A highly skilled Construction Engineer / Supervisor / Inspector in Civil, Structural & Mechanical,
Modular Construction with 15 years multi-discipline experience in oil & gas, mining, refinery and
chemical projects, phosphate project, LNG, desalination project, petrochemical project, power
plant project, pipeline projects(metals & non-metallic, HDPE, GRE/GRP/FRP/RTR materials).
Significant experience and expertise with infrastructure project such as Airport & Taxiway,
housing facilities, buildings, roads & highway, bridges, railways, waste/water treatment &
drainage system, Ports & harbor and Facilities.
Skills and experience
Engineering Supervision, Construction Management, Quality Management, Design & Review, Planning & Scheduling, Material tracking & Monitoring
Inspection, Surveillance and monitoring the quality performance in Civil, Structural, Mechanical, Welding/Piping inspection, Surveillance and Auditing.
Handle multiple task such as: Site Construction Manager , Engineer, Supervisor, Quality Engineer and Inspector including Piping and welding, NDT inspection
Multi-task ability in running a large-scale projects
Effective time management and reporting/monitoring skills
Able to bring a project to completion on/under budget
Complete projects on time
Manage responsibilities in a multi-discipline scenario of constructions in compliance with technical client specifications, quality standards, work procedure plans and international safety practices
Computer Literate: Primavera – 6 (Planning & Scheduling); Six Sigma Minitab Software, AutoCAD; STAAD Pro; MS Word; MS Excel, Sketch-up
Familiar with international standard; ACI, PCI, ASTM, ASME, BSI, UBC, ANSI, API, ROK, GOST, SNIP’s and projects specification.
Achievements
Completed a Multi-Million & Billion US Dollar projects in behalf of Saudi Mining Company
Closed a detailed engineering on time and issued all approval for construction drawings to EPC contractors prior to start of construction stage
Managed the completion of all drawing reviews and documents required during construction and as-built
Supervised finishing all Civil, Electro-mechanical, Structural and Architectural tasks during construction of projects
Administered completion of all Quality Plan and Inspection Test Plan, review Procedures/Method Statement approved prior to implementation of the projects
Directed and monitored all EPC contractors in construction activities to meet milestones and prevent the delays on schedules
All activities were completed without Lost Injuries / accident
Awarded as Employee of the Month and a 5-Year Service Award on a multibillion dollar project with several thousand personnel.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2
Rev 6 (03-Feb-09)
Career Position Handled:
Construction Department: Quality Department:
Construction Manager CSA & Non Metallic Piping Specialist
Lead Construction Supervisor Quality Supervisor / Engineer
Site Engineer QA Supervisor / Quality Coordinator / Specialist
Civil Engineer Quality Inspector – Civil / Structural / Architectural
Project Control – Planner/Scheduler Quality Inspector - Piping / Welding / NDE
Experience
18/08/ 2014 to Present WorleyParsons / Fluor (KPJV Limited) - EPCM
FUTURE GROWTH PROJECT / WELLHEAD PRESSURE
MANAGEMENT PROJECT (FGP/WPMP) TengizChevrOil (TCO)
Tengiz, Kazakhstan
Construction Quality Specialist - (CSA) Civil, Structural & Architectural & Non Metallic Pipe
Specialist
Company & Project Background: Project Management Team for Multi-billion dollar large scale
expansion of capacity at Tengiz oil field. Managing of projects and contractors from construction
of early works, earthwork moving, Site preparation(Bulk filling and cutting), infrastructures,
facilities, buildings, utilities to permanent work projects of TengizChevrOil company.
