NASHVILLE AREA MPO FY 2014-2017 TIP - ADOPTED DECEMBER 11, 2013
WILSON
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Link Beckwith interchange on I-40 to US70 via a new/widened 3 lane roadway
From I-40 to US-70/SR-24Location
Route Beckwith Road/Eastern Connector
$25,450,000.00Air Quality Status 115745.00TDOT PINNon-Exempt Project Cost
Wilson County 5.00 1072-132Regional Plan IDLengthCounty
TIP # 2008-71-038
Mt. JulietLead AgencyNew RoadImprovement Type
Beckwith Road/Eastern ConnectorProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$750,000.00$0.00$3,000,000.00$3,750,000.00U-STPCONSTRUCTION2014
$3,000,000.00$0.00$12,000,000.00$15,000,000.00U-STPCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
1/4/13 - This project has been designed and is now at theobtaining of Right-of-Ways. The next phase will be to updateany plans that have been previously approved after ROWnegotiations are completed. We would anticipate thishappening by September 2013. After all drawings arecompleted and approved by TDOT, and the Federal HighwayAdministration, we would then go to bid on this project. Weanticipate that by Spring of 2014, that the bid would beawarded and construction began by Summer of that sameyear. Our goal would be that construction would be completedno later than 12 to 18 months after the contractor is giving thenotice to proceed.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
177/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct a multi-use path that will provide for pedestrian/bike travel between Greenhill Road and theMusic City Star terminal. Phase 2 will extend from 4th Avenue to Brookstone Blvd.
From 4th Avenue to Brookstone BlvdLocation
Route Town Center Trail
$1,473,615.00Air Quality Status 112919.01TDOT PINExempt Project Cost
Wilson County 0.70 1076-303Regional Plan IDLengthCounty
TIP # 2008-76-024
Mt. JulietLead AgencyGreenwayImprovement Type
Town Center Trail - Phase 2Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$14,188.00$0.00$56,751.00$70,939.00CMAQCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
178/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Reconstruct and widen from 2-lane to 4-lane
From north of SR-24 (US-70) to south of Dry Fork CreekLocation
Route SR-109
$39,700,000.00Air Quality Status 100281.02TDOT PINNon-Exempt Project Cost
Wilson County 3.60 1072-348Regional Plan IDLengthCounty
TIP # 2009-72-035
TDOTLead AgencyRoad WideningImprovement Type
SR-109 Reconstruction & WideningProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$0.00$720,000.00$2,880,000.00$3,600,000.00NHPPROW2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
179/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Reconstruct and widen from 2-lane to 4-lane
From south of Dry Fork Creek to south of the Cumberland RiverLocation
Route SR-109
$36,500,000.00Air Quality Status 100281.03TDOT PINNon-Exempt Project Cost
Wilson County 3.50 1072-348Regional Plan IDLengthCounty
TIP # 2009-72-036
TDOTLead AgencyRoad WideningImprovement Type
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$0.00$680,000.00$2,720,000.00$3,400,000.00NHPPROW2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
180/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Resurfacing, restoration and rehabilitation improvements of various roads in the City of Lebanon.
Various Locations within the City of LebanonLocation
Route City of Lebanon 3R Improvement Program (Grouping)
$388,853.00Air Quality Status TDOT PINExempt Project Cost
Wilson County 0.00 1072-284Regional Plan IDLengthCounty
TIP # 2010-79-005
LebanonLead AgencyResurfacingImprovement Type
City of Lebanon 3R Improvement Program(Grouping)
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$77,771.00$0.00$311,082.00$388,853.00L-STPPE, ROW,CONSTRUCTION
2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
181/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Widen I-40 from 4 lanes to 8 lanes with High Occupancy Vehicle (HOV) lanes.
From SR-109 to SR-840Location
Route I-40
$40,000,000.00Air Quality Status 115791.00TDOT PINNon-Exempt Project Cost
Wilson County 3.00 1072-214Regional Plan IDLengthCounty
TIP # 2011-72-164
TDOTLead AgencyRoad WideningImprovement Type
I-40 Widening & HOVProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$0.00$50,000.00$200,000.00$250,000.00NHPPPE-D2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
182/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Multi-use paved trail extension from trailhead location at Hickory Ridge Road along Bartons Creek to thesouth connecting with existing and proposed schools and continues under Leeville Pike and acrossBartons Creek to McClain School.
