NASTON ENGINEERING NIGERIA LIMITED
HEAD OFFICE:WATER HOUSE, IPONRI1, Afric Road, Off Funsho Williams Avenue,Beside Leadway Assurance, Iponri, Lagos, Nigeria
WATER TREATMENT ENGINEERS AND CONTRACTORS
WHO WE ARE- Introducing NastonNaston Engineering Nigeria Ltd. is a leading indigenous engineering and contracting company in the field of water and wastewater treatment systems, sewage treatment, bulk and domestic metering systems, tank fabrication and pumping systems.
The company's unique range of different technologies come from her research and development centres, constant liaison with world leaders in engineering and ensures that our clients (which includes private companies, municipalities, governments, and international organizations) receive the most innovative and effective technological solutions.
With several years of experience, we are able to draw upon an unsurpassed knowledge of traditional and innovative solutions in order to meet the demands of both industrial and municipal client.
We have executed projects for many states and the federal government and have participated in a number of local and internationally funded projects and are conversant with international procurement Procedures.
2
Introducing NastonOur mission is to transform lives by providing systems that adhere to international standards.
The management and staff of Naston (of more than 60 employees) are committed to ethical business practices and professional conduct. The company led by professional engineers with more than 20 years of combined experience in the field of waste management, industrial waste water management, operation and maintenance management, turnkey projects, process reengineering, health and safety management and cost reduction program.
3
WHAT WE DO- Our Products/ServicesNaston Engineering's services include:
Feasibility studies, Procurements and Supply of equipment, Construction of water treatment plant (Fabrication, Installation
&Erection),Geo-physical services and Drilling of boreholes, Project Management, Operation and Management of Plants, Metering (Bulk and Domestic), Commissioning of Plants and Equipments, After-sales service maintenance, Plant monitoring and staff training, Rehabilitation and upgrading of Waterworks for public and
private sectors,We operate a standard laboratory equipped with modern
equipments to carry out water Analyses. 4
5
Our Products
We also offer engineering Services in the following areas:
Packaged Water Treatment Plants, utilizing raw water from boreholes or Rivers to produce potable water,
Municipal Water Schemes for Township and Urban centre,
Supply and Installation of Metering devices, including Pre-paid meters, Domestic Meters, Nodal Flow Meters, etc.
Sewage Treatment Plants for small communities as well as more elaborate schemes for larger communities.
6
Metering
We promote world class metering solution for both Nodal and Domestic metering. These meters are fully Electronic, intelligent thus offering exceptional features such as: Exceptional Accuracy, Durability, Reliability/Sustainability, Maintenance Free, and Good Security.
7
MeteringVISUAL DISPLAY OF REMOTE METER READING FROM ONE
OF THE INSTALLED ELECTROMAGNETIC FLOW METER
8
SOME OF OUR METERING PROJECTS
Procurement and Installation of Prepayment Water Meters in Gwarinpa
II Housing EstateClient: FCT, AbujaFinancier: World BankDate of Award: July, 2009, Status: Completed. Value: N60MillionThe Scope of the Project Includes:
Procurement of 1000units of Fully Electronic Domestic Prepaid Water Meters
Installation of Fully Electronic Domestic Prepaid Water Meters Including Testing and Commissioning
9
ON-GOING PROJECTS – OTTA-IKOSI
Construction of Otta-Ikosi 4MGD Regional Water Supply Scheme
and pipeline Reticulation. Client: Lagos StateFinancier: Lagos StateDate of Award: 17th Dec, 2008, Status: 70% completedValue: N4.37Billion
The Scope of the Project Includes:
Construction of River Intake, Construction of Head-Works & Ancillaries
- Pumps Ranging from 25Kw to 75KwConstruction 2 Booster Pumping Stations at Agbowa and
Imota,
10
ON-GOING PROJECTS – OTTA-IKOSI
Laying of 40km of DI Pipe for Transmission Mains - Pipes ranging from 80mm to 500mm of DI Pipe∅ ∅
Laying of over 40km of PVC Pipe for Reticulation in 13 communities - Pipes ranging from 63mm to 315mm of PVC Pipe, ∅ ∅
Laying of Service MainsSupply and Installation of Motor Control Panel (MCC) with Soft Starters Supply and installation of Telemetry SCADA Equipment and other worksSupply and Installation of 16Nos Galvanized Pressed Steel bolted Panel Tanks of different sizes - 8,400m3 Cumulative Capacity.