Projects Assigned:
TCOV Housing Refurbishment Project. (Completed)
5000 New Housing Camp Project.
Construction Compound Project (Completed)
Taxi-Way / Domestic Airport Project. (Completed)
Infield Haul Road Project
Motor Road Project (Completed)
Railway Project (Track 930/931,932/934)(Completed)
3rd
Generation Injection Plant (3GI)
3rd
Generation Processing Plant (3GP)
Utilities and underground Services Project
Metallic and Non Metallic(HDPE) Pressure Pipeline
Piling Project
Key Roles and Technical Skills:
Reports to Project Site Quality Manager and Area Manager
Mentor and provide training the local contractors, supervisor’s, skilled and laborers for specific activities.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3
Rev 6 (03-Feb-09)
Resolve technical quality issues regarding Civil, Structural, and Architectural and Piping works.
Provide construction materials testing and inspection on soils, concrete, asphalt, etc. to support FGP/WPMP projects.
Reviewing Contractor’s Quality documentation, method of statement and vendor documents.
Assist of materials certification, inspection documentation system specific to the requirements of the Republic of Kazakhstan (ROK). Preparing and reviewing of testing & Inspection forms for test methods used per ITP, ROK & SNIP’s.
Analyzing the functionality of forms already created for improvements and/or consolidation of test methods.
Review of in-coming test data for validation and provide site visits to laboratories to witness testing methods.
Witness and surveillance monitoring the daily inspections and closed the inspections activities per project Inspection Test & Plan (ITP), project specification and local legislation rules of Kazakhstan.
Assuring all quality activities are been documented like NCR, CAR and surveillance report.
Review, witness and guide the contractor’s for WPS/ BPS/ PQR procedural welding qualification and WQT activities including NDE and hydro-testing requirement.
Attending project quality meeting, construction progress meeting and TCO quality meeting.
Assuring that safety procedures are followed and making safety observations and entering BBS safety reports.
09/02/ 2014 to 15/08/2014 AG&P / JKC JV- Philippines
INPEX - LNG ICHTHYS PROJECT
Darwin, Australia
Fabrication Area: PPA Batangas Yard 2; Philippines
Construction Manager (Night Shift)
Company & Project Background: Multi-Million dollar project fabrication, construction, installation
and Pre - commissioning of modular LNG LER/LIR ICHTHYS project (27-Modules Phase 1).
Structural foundation and erection.
Structural steel fabrication & installation
Architectural fabrication and installation
E & I Installation and Commissioning
Electro-Mechanical installation and Commissioning
Testing and Commissioning
Close –out and load-out / hand-over
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 4
Rev 6 (03-Feb-09)
04/11/ 2013 to 08/02/2014 AG&P / FLUOR JV- Philippines
The Dow Chemical Company Propane
DeHydrogenation (PDH) Project -Freeport, Texas, USA
Fabrication Area: PPA Batangas Yard 2; Philippines
Project Status: Finish Project
Construction Manager (Night Shift)
Company & Project Background: Multi-Million dollar project fabrication, construction, installation
and Pre -commissioning of modular project (18-Modules Phase 1).
Piping installation and arrangement
Structural steel fabrication & pipe rack installation
Piping structural support and installation
E & I Installation and Commissioning
Testing and Commissioning
Close-out and load-out / hand over
Key Roles and Technical Skills:
Reports to Project Director
Manages construction fabrication & installation of piping and structural modules for Fluor-DOW Chemical Project
Manages the construction supervisor and staff of up to 475 personnel for day to day activities
Full monitoring and supervision on daily activities and progress
Allocates manpower for the priority work schedule and maintains/exceeds 30% progress and leading the progress against dayshift on day to day activities with limited manpower and resources.
Tracks all the materials, tools and equipment to ensure the availability onsite same through with materials delivery monitoring
Ensures safety and implements safety requirements all-times onsite
Guarantees quality requirements and quality of work in-place from fabrication to erection and pre-commissioning
Assures availability of QC documentation in-place and updates inspection & testing from time to time
Ensures QC inspection and testing requirement is in compliance to IT&P, MST, Specification and Procedures.