From East of Hartmann Drive along Bartons Creek to McClain SchoolLocation
Route Cedar City Trail - Phase 5 (Bartons Creek South)
$1,576,437.00Air Quality Status 110508.01TDOT PINExempt Project Cost
Wilson County 2.00 1076-305Regional Plan IDLengthCounty
TIP # 2011-76-035
LebanonLead AgencyGreenwayImprovement Type
Cedar City Trail - Phase 5 (Bartons CreekSouth)
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$2,200.00$0.00$8,800.00$11,000.00CMAQPE-N2014
$19,800.00$0.00$79,200.00$99,000.00CMAQPE-D2014
$5,000.00$0.00$20,000.00$25,000.00CMAQROW2014
$4,900.00$0.00$19,600.00$24,500.00CMAQCONSTRUCTION2014
$255,787.00$0.00$1,023,150.00$1,278,937.00ENHCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
183/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Implementation of a fully functioning, reliable adaptive signal control system through the installation of amaster signal controller, wireless communication devices, and radar detection for both vehicular andbicycle (self-propelled) traffic.
Various intersections along SR-171/ Mt. Juliet RdLocation
Route
$653,000.00Air Quality Status 119203.00TDOT PINExempt Project Cost
Wilson County 1.10 1087-701Regional Plan IDLengthCounty
TIP # 2013-77-218
Mt. JulietLead AgencyITSImprovement Type
SR-171 (Mt. Juliet Road) Traffic AdaptiveSignal Control System CorridorOptimization Project
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$68,000.00$0.00$0.00$68,000.00LOCALPE-D2014
$117,000.00$0.00$468,000.00$585,000.00U-RSVCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
184/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Replacement of existing trees with healthy trees, installation of a raised planter/seat wall and related plantmaterial at the public square, intersection of Hwy. 70 and US 231.
Intersection of Hwy 70 and US-231Location
Route Intersection of Hwy 70 and US-231
$37,881.00Air Quality Status 105525.37TDOT PINExempt Project Cost
Wilson County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-712-036
LebanonLead AgencyStreetscapingImprovement Type
Lebanon Public Square GatewayProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$7,576.00$0.00$30,305.00$37,881.00STATE(Roadscape)
CONSTRUCTION, PE-N
2014
REVISION HISTORY
PROJECT NOTES
Funding through TDOT Roadscape Program
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
185/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construction of a permanent multimodal commuter rail station along the existing Music City Star Rail Line.
Music City Star Line @ Hamilton SpringsLocation
Route Hamilton Springs Station Construction
$2,000,000.00Air Quality Status TDOT PINExempt Project Cost
Wilson County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-75-021
RTALead AgencyTransit CapitalImprovement Type
Hamilton Springs Station ConstructionProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$32,000.00$0.00$128,000.00$160,000.00U-STPPE-D, PE-N2014
$368,000.00$0.00$1,472,000.00$1,840,000.00U-RSVCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
1/24/13 - The City of Lebanon currently has over twenty activegrants. Some of our active grants are COPS grant, AirportTerminal Construction grant, Permobile-FIDP, Permobile-SIA,JAG grants, Waste Water Treatment Plant, and TDOTRoadscapes. All of the grants must receive Council approvalhttp://hamiltonspringsstation.com/wp-content/uploads/2011/10/Lebanon-Resolution.pdf. At the timethe grant is awarded, a group of accounts is set up to capturethe revenues and expenditures. Once the money is spent, thegrant accountant tracks the grant and reports to the variousagencies on a quarterly basis. This is a coordinated effortbetween the various departments. At year end, all the grantsare audited by external auditors for compliance. A copy of theaudit is available upon request.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
186/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct a multi-use path that will provide for pedestrian / bike travel between Greenhill Road and theMusic City Star Train Station. Phase 3 will extend from Brookstone Blvd to Greenhill Road.
From Brookstone Blvd to Greenhill Rd.Location
Route Town Center Trail - Phase
$2,693,750.00Air Quality Status TDOT PINExempt Project Cost
Wilson County 1.00 1076-303Regional Plan IDLengthCounty
TIP # 2014-76-017
Mt. JulietLead AgencyGreenwayImprovement Type
Town Center Trail - Phase 3Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$75,000.00$0.00$0.00$75,000.00LOCALPE2014
$164,976.00$0.00$659,904.00$824,880.00U-RSVCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
1/4/13 - This project has been designed and the first phase iscomplete. The next phase will be to update any plans thathave been previously approved after ROW negotiations arecompleted. We would anticipate this happening by April 2013.After all drawings are completed and approved by TDOT, andthe Federal Highway Administration, we would then go to bidon this project. We anticipate that by Summer of 2013. Afterthat the bid would be awarded and construction began by Fallof that same year. Our goal would be that construction wouldbe completed no later than 12 to 18 months after thecontractor is giving the notice to proceed.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
187/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construction of sidewalk, utility relocation, and ROW acquisition near Walter J. Baird Middle School.
Walter J. Baird Middle School - Greenwood Ext. and W Forrest Ave.Location
Route Greenwood Ext. and W Forrest Ave.