11
ON-GOING PROJECTS – OTTA-IKOSI
Construction of 4MGD Otta-Ikosi Regional Water supply Schemes
(Additional works- Extension To Ikorodu)
Client: Lagos StateFinancier: Lagos StateDate of Award: 18th April, 2011Status: ` In progress.Value: N2.3Billion
The Scope of the Project Includes:
Construction of booster Station at Isiu, Supply and Installation of 3Nos 750m3 Galvanized Pressed Steel
bolted Panel Tanks on 18m Tower at Isiu and Ikorodu.Supply and installation of 15km of DI pipes ( 400mm & 500mm) ∅ ∅
including fittings and accessories.
Newly Awarded
12
ON-GOING PROJECTS - ISHASI
The Scope of the Project Include:
Refurbishment of Raw water intake station & Floating pontoonSupply and installation of Raw water Submersible PumpsOverhauling/Refurbishment of Pumping Station Equipment: Clear water pumps, Compressors, blowers, dosing equipment, MCC Panels etcRefurbishment of Filtration Systems Including Installation of New Instrument and Control SystemsRefurbishment and Improvement to Control Room and PLC
(Programmable Logic ControllersReplacement of chemical dosing pumps, Mixers and dosing pipelinesImprovement to office, security lightings and small power distribution
Rehabilitation of 4MGD Ishasi Waterworks
Client: Lagos StateFinancier: World BankDate of Award: 24th Jun, 2011.Status: ` In progress.Value: N745.9Million
Newly Awarded
13
ON-GOING PROJECTS - AIRPORT LAGOS
Construction of Water supply schemes at Murtala Muhammed
International Airport, Ikeja. Client: FAANFinancier: Fed. Govt. of Nig.Date of Award: 14th Oct. 2008. Status: 80% CompletedValue: N290MillionThe Scope of the Project Include:
Upgrading of the plant from 200m3/day to 400m3/day,Construction of 3nos 250mm Borehole,∅Installation of Pump galleries (between 15Hp to 30Hp Pumps),Supply and Installation of Diesel/Electric Fire Hydrant Pump setSupply and Installation of Motor Control Panel (MCC) with Soft Starters,Supply and Installation of Standard Laboratory Equipments, Etc….
14
NASTON COMPLETED PROJECTS
Construction of 4Nos 2Million Gallon Per Day Mini Waterworks
at:
1.Magodo, 2. Epe-Agric, 3. Ajangbadi and 4. Isheri-Oshun in Lagos State.
Client: Lagos State Financier: Lagos StateDate of Award: 21st Apr, 2008 Status: CompletedValue: N 1.9BillionCompletion Period: 6 Months
15
Construction of 4Nos 2Million Gallon Per Day Mini Waterworks-Details
Scope of Works of Each of the 4 Sites:
Drilling of 4Nos Deep Boreholes, Booster Pumping System Installed, Aeration/Sedimentation Tank Fabricated and Installed, Filtration System- 4 pressure filters of ∅3m and 3m height, Clear Water Tank (1,000m3) Fabricated and Installed, Elevated Tank (225m3) Fabricated and Installed, Power Generation System, Operations Building,5km of Distribution Pipeline of different sizes (∅110mm to ∅315mm).
Installation of MCC Control PanelEtc.