Interacts on a daily basis with the Technical Staff, Contractor's Field Staff, QA and QC Inspection Staff, and Safety and Environmental staff.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 5
Rev 6 (03-Feb-09)
01/06/ 2013 to 31/10/2013 JG Summit Petrochemical Corporation
JGS Naphtha Cracker Project
5-months Simlong, Batangas; Philippines
Construction Supervisor – Piping
Company & Project Background: Multi-Million dollar expansion plant of Naphtha Petrochemical
project providing construction, installation and pre-commissioning.
Key Roles and Technical Skills:
Reports to Construction Manager
Allocates manpower for the priority work schedule and maintains progress on day to day activities
Interacts on a daily basis with the Technical Staff, Contractor's Field Staff, QA and QC Inspection Staff, and Safety and Environmental staff
Works-out Test Package, arranges test pack documentation requirement, gathers and files necessary record test report like NDT Report, Mechanical Reports like flanges, valves, Torque Inspection Report, Serration Reports, Hydro-testing/ Pneumatic Reports
Ensures that tests and inspections are performed, witnessed, and documented in accordance with the approved procedures
Close coordination to Quality Staff for punch listing items, immediate rectification and corrective action prior for closure of punch list item
Assures the re-instatement and restoration of valves, gasket and accessories are done after the hydro testing and blowing activities of pipelines.
Reviews the Test Packages Report to ensure that pipelines are completed prior to submittal and sign-off by the client
Performs checking of piping line after construction installation, before Hydro-Testing/Pneumatic testing and pre-instatement of piping lines
Reviews and interprets ISO drawings and P&ID.
Monitors material procurement and deliveries to ensure timeliness in support to construction activities and schedules within the Piping discipline.
Maintains a daily log for permanent record of project construction as well as discipline data for the final project turnover and report.
Witnesses the NDT Testing, Hydro testing and Pneumatic test, PWHT per ITP plans.
Checks and monitors the painting works and installation of insulation and cladding of piping line.
Guarantees that all activities & testing performed are in compliance with the specification, Standard and procedure or method of statement.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 6
Rev 6 (03-Feb-09)
2010 – 04/2013 Worley Parsons Arabia, KSA.; PMC - Ma’aden Project
Senior Construction Supervisor
Company & Project Background: Project Management Team of Multi-billion dollar infrastructure
projects to manage the construction and developing of infrastructures and facility projects of
Saudi Arabian Mining Company:
Projects:
Raz Al Kair Village Housing Phase 2 Project (Including Infrastructure services – HDPE water pipeline system, U/G power line & Telecommunication line, Power Distribution System(OHL, RMU & Substation), Storm & Waste Water piping line
system(Non Metallic FRP Pipes) and Non-metallic FRP water tank supply system) Ma’aden Riyadh Headquarter Office Building(Phase-2) Fuel Petroleum Station and Facilities (Including U/G HDPE fuel piping line and
non-metallic U/G Tank storage)
Key Roles and Technical Skills:
Reports to Project Manager and Project Directors
Provides construction management and engineering technical input and supports the Project Manager in administering the construction contract, including review and processing of submittals, monthly pay requests, pay estimates, Requests for Information (RFIs), Requests for Proposals (RFPs), and change orders)
Assists Project Manager with setup and maintenance of the formal projects files and project closeout upon completion
Makes recommendations to the Project Manager regarding interpretation of contract document and the resolution of disputes
Ensures that tests and inspections are performed, witnessed, and documented in accordance with approved procedures
Reports recognizably unsafe conditions to the Contractor when observed
Collaborates with the Contractor to eliminate any hazards associated to work that may adversely affect the environment or the safety or health of employees
Reviews and interprets discipline design drawings and specifications to ensure current revision level and correct technical execution of the work
Provides resolution for technical engineering problems within the assigned discipline; coordinates application of solutions
Monitors discipline construction schedules and assists in progress appraisal.
Provides schedule and progress appraisal data to the Project Manager
Monitors material procurement and deliveries to ensure timeliness in support of construction activities and schedule within the assigned discipline.
