[Metni yazın]
We Bring Power…
www.cbbsgroup.com
Mustafa Kemal Mah. 2138. Sok. No:6 Daire:1 Çankaya/Ankara
Tel (pbx): +90 (312) 502 18 90
CBBS INCORPORATION COMPANY REFERENCES
OUR SPECIALTIES
1. Equipment and Instrumentation of Power Plants and Industrial Facilities
• Detail Design
• Supply and Manufacturing
• Erection and Commissioning
2. Boiler and Steam Turbine Parts Maintenance and Modernization • Steam Turbine Feasibility Workout
• Disassembly and Precision Assembly
• Commissioning and Supervision
3. Electrical and I&C Works in Industrial Facilities • Electrical and I&C Design
• Power and Signal Cabling
• Modernization Works
• Supply and Manufacturing
CBBS Inc.
2016
We Bring Power…
CBBS INCORPORATION COMPANY REFERENCES
OUR REFERENCES
COMPLETED PROJECTS
1. SOMA KOLİN 2x255 MW COAL FIRED POWER PLANT
1.1. Erection 2 units of Rotary Air Preheaters
Subcontractor: CBBS Mühendislik Makina İnşaat ve Ticaret A.Ş.
Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.
Client: Kolin İnşaat A.Ş.
Project Start: 17.04.2017
Project Completion: 31.08.2017
Amount of Work: 1000 tons, 22.000 man-hours
CBBS INCORPORATION COMPANY REFERENCES
CBBS INCORPORATION COMPANY REFERENCES
CBBS INCORPORATION COMPANY REFERENCES
CBBS INCORPORATION COMPANY REFERENCES
COMPLETED PROJECTS (Individual References Belong
to Shareholders)
1. YUNUS EMRE 2x145 MW COAL FIRED POWER PLANT
1.1. Erection of Turbine Island Equipment, Piping and
Instrumentation including tests and cold commissioning
Yunus Emre Power Plant 2 units of Steam Turbine and its related equipment were supplied by Doosan Škoda Power. Turbine was single shaft MTD40CR type with total gross weight of 250 tons. Condenser was supplied by MICo, spol. s.r.o, with total gross weight of 140 tons. Condenser shell and tube parts were delivered as preassembled, i.e. no tube expansion was applied on site. Generator was supplied by SIEMENS AG, Plant Erfurt. Generator was single part with total gross weight of 230 tons. Design and EPC delivery of Turbine Island Equipment, Piping and Instrumentation was carried out by CKD Praha DIZ, Czech Republic.
Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.
Client: CKD Praha DIZ
Amount of Work: Approximately 200.000 man-hours
Dates: 10.2013 – 2.2015
CBBS INCORPORATION COMPANY REFERENCES
CBBS INCORPORATION COMPANY REFERENCES
1.2. Erection and Commissioning of CFB Boiler, FGD, Electrostatic
Precipitator and Auxiliary Systems
Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.
Client: Vitkovice Power Engineering s.a
Supplier of Equipment: Andritz Energy Environment Gmbh
Amount of Work: Approximately 2 million man-hours, 15.000 tons of erection
Dates: 11.2012 – 7.2016 (First Unit commissioned, Second Unit suspended at stage of steam blow-out)
CBBS INCORPORATION COMPANY REFERENCES
CBBS INCORPORATION COMPANY REFERENCES
1.3. EPC Delivery of Auxiliary Boiler, Heat Exchanger System and
Fuel Oil Pumping Station – Design, Manufacturing, Erection,
Commissioning and Performance Tests
EPC Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.
Client: Vitkovice Power Engineering s.a
Dates: 7.2014 – 1.2016
1.4. Lifting of 560 ton Economizer using Hydraulic Jacking System
CBBS INCORPORATION COMPANY REFERENCES
2. MERSİN SODA SANAYİ A.Ş. 320 t/h CAPACITY CFB BOILER
2.1. EPC Delivery of CFB Boiler, Bag Filter and Material Handling
Systems – Design, Manufacturing, Erection, Commissioning,
Performance Tests and Optimization
A CFB Boiler with 320 t/h steam generation capacity was delivered to Soda Sanayi A.Ş. who is a subsidiary
of Şişecam group companies. Boiler, Bag Filter, Coal Preparation, Ash Handling and other auxiliary systems
were delivered by EFOR-RAFAKO consortium. The boiler is operated by using import coal. The project was
completed in 26 months from contract signature to commissioning finished.
EPC Contractor: EFOR Endüstriyel Tesisler Montaj İmalat ve İnşaat A.Ş.
Client: Soda Sanayi A.Ş.
Dates: 9.2014 – 11.2016
CBBS INCORPORATION COMPANY REFERENCES
2.2. Heat Balance Calculation of the Boiler including Design of Boiler
and its Components’ Insulation
2.3. Design, Manufacturing and Commissioning of Venturi Type
Flowmeters according to EN ISO 5167
END OF DOCUMENT