16
NASTON COMPLETED PROJECTS
Upgrade of Water Treatment Plant at United State of America Consulate,
Lagos Nigeria.Client: US Consulate Financier: United State of AmericaDate of Award: 21st Aug. 2009Status: Completed Value: N38.5Million
The Scope of the Project Includes:
Upgrading of the plant from 12m3/hr to 18m3/hr, Supply and installation of 10hp Submersible pump, Construction of 18m3/hr Water Treatment Plant Comprising: Aeration & Sedimentation tank: 4.8mL X 2.5mW X 1.5mH Supply and Installation 3kw Filter pumps and 4kW Transfer pumps Supply and Installation Pressure Filters Supply and Installation 3kW Air blower Supply and Installation Dosing Equipment Supply and Installation of Motor Control Panel (MCC) with Soft Starters,
Picture not Available
17
NASTON COMPLETED PROJECTS
Overhauling/Upgrading of the FCT Water Board’s Pumping
Stations.Client: FCT, AbujaFinancier: Fed. Govt. of Nig.Date of Award: 8th Sept, 2008. Status: CompletedValue: N428.9Million
The Scope of the Project Include:
Pump and Power Upgrade of 11 Stations Rehabilitation and Complete overhauling of the Electromechanical
Equipments of the Booster Pumping Station, Supply and Installation of Pumps Ranging from 11Kw to 30Kw, Supply and Installation of Electricity Generating Set, Installation of Bulk Flow Meter
18
NASTON COMPLETED PROJECTS
Rehabilitation of Lower Usuma Dam Water Treatment Plant
(Phase 1)Client: FCT, AbujaFinancier: Fed. Govt. of NigDate of Award: 8th Sept, 2008, Status: Completed. Value: N245. 8Million
The Scope of the Project Includes:
Replacement of the Emergency De-silting Gate of the Dam at a Depth of 60m, Rehabilitation of the Phase 1 LUD Water Treatment Plant, Rehabilitation of The Intake Tower, Supply and Installation of Electromechanical Equipments (Electric Flow Meters,
Compressor, etc. Supply and Installation of Chlorinator (Pre and Post Chlorinator ; up to 20Kg/h), And many more..
19
NASTON COMPLETED PROJECTS
Construction Works for the Extension and Rehabilitation of
Karu/Nyanya Water Distribution Network.
Client: FCT, AbujaFinancier: World BankDate of Award: 7th Oct. 2008. Status: Completed. Value: N599.9Million
The Scope of the Project Include:
Laying of over 40Km of PVC and Ductile Iron for Transmission and Distribution Pipeline Network
20
NASTON COMPLETED PROJECTS
Emergency Rehabilitation of Nsukka
Water Supply SystemClient: Enugu StateFinancier: World BankDate of Award: 10th Oct. 2007 Status: CompletedValue: N182Million
The Scope of the Project Include:
Drilling of 350mm Borehole,∅ Rehabilitation of 4Nos Existing Borehole, Supply and Installation of Clear Water Pumps Rehabilitation of Treatment Plant and Installation of Dosing Equipments, Rehabilitation of Operational Building and Treatment Plant Building, Laying of 22Km of Distribution Pipeline Network..
21
NASTON COMPLETED PROJECTS
Supply of Vertical Driven Pumps for Ajalli-Owa Head
works.
Client: Enugu StateFinancier: World BankDate of Award: 10th Oct. 2007 Status: CompletedValue: N102.4Million
The Scope of the Project Includes:
Procurement of 4Nos Vertical Line Driven Pumps for Raw Water (580m3/hr @178mH)
Procurement of 4Nos Vertical Line Driven Pumps for Clear Water (1070m3/hr @150mH)
22
NASTON COMPLETED PROJECTS
Replacement of the Electrical Panels for the New Ajalli-Owa
Intake and High lift pumps
Client: Enugu StateFinancier: World BankDate of Award: 3rd July, 2009 Status: CompletedValue: N101.3Million
The Scope of the Project Includes:
Supply and Installation of Motor Control Panel (MCC) with Soft Starters for Intake Station,
Supply and Installation of Motor Control Panel (MCC) with Soft Starters for High Lift Station
Supply of Spare Parts.
