Exit 17
Exit 18
Stark St. Bridge
Troutdale Bridge(bridge closed)
After
signing and striping changes
N Detour routes
Key
Stop signYield
Rendering of new walkway and metal pedestrian guardrail.
ScheduleConstruction is scheduled to begin in February 2020 and be complete before Memorial Day (May 25) and the height of summer recreation. Schedule is subject to change and work is weather dependent.
Construction impacts• For up to eight weeks during construction, the
bridge will be closed to all motor vehicles. Signed detours will direct travelers around the closure.
• Travelers can also expect flaggers to direct traffic at other times during construction.
• People walking, biking or rolling can continue using the bridge during construction, but should follow the signed and accessible detour route onto the bridge and use caution when traveling
through the work zone. • Most of the work will take place during the day,
but some work may take place at night and those working or living in the area may hear the noise. A 24/7 noise hotline is available for noise questions or complaints at: 503-276-7803.
• No closures of business or recreational access due to this work.
Troutdale Bridge over the Sandy River Walkway RepairODOT is replacing the aging walkway on the Troutdale Bridge over the Sandy River in 2020.
tinyurl.com/TroutdaleBridgeWalkway
For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1.
¿Habla usted español? Podemos proporcionar la información de esta publicación en español, por favor llame al 503-731-4128.
About the projectODOT is replacing the aging walkway on the Troutdale Bridge over the Sandy River in early 2020. We will replace the wooden walkway with synthetic lumber, which has a longer lifespan, reduced maintenance needs and similar appearance to wood. We will also widen it to better serve users, including those with disabilities. Other project elements include:• Repairs to small sections of the steel bridge. • Replacing the aging wooden guardrail with metal
guardrail designed to resemble the original.• Replacing the lighting on the bridge to increase
visibility and safety.• Making minor traffic control changes at the
intersection on the northeast end of the bridge. tinyurl.com/TroutdaleBridgeWalkway
123 NW FlandersPortland, OR 97209
Construction begins soon on the Troutdale Bridge over the Sandy River.
Expect bridge closures.
Troutdale Bridge over the Sandy River Walkway Repair
Stay in the knowVisit the project websitetinyurl.com/TroutdaleBridgeWalkway
Sign up for project emailsOnline or by contacting ODOT.
Check TripCheck.comFor up-to-date traffic impacts during construction.
Contact ODOTKatelyn Jackson, ODOT Community Affairs [email protected]
24/7 nighttime noise hotline: 503-276-7803.
Top Related