AfterConstruction
Birgitta FosterSSA/Sandia National Labs
1945 : Sandia was created
1979 :Sandia was made a national laboratory.
Mission :Nuclear stockpile stewardshipHomeland security
Antiterrorism/Aviation securityTech Transfer
www.sandia.gov
Four sites ( ~ 1100 bldg, 7M GSF)
NM (Albuquerque ) CA (Livermore) NV (Tonopah) HI (Kauai)
Sandia NM
891 Bldgs 6M GSF 8700 acres
Construction : $80 M /YR
BIM = Information
BIM is a database of Building Information.
Stores InformationLinks to informationALSO….Extracts informationExchange information
BIM after Construction
Space Planning
Safety/Security
Facility Management System - ( FMS)
Facility Control Systems - (FCS)
Asset Management applications
Operation & Maintenance
Building InformationSpecifications
Submittal InformationEquipment dataPerformance dataWarranty
Finishes Information
O&M manuals
Panel Schedules
FCS
Building Information Applications
BIM : Facilities Management (6D)
BIM (6D) : Exchanges Information
Equipment data
Asset info
Room Info
FMS : Tririga/ Maximo
BIM: Untapped SavingsIn
form
atio
n Va
lue
TimePlanning
ConstructionDesign
Operation
$$$$
$$$
BIM : Due Diligence Investigation
Shadow project Partnerships
Software
Pulsing Industry
O&M Planning
Data Integration
Accurate As Built Models
Retrofits
Migration to BIM
Attracting new Customers
BIM : Laser scanning
BIM (6D): Bldg Operations Training
Pantex complex Amarillo, Texas. (CH2M-Hill)
BIM : Untapped Savings
Inefficiency Costs : $15B/yr
66% borne by Owners
Unit cost : $ 0.20/SFT (existing space)
Est. Costs for Sandia : 6.0 M GSF ~$1.2M / yr
BIM : Untapped Savings
NIST Study Validation: “View of the Future “ videoIn-House Planner Survey
ResultsSaves 2 hours per work order (WO)
(2 hrs x $50/hr ) x 24,000 WO
Cost Savings : $2.4 M/year Annual Budget : $14M/yr
BIM (6D) :Closing the Information Gap
Paper-based
Inherent Inefficiencies Reentry data Multiple databases Handoffs Locating Information
But what if it could be like this…………
BIM: 6DHow to get started
Start with O&M group What information is needed IT and O&M meeting
FMS Import options Selected preferred import format Determine fields
Use on Pilot project
BIM: What’s holding Owners back?
What Owners want : Save moneyCentralized Data repositorySeamless integration with FMS applications Save money $$$
Concerns :Education on BIM
Updating Model information
O&M Savings are not immediate
Model sharing
BIM:Owners next steps
Get to know your O&M team
Investigate integration withFacilities Mgt systems Building Control systemsAsset Management system
Require 6D BIM as a deliverable
Determine Owner Information needsDefine 6D BIM data requirements
BIM : Sandia Facilities
FMSINTERFA
CE(Excel -Manual)
6D Integrat
edMODEL
INTERFACE(Excel –
Extracted)
PHASE A
PHASE C
PHASE B
SEAMLESS
Integrated 6D model Software
Migration plan ( Road map)
Internal processes BIM team Model Management
Meeting with IT and O&M FMS Import options Selected preferred import formatDetermine fields
Use on Pilot project
Migration plan in process Seamless integration – bi
directional Receiving Integrated 6D
models O&M with models
Menu
BIM: 6DHow to get started
Determine what you need