23
NASTON COMPLETED PROJECTS
Rehabilitation of Enugu Metropolis Water Distribution
Network. (Lot 1)
Client: Enugu StateFinancier: World BankDate of Award: 23rd Jan. 2009 Status: CompletedValue: N136.9Million
The Scope of the Project Includes:
Procurement of 300mm and 450mm Ductile Iron Pipes∅ ∅ Procurement of 100mm and 200mm UPVC Pipes∅ ∅ Laying of Pipes in a densely Built up Area Reclaimation of Right of Ways by Relocating Utilities such as Underground
Electrical Cables, Telecoms Cable, Transformer etc., Rehabilitation of Lower Ogui Road Pipe Reticulation of 4km Pipe Line, Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and
Chlorination of New Pipeline,
24
NASTON COMPLETED PROJECTS
Rehabilitation of Enugu Metropolis Water Distribution
Network. (Lot 2)
Client: Enugu StateFinancier: World BankDate of Award: 23rd Jan. 2009 Status: CompletedValue: N139.3Million
The Scope of the Project Includes:
Procurement of 300mm and 450mm Ductile Iron Pipes∅ ∅ Procurement of 100mm and 200mm UPVC Pipes∅ ∅ Laying of Pipes in a densely Built up Area Reclamation of Right of Ways by Relocating Utilities such as
Underground Electrical Cables, Telecoms Cable, Transformer etc., Reconnection of New Pipe Network With Supply Mains, Testing,
Flushing and Chlorination of New Pipeline,
25
NASTON COMPLETED PROJECTS
Ikoyi Hotel Redevelopment - Borehole/Water Treatment and
Sewage Treatment Plant Installation
Client: Ikoyi Hotel Ltd.Financier: Beta ConsurtiumDate of Award: 24th Jul. 2007Status: CompletedValue: N44.9 MillionThe Scope of the Project Includes:
Drilling of 200mm Borehole,∅ Design, Construction and Installation of 20m3 Water
Treatment Plant, Design, Construction and Installation of Sewage
Treatment Plant.
26
OTHER ON-GOING PROJECTS - OSE-OWO
Rehabilitation and Upgrade of Ose-Owo Water Supply Scheme. Client: Ondo StateFinancier: Ondo State Date of Award: 14th Oct. 2010Status: In progress Value: N1.4Billion
The Scope of the Project Includes:
De-silting (Dredging) of the fully silted Ose dam reservoir.
Improvement of the treatment and production capacity of the Treatment plant
Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).
27
OTHER ON-GOING PROJECTS - OSE-OWO
Rehabilitation and Upgrade of Ose-Owo Water Supply Scheme.
(continue )
The Scope of the Project Includes:
De-silting (Dredging) of the fully silted Ose dam reservoir.
Improvement of the treatment and production capacity of the Treatment plant
Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).
28
OTHER ON-GOING PROJECTS
Rehabilitation and Upgrade of Awara Water Supply Scheme. Client: Ondo StateFinancier: Ondo State Date of Award: 14th Oct. 2010Status: In progressValue: N988.7Million
The Scope of the Project Includes:
Upgrade of the treatment and production capacity of the plant
Salvaging of abandoned pressure filtration accessories and Completion of the
abandoned pressure filtration system.
Upgrade of The Water Supply to The Catchment Area via – Installation New
Transmission And Distribution (HDPE) Pipelines
29
OTHER ON-GOING PROJECTS
Construction of 50M3/hr Augmentation Water Treatment
Plant at Ido-Ani. Client: Ondo StateFinancier: Ondo StateDate of Award: 3rd Dec, 2010Status: In progress Value: N117.5 Million
The Scope of the Project Includes:
Expansion of the Water Treatment Capacity of the Plant from 50m3/hr to 150m3/hr.
Refurbishment of the intake and treatment plant buildings. Construction of new ground tank . Completion of the abandoned clarifier. Supply and installation of new 100m3/hr high lift pumps for Ido-Ani.
30
OTHER ON-GOING PROJECTS
Construction of Re-designed Intake/ Rehabilitation of
Existing intake structure at Oke-Igbo Water Scheme.
Client: Ondo StateFinancier: Ondo StateDate of Award: 24th Dec. 2010Status: In progressValue: N42 Million
The Scope of the Project Include:
Construction intake weir across Oni river to impound raw water.
Refurbishment of the intake building. Replacement of the Raw water
Intake pipe works . Installation of New intake pumps .
31
OTHER ON-GOING PROJECTS
Rehabilitation of Ife-Odan Water supply scheme.
(EU Financed)Client: Osun StateFinancier: European UnionDate of Award: 9th Mar. 2011.Status: In progress Value: N48 Million
Rehabilitation of Lower Usuma Dam Embarkment. (Landscaping)
Client: FCT, AbujaFinancier: Fed. Govt. of NigDate of Award: 30th Nov. 2010Status: 60% CompletedValue: N19.9Million
32
LIST OF OTHER COMPLETED PROJECTS
S/N PROJECTS LOCATION CLIENT FINANCIER STATUS VALUE
1 Rehabilitation and Expansion of Onikan Water Works (WORLD BANK PROJECT)
Onikan, Lagos Lagos State Govt. World Bank Completed N 79.6M
2 Rehabilitation of V.I Annex, Eredo, Ota-Ikosi and Agege Micro Waterworks
Lagos Lagos State Govt. Lagos State Govt. Completed N 506.7M
3 Construction of 1.25MGD Water Treatment Plant, Supply and Installation of Fire Pump Set and Provision of External Water Distribution System at 1004 Estates Redevelopment , Victoria Island, Lagos
Victoria Island, Lagos
UACN Property Development Company plc.