Maintains a daily log for permanent record of project construction, as well as discipline data for the final project turnover and report.
Maintains construction technical catalogs, supplier data, and other literature pertaining to the project.
Assists field construction management in portions of larger, more complex activities as
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 7
Rev 6 (03-Feb-09)
directed
Knowledge in using Primavera P6 version 7.1 for Planning and scheduling, AutoCadd and well familiar in International standard such as UBC, PCI, ASTM, ASME, ACI, BSI including Project specification.
2008 - 2010 Worley Parsons Arabia, KSA; PMC Ma’aden Project
Senior Quality Supervisor (Civil, Structural, Architectural & Mechanical)
Company & Project Background: Project Management team of Multi-Billion dollar infrastructure
projects to manage construction and develop infrastructures and facility projects of Saudi Arabian
Mining Company:
Projects:
Roads & Highways project, Traffic light system project. Pipelines & metering station project supply to Phosphate
Plant. Water Cooling Pipeline system supply to Phosphate Plant(In-
take & Out-take) – Non-Metallic FRP pipes materials Street lighting project. 380KV, 115KV & 34.5KV Power distribution system (Power
Substation) & Over Head Line (Including U/G HV/LV Line using
HDPE piping sleeve to protect the cable from saline materials and salty
water) Phosphate village housing Phase-1 project. Drainage system project (Non-Metallic FRP culverts, Manholes and
pipes).
Perimeter fence with patrol roads project. Ma’aden Riyadh Headquarter Office Building(Phase-1)
Key Roles and Technical Skills:
Provide support to the Project on all matters relating to Quality Management
Development and maintenance of the Project Quality Plan.
Assist project process owners in establishing their delivery processes and procedures.
Review of various documents including Engineering Specifications.
To plan and lead (as necessary), assessment visits/audits to suppliers and sub-contractors as agreed.
Coordinate Criticality Ratings and Quality Programmes for requisition packages.
Assist in the evaluations of Suppliers and Sub-Contractors as required.
Evaluation of QA inputs to Prequalification packages and attend evaluation meetings. Provide QA input to the analysis of bids.
Attend bid clarification meetings.
Carry out pre-award audits of suppliers as required. Review quality related vendor documents and mark-up supplier QC/I&T Plans.
Participate in supplier kick-off and/or pre-production meetings.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 8
Rev 6 (03-Feb-09)
Provide input to and monitor close out of concession and deviation requests.
Undertake as necessary awareness training in the project Quality Management System, procedures and applications.
Assuring necessary quality records are identified and retained in accordance with Project, client and regulatory requirements.
Conduct audits/ reviews in accordance with the Project Audit & Review Schedule & provide related audit reports.
Coordinate close out of audit findings.
Lead the pre-commissioning on MCC stage and hand-over of the project per client requirement.
Monitor the start-up, testing, commissioning and handover of the projects.
2007 – 2008 Worley Parsons, Saudi Arabia; Ma’aden Project - EPCM
Quality Supervisor/Engineer
Company & Project Background: Project Management Team; This Project was valued at $5.4 Billion US Dollar and included the development of facilities to exploit Ma’aden phosphate reserves, with a beneficiation plant at Al-Jalamid, and a chemical complex at Ras al Khair comprising:
Ammonia plant.
Sulfuric plant.
Phosphoric plant.
Power & desalination plant.
Di-ammonia plant.
Infrastructure’s Services(U/G GAS pipelines & Non-Metallic Pipe
lines-RTR/FRP, HDPE Water & Fuel pipe lines, U/G Water Intake pipe
lines, HDPE Electrical Cable sleeves, U/G Telecommunication line)
Port facilities.
Key Roles and Technical Skills:
Reports to Project Quality Manager
Responsible for the establishment of a fully documented project quality system in line with the Contract requirements and ISO 9001:2008 covering Installation and Pre-/Commissioning
Ensures that work is carried out fully in accordance with the project quality standards specified in the contract and the procedures laid down in the Project Quality Plan to follow the standards
Establishes field inspection, testing procedures and monitors quality control activities on construction site in line with the established quality control program.
