US 26–BORING ROAD BRIDGE RAISING PROJECT
26
212
212
26Stone Rd.
Closure area:SE 282nd Avenue/Boring Road overpass
Compton Rd.
Orient Dr.
Orient Dr.
NORTHBOUNDDETOUR
SOUTHBOUND
DETOUR
Gresham
Boring
NEWSLETTER #1SUMMER 2016
The SE 282nd Avenue/Boring Road overpass will be raised, repaired, and resurfaced in 2018ODOT is working to improve the Boring Road overpass at US 26 by raising it to accommodate over-height vehicles. Additional clearance will allow large vehicles to stay on US 26 instead of being detoured onto Orient Drive and Kelso Road.
Project detailsThe project includes these key elements:
• Raise SE 282nd Avenue/Boring Road overpass at US 26 by more than two feet
• Repair and resurface the roadway on the overpass • Build new storm water ponds
Construction impacts and detours The project will require an extended full closure of SE 282nd Avenue/Boring Road where it crosses US 26. Detours will be in place while the overpass is closed (see detour map). US 26 will remain open during construction.
ODOT is talking to area stakeholders to determine when the closure will be least impactful. We want to hear from you. We are hosting an online open house where you can get more information on the timing of the closure and provide your feedback.
Detours during overpass closure
We want to hear from you!Visit the online open house at
www.BoringRdBridge.org through September 15, 2016
to learn more and provide feedback.
Anticipated project schedule Design Now – December 2017Construction Spring/Summer 2018 – Fall 2018
While the SE 282nd Avenue/Boring Road overpass is closed, northbound travelers will take OR 212/Compton Road to US 26 westbound to Stone Road. Southbound travelers will take Orient Drive to Compton Road and back to SE 282nd Avenue/Boring Road.
Oregon Department of Transportation Region 1 Headquarters 123 NW Flanders St.Portland, OR 97209
For ADA Title II or Civil Rights Title VI accommodations, translation/interpretation services or for additional information call (503) 731-4128, TTY (800) 735-2900 or use the statewide Oregon Relay Service: 7-1-1.¿Habla usted español? Podemos proporcionar la información en esta publicación en español. Para recibir la información en español, por favor llame al (503) 731-4128.Вы говорите по-русски? Мы можем предоставить информацию в этой публикации на русском языке. Для получения информации звоните по тел (503) 731-4128 или посетите веб-сайт.
Online open house is now live!
US 26–BORING RD.BRIDGE RAISING
PROJECT
www.BoringRdBridge.org
Visit our online open house!www.BoringRdBridge.org
Contact Kimberly Dinwiddie(503)731-8281 [email protected]
The SE 282nd Avenue/Boring Road project will raise and repair the overpass at US 26. This work will require an extended closure of SE 282nd Avenue/Boring Road in 2018. The closure is necessary to raise the overpass more than two feet to allow for over-height vehicles to stay on US 26. Learn more about the project and provide your feedback on the closure. Visit the online open house at www.BoringRdBridge.org between now and September 15, 2016.
Overpass improvements• Raise deck
height 2+ feet• Repair and
resurface
New stormwater ponds
New stormwater ponds
Gresham
Boring
SE 2
82nd
Ave
./Bor
ing
Rd.
US 26
US 26
Kelly Hawley(503)[email protected]
Top Related