UACN Property Development Company plc.
Completed N 90.5M
4 Water Supply Project at Ojo and Epe Campuses, Lagos State University
Lagos Lagos State Govt. Lagos State Govt. Completed N 525.3M
5 Design, Fabrication and Installation of 75m3/hr Water Supply System and Pipeline. Management of the water energy services at Palm Springs Residences & Resorts, Lekki, Lagos
Lagos Artee Group Nig. Ltd.
Artee Group Nig. Ltd.
Completed N 111.0M
6 Ijora Badiya Micro Waterworks Lagos Lagos State Govt. Lagos State Govt. Completed N169.0M
7 Federal Rural Water Supply, Ikorodu, Lagos Lagos Federal Ministry of Water Resources
Federal Ministry of Water Resources
Completed N13.6M
8 Design, Supply & Installation of 50m3 Water Treatment Plant at Nicon Town, Lagos
Lagos Chevron Employees Coop Thrift & Credit
Society Ltd
Chevron Employees Coop Thrift & Credit
Society Ltd
Completed N54.5M
9 Drilling of 6” Borehole, Installation of 3m3/hr Water Treatment Plant, Provision of High Lift Pumps, Welding & Fabrication of Steel Water Storage Tank at Banana Island, Private Development, Ikoyi, Lagos
Lagos Business Contracting Limited
Business Contracting Limited
Completed N9.85M
33
LIST OF OTHER COMPLETED PROJECTS
S/N PROJECTS LOCATION CLIENT FINANCIER STATUS VALUE
10 Laying of Water Pipeline Reticulation for Oworonsoki, Otto-Awori and Ijora Badia
Lagos Lagos State Govt. Lagos State Govt. Completed N 288.2M
11 Iwaya Micro Water Works – 1 Million Gallon Per Day
Lagos Lagos State Govt. Lagos State Govt. Completed N 162.0M
12 Otto-Awori Micro Water Works – 1 Million Gallons per Day
Lagos Lagos State Govt. Lagos State Govt. Completed N 229.0M
13 Oworonshoki Micro Water Works – 1 Million Gallons Per Day
Lagos Lagos State Govt. Lagos State Govt. Completed N 229.0M
14 Ijora Badia Micro Water Works – 1 Million Gallons Per Day
Lagos Lagos State Govt. Lagos State Govt. Completed N 229.0M
15 Onikan Micro Water Works – 1 Million Gallons per Day
Lagos Lagos State Govt. Lagos State Govt. Completed N 229.0M
16 Rehabilitation of Owena Water Treatment Plant
Owena Ondo State Govt. Ondo State Govt. Completed N 15.0M
17 Drilling of 2 Boreholes, Reticulation, Rehabilitation of Gent Sets and Storage Tanks at University of Abuja.
Abuja University of Abuja University of Abuja Completed N 7.5M
18 And many more projects Across Nigeria
Private, Companies, Governments and
International Bodies
Private, Companies, Governments and
International Bodies
CompletedAnd
On-Going
34
PROPOSAL STATEMENT
We have presented our capability and experience in executing projects of various sizes and complexity in the water industry and we are
roaring to do more…
35
OUR CONTACT DETAILS
LAGOS OFFICE ADDRESS
WATER HOUSE, IPONRI
1, AFRIC ROAD,
OFF FUNSHO WILLIAMS AVENUE,
IPONRI LAGOS
ABUJA OFFICE ADDRESS3, GOBA STREET, OFF MONROVIA
STREETAMINU KANO CRESENT,
WUSE II, ABUJA.
TELEPHONE: +234 1 841 6002, +234 803 303 4927
E-MAIL: [email protected];
AKURE OFFICE ADDRESS22, IKALE STREET,
IJAPO ESTATEAKURE,
ONDO STATE.