Supervises a project dedicated team of multidiscipline QC Engineers and Inspectors performing inspections and testing, compiling records and reporting with regard to all inspections.
Authorizes inspection and test reports to be submitted to client and coordinates to external inspection agencies when required.
Maintains a project quality audit schedule to ensure effectiveness of the project quality system.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 9
Rev 6 (03-Feb-09)
Keeps a close liaison to the Owner with regard to all site QA/QC issues during all phases of project execution.
Checks purchase, sub-contract requisitions and evaluates vendors and Sub-Contractor’s quotation with regard to inspection matters, as applicable.
Evaluates NCR’s and maintains Project NCR Register / log.
Reports the Project Quality Audit Results to PM and QHSE Management Team Manager.
Communicates with Company for project Quality concerns.
Reviews and approves project control and management procedures
Checks engineering deliverables and construction method statement documents.
Prepares and evaluates construction subcontractor QA requirement.
Prepares Project Quality Dossier including Quality Records.
Responsible in providing awareness training for project quality system within project organization.
Knowledge on Quality Management System ISO 9001:2008 and well familiar in International standard such as UBC, PCI, ASTM, ASME, ACI, BSI including Project specification.
03/2006 – 12/2006 Japan Gas Company-ME FZE. /DOLPHIN ENERGY LTD.,
Qatar
QC Welding / Piping & Structural Company & Project Background: Project Management Team; A multi-billion project for
Construction of Downstream Oil & Gas Refinery, Infrastructures, Pipelines, Tanks and Steel Structure and other facility projects.
Key Roles and Technical Skills:
Reports to Quality Supervisor / Manager.
Responsible to the adherence of all production and inspection activities of QA/QC, NDT and construction procedures, and clients’ specifications.
Responsible for all inspection and testing on piping system, pipelines, equipment and tanks, floating roof tank, spherical type and dome type.
Performs and witnesses all testing activities that required by NDE and Visual inspection of all welds as per require Inspection and Test Plan
Responsible for documentation and project procedures review such as (WPS) Welding procedures spec, (ITP) Inspection test plan review, QC Manual (Implementation). Perform (PQR) procedure qualification records, review, witness and material traceability inspection
Performs visual and dimensional check, confirms compliance to inspection specification, bending strength ratio.
Performs welding qualification & testing (welders) WQT, approves and witness of Hydro testing, leak test and Valve Test. Monitoring and document review of NDT technician personnel.
Hooks up piping installation Inspection and performs inspection of structural modification, installation, tubular structures, jackets and platforms.
Reviews and closes out all QA/QC final dossier, work pack, documents completion and comments such as: mechanical, structural, piping installation and components, sand blasting,
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 10
Rev 6 (03-Feb-09)
painting, touchup procedures, galvanizing, coating, installation all necessary documents required for pre com and commissioning.
Responsible for safety monitoring and surveillance based on HSEMS and project procedures.
01/2005 – 01/2006 Perini/USACE, Afghanistan
(Civil & Structural)
Quality Engineer –CSA (Civil, Structural, Architectural)
Company & Project Background: Project Management Team of Multi-Billion US Dollar project
constructing the Military Based/Camp for supporting of Afghanistan National Army Regional Brigade
Facilities under US Army Corps of Engineer contracts.
Projects:
15-Buildings Military Barracks.
3-Buildings Maintenance Garage.
Dining Facilities Building.
Power plant & 13.8kv Overhead Line Distribution.
Infrastructure: Services-Roads, Waste Water Treatment,
Potable Water Distribution System (Using HDPE pipes materials),
Sewer Distribution System (Using FRP pipes materials).
Military & Security System.
Street lighting.
Perimeter fence.
Temporary Facilities for US Army Coalition.
Key Roles and Technical Skills:
Reports to Quality Manager.
