Download - Unconventional Oil and Gas - C-FER Technologies · Industry Challenges • Fraccing Operation Risks • Artificial Lift/Deliquification Performance • Well Design & Casing Integrity

Transcript
Page 1: Unconventional Oil and Gas - C-FER Technologies · Industry Challenges • Fraccing Operation Risks • Artificial Lift/Deliquification Performance • Well Design & Casing Integrity

Industry Challenges

• FraccingOperationRisks• ArtificialLift/DeliquificationPerformance• WellDesign&CasingIntegrity• CompletionSystemOptimization• CementIntegrity Highlight: Fraccing Operation Risks

Erosiondamagetowellheadcomponentsanddownholeassembliescanoccurinhighfluidrateenvironmentscontaininghardandabrasivesolids,suchasthoseinhighrate,multi-stagefracturingoperationsandflow-back.Theseconditionscouldresultinasignificantwelllossorblowouthazard.Assessingandmitigatingerosionbecomescriticalinthesecases,impactingsafety,theenvironmentandcost.Predictionofthelocationandthedegreeofpotentialdamageandmateriallossisrequiredtoaidinthedesignandoptimizationofcompletion/fraccingsystemsandprocesses.

C-FER’sCapabilities• ModellingerosionandmateriallosswithComputationalFluidDynamics(CFD)• Simulationofflowanderosioninwellhead,pipinganddownholecomponents• Structuralanalysisofsurfaceanddownholeequipment• Riskassessmentoffracturingandoperatinglifeofwells

Highlight: Artificial Lift/Deliquification PerformanceC-FER’sExperience:• ManagementofJointIndustryProject(JIP)ondownholegas/liquidseparation• Laboratorytestingofthevariousdeliquificationsystems• Assistanceindevelopmentofdeliquificationsystemprototype• Developmentofdeliquificationmethodselectiontool• Evaluationofdevelopmentstrategiesforextendedreachgaswells,includingseveraldifferentwellgeometriesand

artificialliftsystemoptions

Unconventional Oil and Gas

C-FERTechnologies

www.cfertech.com

PrintedinCanada2014

Darren Worth [E] Sr. Research EngineerProduction Operations

[email protected][T] 780.450.8989 x 237[F] 780.450.3700

CFD Analysis of Well Equipment Erosion during Fraccing Operations