$215,330.00Air Quality Status 114385.00TDOT PINExempt Project Cost
Wilson County 0.40 ConsistentRegional Plan IDLengthCounty
TIP # 2014-76-033
LebanonLead AgencySidewalksImprovement Type
Walter J. Baird Middle School - Phase IIProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$0.00$0.00$215,330.00$215,330.00SRTSPE, ROW,CONSTRUCTION
2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
188/191Page
1/2/13 -1 month from award of grant- Send out any necessaryRFP's/RFQ's for lighting interchange lighting and way-finding/signage design.3 months from award of grant- Obtain servicesof qualified professionals and begin design and permittingwork.4 months from award of grant- seek additional input fromthe Joint Economic Development Board of Wilson County,other governmental agencies such as the County RoadCommission and Lebanon Public Works, localcommunitymembers, and business interests along the S.R.840 corridor.5 months from award of grant- Insure necessarydesign approvals are received from the State of Tennesseeand other interested agencies. Send out request for bids.6months from award of grant- Select appropriate bid and awardproject6.5 months from award of grant- Hold pre-construction/pre-installation conference with necessaryparties.7 months from award of grant- Begin construction/installation in earnest\10 months from award of grant-complete major work and seek approval and necessarypermitting or authorization for operation. Make necessaryadjustments or corrections to project.12 month from award ofgrant- project completion declared.To our knowledge, WilsonCounty has not undertaken a lighting and way-finding projectof this magnitude. However, we have undertaken otherinfrastructureprojects such as sewer construction in theGladeville community, major school construction projects, andbridge/ road construction projects throughout Wilson Countywith success and on-time. Additionally, this is proposed tooccur along a State Route. We in Wilson County would not beopposed to having oversight by the State of Tennessee onsuch a project. That being said, we are willing to undertakedirect oversight of the project if necessary.
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Design and installation of interchange lighting; and way findingsignage at the approaches to thisinterchange directing Freight Traffic with specific industrial destinations along SR-840 to the CouchvillePike Exit (one Exit South) and Central Pike/HWV 109 Exit (one Exit North) where the primary freightaccess for these industrial establishments is located.
SR-840 at Stewarts Ferry PikeLocation
Route Stewarts Ferry Pike/State Route 840 Interchange lighting and signage project
$350,000.00Air Quality Status TDOT PINExempt Project Cost
Wilson County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-77-016
Wilson CountyLead AgencySignage/WayfindingImprovement Type
Stewarts Ferry Pike/State Route 840Interchange lighting and signage project
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$25,000.00$0.00$100,000.00$125,000.00U-STPPE-D2014
$62,500.00$0.00$250,000.00$312,500.00U-RSVCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
189/191Page
1/2/13 -1 month from award of grant- Send out any necessaryRFP's/RFQ's for lighting interchange lighting and way-finding/signage design.3 months from award of grant- Obtain servicesof qualified professionals and begin design and permittingwork.4 months from award of grant- seek additional input fromthe Joint Economic Development Board of Wilson County,other governmental agencies such as the County RoadCommission and Lebanon Public Works, localcommunitymembers, and business interests along the S.R.840 corridor.5 months from award of grant- Insure necessarydesign approvals are received from the State of Tennesseeand other interested agencies. Send out request for bids.6months from award of grant- Select appropriate bid and awardproject6.5 months from award of grant- Hold pre-construction/pre-installation conference with necessaryparties.7 months from award of grant- Begin construction/installation in earnest\10 months from award of grant-complete major work and seek approval and necessarypermitting or authorization for operation. Make necessaryadjustments or corrections to project.12 month from award ofgrant- project completion declared.To our knowledge, WilsonCounty has not undertaken a lighting and way-finding projectof this magnitude. However, we have undertaken otherinfrastructureprojects such as sewer construction in theGladeville community, major school construction projects, andbridge/ road construction projects throughout Wilson Countywith success and on-time. Additionally, this is proposed tooccur along a State Route. We in Wilson County would not beopposed to having oversight by the State of Tennessee onsuch a project. That being said, we are willing to undertakedirect oversight of the project if necessary.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
190/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Install Interchange Lighting.
I-40 at Mt. Juliet RoadLocation
Route Interchange Lighting on I-40 at Mt. Juliet Road
$1,000,000.00Air Quality Status TDOT PINExempt Project Cost
Wilson County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-79-018
Mt. JulietLead AgencySafetyImprovement Type
Interchange Lighting on I-40 at Mt. JulietRoad
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$100,000.00$0.00$0.00$100,000.00LOCALPE-D2014
$760,000.00$0.00$140,000.00$900,000.00U-RSVCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
191/191Page