Responsible for implementation of Quality Plan, Procedures and Inspection Test Plan(ITP’s) during construction.
Performs daily inspection and surveillance as per Inspection, Test & Plan and project quality plan.
Reviews plans, specification and project SOW.
Responsible for reviewing and evaluating the documents such as drawing, specifications and project requirements.
Performs inspection, testing or witnessing the inspection and testing by 3rd party as per
required Inspection and Test Plan, including the release of company nominated Hold Points
Prepares records of inspection/tests and making these available to the QA/QC Department.
Responsible for verification of the procedures used are adequate for the effective control of quality and rejects defective workmanship and materials.
Monitors the progress of work in accordance to the given time table on project planning schedule.
Prepares accomplishment report
Prepares and updates materials take-off from drawing and compares to site installation or progress works.
Supervises site preparation/Earth works, Pile driving, Sheet Piling, Bored Piling, Excavation for foundation, Reinforce Concrete and Steel Structural works, Storm Drainage and Road
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 11
Rev 6 (03-Feb-09)
work, Land Escaping and Finishing works.
Ensures and implements the safeness at all times per HSE plan and Military/Security procedures.
06/2004 – 12/2004 Keppel Shipyard, Phil.
QC Structural / Welding / NDE
Company Background: Construction and maintenance of tank, piping works.
Installation of equipment, instrument and its foundation support, repair of ship and port facilities
Key Roles and Technical Skills:
Reports to Quality Manager and Project Service Manager.
Responsible for inspection and testing, or witnessing the inspection and testing by others, as laid down in the Inspection and Test Plan, including the release of company nominated Hold Points.
Ensures and verifies corrective action is taken when non-conformance work is identified.
Responsible in preparation of ITP‘s, closes-out of non-conformance report, corrective and preventive action reports.
Performs verification and certification of test results and supporting documents.
Supervises and monitors all welding activities, welding parameters.
Reviews and interprets the radiographic film. Analyze the welding defect & its Structure.
Performs NDT Inspection (RT, UT, PT, MT, VT). Perform UT lamination, scanning of weldments for Plates, Pipe, Tanks and etc. Makes daily welded report & Request NDT/ PWHT/Hardness Inspection.
03/2004 – 04/2004 KPOC - SAIPEM/CCIC.S.A.L, Kazakhstan
Structural / Welding / Piping Inspector, Company Background: Shut Down Project to modify piping lines and equipments system
including maintenance of tank, piping works, installation of equipment. Assign in Unit 2
Karachaganak Petroleum Operating Corp. (KPOC-SAIPEM/CCIC) Consortium.
Key Roles and Technical Skills:
Reports to Quality Manager.
Responsible for monitoring of all welding activities
Performs required inspections, walk-down; punch & witnesses test packs & arrange for NDT of associated welds.
Performs weld measurement for socket weld/fillet weld & performs line checking.
Responsible for making DWR and requests NDT/ PWHT / Hardness inspection.
Reviews the x-ray & gamma ray film.
Responsible for making test pack as per ISO Standard.
Witnesses and monitors bolt tensioning on manifold using STS-3 & STS-4.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 12
Rev 6 (03-Feb-09)
Witnesses and monitors in pneumatic and hydro test testing.
Performs walk down for re-statement of all line that cover test packages.
09/2003 – 01/2004 Tuboscope Vetco LTD, KSA
Plant Inspector (Structural/Welding/NDE),
Company Background: Plant Inspection, corrosion monitoring and surveillance
for all the equipment’s, pipelines and Tank storage of
Saudi Petrochemical Co.(SADAF-SABIC)
Key Roles and Technical Skills:
Reports to Quality Manager and Plant Service Manager.
Assists classification of piping Systems per API-570 Code and SADAF procedure SEI-3.1.
Responsible in developing and marking-up of mechanical flow diagrams in P&ID by assigning system numbers for classified piping systems that requires corrosion monitoring and/or periodic visual Inspections.
