planned Finish : Q2 2015

    10 EPCUZ750 Sub-sea Pipelines, Cables, Offshore

    Structures & Brownfied Work (EPC-1)

    Engineer, procure and construct the offshore facilities for the UZ750

    ProjectUpper Zakum

    Planned Award : Q2 2012

    Planned Finish : Q2 2015

    11 EPC UZ750 Island Surface FacilitiesEngineer, procure and construct the onshore (on island) facilities for the

    UZ750 ProjectUpper Zakum

    Planned Award : Q3 2012

    Planned Finish : Q1 2016

    12 EPC Early Civil WorksLevel island surface and construct the early civil work structures,

    trenches, roads and other requirements on the islandsUpper Zakum

    Planned Award : Q1 2012

    Planned Finish : Q22015

    13 EPC Temporary Containerized Camp Facilities Design and construct camp facilities for each island Upper ZakumPlanned Award : Q2 2012