DWEASeminar about retrofit & serviceParis, France – 6 June 2016
Frank SvarreGlobal Sales [email protected]
The DEIF Group – ”Power in Control”
1933 - 80+ years of achievement
Skive, DK - Group headquarters
17 - Sales & training centers globally
650+ - Employees
10.4% - Avg. annual growth 2010-2015
€ 83.000.000 - 2015 turnover
Wind Power Technology• Control System Solutions• Pitch Control Systems• Turbine Controllers &
Technologies• Park Control & SCADA
Marine & Offshore• Marine• Oil & Gas• Bridge Instrumentation• Switchboard Equipment
Energy• Diesel & Gas• Hydro• Steam• Switchboard Equipment
Why retrofit ?
• Reduced income due to reduced energy generation caused by de-rated performance and reduced uptime.
• Increased service cost due to increased failure rate caused by wear and tear, overload, misalignment, among others.
• End of life causing limited access to spare parts resulting in increased cost and increased down time.
• Reduce tariffs combined with new grid code requirements force Owner to invest in a midlife upgrade with focus on improved performance and life extension.
What are the pains ?
What strategy ?
0 – 200 kW 200 – 1.000 kW 1 – 3 MW 3 – 10MW+
“Just do it” Simulation on site data
Measurement campaigns
Typecertifications
Risk Revenue
MW
Complexity
Adjust your retrofit strategy according to • Potential business case • Technical complexity and Risk• Local legal requirements
V42/44/47V22/27GE1.5
S88ECO48 NM48/52/64
G47/52/58 GEV26/32
E3120
B62/SWT1.3
N43/50
What retrofit solutions do we offer ?
• Onsite retrofit • Cost optimized solution/minimum changes “Plug & Play”• Controller upgrade only with minimum of sensor upgrade
• Renew of existing control cabinets• Cabinet redesign with new selected LV components• Controller upgrade• Customized sensor upgrade package
• New control cabinets• Complete upgraded solution targeting refurbished turbines• Cabinet design and complete drawings for localized
production• Controller upgrade• Customized sensor package upgrade.
Retrofit concepts for any turbine type and O&M demand
What is the problem ?
Does this look familiar??
• One owner spend 298.900 EUR in VRCC repair of 136 out of 426 Vestas V47 in 2015
• Investigations shows that in many sites the V47 is only operating at rated power in 2-3 % of the operating time
• DEIF is offering a solution where it is possible to reduce the cost of repairing or investing in expensive refurbishing units of RCC/VRCC
Reducing VRCC / RCC cost on Vestas V42 / V44 / V47
What is the cost ?
Business as usually• VRCC: MTBF 3 years• VRCC: Avg. Full repair cost -5.520 EUR• COTAS: New cost -10.800 EUR
Total cost: -27.360 EUR
Upgrade to AWC 500• New AWC 500 controller: 12.500 EUR• Finans model: 15% down payment / 2.500
EUR• Increase in AEP: 2,5% • Total cost savning: 27.360 EUR
Improved business: 28.860 EUR
Source: Owner of 426 Vestas V47, Avg. age 16 years
Upgrade now – be ready – Pay later
How do we increase the AEP ?
• 9 x cable twist stop with original yaw strategy• 1 x cable twist stop with intelligent yaw strategy• Reducing downtime with 8 hours / turbine / year• +74.000 kWh / year • @ 25 turbines V47
Less stops due to intelligent yaw: Real site data case
• Controller HW replacement• Less stops due to intelligent yaw and
Cable twist• High Wind Ride Through• Pitch failure reduction• VRCC major failures (breakdowns)• VRCC minor failures (Coms)• General stops due to high temperature
limitations• Stops related to fixed threshold values • Other not defined stops
Source: Site data from 150 days from Jan – June 2014
By Improving availability..
What have we done ?
4 % increased AEP, Improved low and medium wind performance.
• Complete re-engineered control panels exchanging original controllers in MD series Repower design
• Pitch controller retrofitted from L&B• Complete SCADA and Park Power Control
Case 1: Complete retrofit of WTG
One of DEIF’s core competences is electrical Pitch systems.
• MOOG and SSB pitch drive replacements are available • New improved technology including functional safety
support • Newly installed 2.1 MW system
Case 2: MW Electric pitch retrofit
Thanks
Thank you for your attention and please find additional information and product cases on
www.deifwindpower.com
Or our new product catalogue
DEIF Wind Power Technology - Product overview
Designs, develop, manufactures and integrate the complete electrical control system for a wind turbine.
• Unique Modular Control strategies based on decades of experience
• Design references from 150 kW to 7 MW
• System integration on thousands of turbine installations
• Park Control and SCADA systems operating daily around 3 GW of wind power.
Control solution for all new, refurbished or retrofitted wind turbines.
Pitch motor drive
Pitch and Turbine controller
SCADA Solution
Park controller
What is the result ?
• Access to spare parts is limited and second hand repairs
• Low tariffs which lead to focusing on improving the existing fleet
• Expensive spare parts from the OEM
• Closed SCADA and asset management interface
• Extended turbine lifetime• Refurbished VRCC/RCC modules• Less service cost• Higher availability => higher revenue• New Management system (SCADA)
interface• Automatic reset of alarms• Control of turbine parameters• New intelligent power control
• Reducing power output instead of stopping
• Maximum payback time < 3 year on investments
• Solutions are aimed to have 1:1 replacements either directly or using prepared mounting kits.
• 5 years standard warranty. Up to 10 year warranty on request and with a fixed price
• Access to a full open turbine information mapping
• Direct cost savings on own “OEM” spare parts supply and clear supply channel.
Pain Solution Gain