Performs visual inspection on all classified piping systems throughout the plant at a determined frequency.
Performs RISK BASED INSPECTION for all equipments of plant in all facilities of Sadaf.
Responsible for the maintenance NDT Field Inspection Crew and Equipment used in corrosion monitoring and piping system.
Uses Radiographic(Gamma Ray) and Ultrasonic Testing USN-25, Panametric (Epoch 1,2,3) & DMS Equipment for Thickness gauging, Lamination Checking ,Scanning of weldments. Conduct Magnetic Particle Testing as well as Dye Penetrant Testing in all equipment and piping that requires the said methods. Conduct MFL for tank inspection.
Responsible in preparation of accomplishment report and drawing of inspected, evaluates indications, processes and interprets radiographs as per applicable codes, standards and procedures.
05/2002 – 08/2003 Industrial Inspection Inc., Phil.
NDE Inspector
Company Background: Plant Inspection, 3rd Party Inspection Services for Oil & Gas,
Petrochemical Refinery Including Fabrication.
Project assigned on local Onshore: Caltex refinery, Shell refinery, Petron refinery, CBI fabrication, Cape east fabrication, Keppel shipyard, Bobcock Hitachi Phil., Phil. National Oil Co., EEI fabrication, Phil. Geothermal Plant, National Power Corp, First Gas Sta Rita Phil Power Plant CGT-500MWATT, Ilijan Power Plant, LMG, Cocochem Phil.,
Project assigned on local Offshore: Halliburton Malampaya Shell – Concrete Gravity Structure platform Barge at Palawan; Phil.
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 13
Rev 6 (03-Feb-09)
Key Roles and Technical Skills:
Reports to Quality Representative and Plant Service Manager.
Responsible for all non-destructive testing techniques to be performed such as radiographic testing, Ultrasonic testing, Magnetic Testing and Penetrant Testing.
Uses Equipment for NDE Inspection are RT-Gamma ray, UT-stresstel, kruatkarmer (US K6, USN 50, USN 52, and USN 25), MT-Magnetic yoke.
Responsible for preparations of radiographic report, loading of film, developing of film, Set-up the equipment in gamma and X-Ray and implementing of many techniques in NDT.
Performs interpretation of film X-Ray result and Holiday Detector for paint coating.
04/2001 – 04/2002 OPHIR Construction Corp., Phil.
Civil Engineer
Company Background: Construction and development of Eastwood City(Quezon City) Lafayette Project:
3-High Rise Hotel Building(29,30 & 31 Storey Hotel Buildings)
Roads and Utilities.
Landscaping.
Key Roles and Technical Skills:
Reports to Construction Manager
Responsible for project supervision of work phases as per specified plan and project specification
Monitors the daily/weekly progress of work in accordance to the given time table on project planning schedule
Responsible for the review of drawing and makes estimate and program of work for propose construction project
Prepares and updates materials take-off from drawing and compare to site installation or progress works
Performs quantitative & site measurement for civil, mechanical works
Prepares monthly progress report for billing purposes
Responsible for securing field data to make As-built Drawing & some Sketches for back-up of progress claim.
Performs the inspection and testing or witnessing the inspection and testing by others, as laid down in the Inspection and Test Plan.
Certification & Core Qualification:
Registered Civil Engineer License #: 0092994 Philippine Government Licensure Exam Date Issued: 21 May 2002
Certified Six Sigma Yellow Belt Certification #: PT-SS03-070 Pera-Neville Clark, Philippines Date Issued: 21 Oct. 2011
Certified Lead Auditor / Auditor (Internal & External) Registration #: PPSQ208-2051
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 14
Rev 6 (03-Feb-09)
QMS/ISO 9001:2008 Date Issued: Aug. 2010 Pera-Neville Clark, Philippines
Certified Construction Quality Management Date Issued: July 17, 2005 US Army Corps of Engineer-USACE Mazer E Shariff; Afghanistan
Certified Welding Inspector (CWI) Certification #: 1000087 Philippine Welding Society (PWS) Validity date: Sept.1 2009
Certified NDT Inspector-Level 2 (ASNT-TC-I1)
Radiographic Testing Ultrasonic Testing Magnetic Testing Liquid/Dye Penetrant Testing
Vetco Arabia, KSA - 2003
Certified NDT Inspector-Level 2 (PSNT-IAEA-TECDOC-407) Radiographic Testing Ultrasonic Testing Magnetic Testing Liquid/Dye Penetrant Testing
Philippines- July 2001
Computer Literate: Primavera 6 (Planning & Scheduling); AutoCAD 2000; STAAD Procore, MS Word; MS Excel & etc.
EDUCATION
University Technological Institute of the Philippines Bachelor of Science in Civil Engineering 1996~2001
Construction Quality Management System U.S Army Corps of Engineers, Afghanistan 2005
Quality Management System / ISO Standard Pera-Neville Clark 2010
Understanding the NEW ISO 9001:2008; QMS-The Process Approach Pera-Neville Clark 2010
Senior Management - Six Sigma Yellow Belt Pera-Neville Clark Oct. 2011
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 15
Rev 6 (03-Feb-09)
REGISTRATIONS/AFFILIATIONS
Registered Civil Engineer License #: 0092994 Philippine Government Licensure Exam Date Issued: 21 May 2002
Member of American Society of Non Destructive Testing (ASNT)
Member of Philippine Welding Society (PWS)
Member of Philippine Non-Destructive Testing (PSNT)
Member of Philippine institute of Civil Engineer (PICE) Member of Saudi Council of Engineer (SCE)
Additional Information
Training and seminar:
Primavera 6 (Planning & Scheduling) Trainors Technology International Inc. Jubail; Kingdom of Saudi Arabia. 01 June 2012
NDT Level 2 - ASNT Ultrasonic Testing (UT), Radiographic Testing (RT), Dye Penetrant/Liquid Penetrant Testing (D/LPT), Magnetic Particles Testing (MPT).
NDT Level 2 - PSNT Ultrasonic Testing (UT), Radiographic Testing (RT), Dye Penetrant/Liquid Penetrant Testing (D/LPT), Magnetic Particles Testing (MPT).
Sea survival and HUET under water training, Fire Fighting, Personal Survival Technique, Survival
Craft and First Aid at Sea – Safety Offshore VGTC, Qatar 2006
H2S Breathing Apparatus Course – Safety Offshore Venture Gulf Training Center, Qatar 2006
HSES Supervision & Leadership Program JGC Middle East, Qatar- Aug.15, 2006
Basic Safety Training Personal Survival Technique (IMO Model Course 1.19) Fire Prevention & Fire Fighting (IMO Model Course 1.20) Elementary First Aid (IMO Model Course 1.13)
GILBERT V. INANDAN
Tel.#: +63 437064244
Mob: +63 9204416501(Main Contact)
Email: [email protected]
Resume
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 16
Rev 6 (03-Feb-09)
Personal Safety & Social Responsibility ( IMO Model Couse 1.21) Philippine Seafarers Training Center, Philippines; May 29, 2004
AUTOCADD 2000-3D & rendering Design MICROCADD, Philippines 2001
STAAD PRO-CORE MICROCADD, Philippines 2001
Achievements:
Excellency Project Employee Award
August 2012
MIC / WorleyParsons Arabia
Award & Signed: Project Director- Donald Siebarth
Excellency Project Employee Monthly Award
November 2009
MIC / WorleyParsons Arabia
Award & Signed: Project Director- Lynn Fieldmann
References:
Mr. Donald Siebarth WorleyParsons Project Director
Lee Hadick Fluor Quality Director
Robert Harrington WorleyParsons Location Quality Manager
Terry J Myers WorleyParsons Quality Manager
Craig Herman WorleyParsons Construction Director