Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Berrigan Shire Council
Transport
ADVANCED INFRASTRUCTURE
RISK MANAGEMENT PLAN
Version 2
Adopted 16th July, 2014
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Document Control Advanced Infrastructure Risk Management Plan
Document ID: 59.299.120818 nams.plus2 advanced irmp template v3
Rev No Date Revision Details Author Reviewer Approver
1 May 2011 Urban Stormwater Drainage (Kerb and Gutter Part) JS TD Council
1 May 2011 Footpaths JS TD Council 1 Nov 2008 Roads, Streets and Bridges FE PM Council
2 Jan 2014 Transport JS FE Council
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
TABLE OF CONTENTS
1. INTRODUCTION .............................................................................................................................................. 1 1.1 Aim ........................................................................................................................................................ 1 1.2 Objectives .............................................................................................................................................. 1 1.3 Advanced Infrastructure Risk Management ......................................................................................... 1 1.4 Scope ..................................................................................................................................................... 3 1.5 Risk Management Process .................................................................................................................... 3
2. COMMUNICATION AND CONSULTATION ....................................................................................................... 4 3. ESTABLISHING THE CONTEXT.......................................................................................................................... 4
3.1 Establishing the external context .......................................................................................................... 4 3.2 Establishing the internal context........................................................................................................... 5 3.3 Establishing the context of the risk management process ................................................................... 5 3.4 Develop risk criteria .............................................................................................................................. 6
4. RISK IDENTIFICATION ...................................................................................................................................... 7 4.1 General .................................................................................................................................................. 7
5. RISK ANALYSIS ............................................................................................................................................... 12 5.1 General ................................................................................................................................................ 12 5.2 Likelihood ............................................................................................................................................ 12 5.3 Consequences ..................................................................................................................................... 12 5.4 Risk Analysis ........................................................................................................................................ 13 5.5 Timing of Risk Treatment .................................................................................................................... 13 5.6 Analysis of Risk .................................................................................................................................... 14
6. RISK EVALUATION ......................................................................................................................................... 14 6.1 General ................................................................................................................................................ 14 6.2 Risk Evaluation .................................................................................................................................... 14
7. RISK TREATMENT PLANS ............................................................................................................................... 23 7.1 General ................................................................................................................................................ 23 7.2 Manage the Risks ................................................................................................................................ 23 7.3 Risk Treatment Process ....................................................................................................................... 24 7.4 Risk Treatments Options ..................................................................................................................... 24 7.5 Risk Treatment Plans ........................................................................................................................... 24
8. MONITORING AND REVIEW .......................................................................................................................... 40 9. REFERENCES .................................................................................................................................................. 40
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
This page is left intentionally blank
- 1 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
1. INTRODUCTION
1.1 Aim
The purpose of this core infrastructure risk management plan is document the results and recommendations resulting from periodic identification, assessment and treatment of risks associated with providing services to the community from infrastructure, using the fundamentals of International Standard ISO 31000:2009 Risk management – Principles and guidelines.
Risk Management is defined in ISO 31000:2009 as: “coordinated activities to direct and control an organisation with regard to risk”.
1
1.2 Objectives
The objectives of the plan are:
to identify risks to the Berrigan Shire Council that may impact of the delivery of services from infrastructure,
to select credible risks for detailed analysis,
to analyse and evaluate risks in accordance with ISO 31000:2009,
to prioritise risks,
to identify risks requiring treatment by management action,
to develop risk treatment plans identifying the tasks required to manage the risks, the officer/authority responsible for each task, the resources required and the due completion date.
1.3 Advanced Infrastructure Risk Management
This advanced infrastructure risk management plan has been designed to be read as a supporting document to a NAMS.PLUS2 Asset Management Plan. It is based on the fundamentals of International Standard ISO 31000:2009 Risk Management – Principles and guidelines.
Organisations aiming at being an effective manager of risk should comply with the following principles.
Risk management creates and protects value – by contributing to the demonstrable achievement of objectives and improvement of performance in, for example, human health and safety, security, legal and regulatory compliance, public acceptance, environmental protection, product/service quality, project management, effectiveness in operations, governance and reputation.
Risk management is an integral part of all organisational processes – not a stand-alone activity that is separate from the main activities and processes of the organisation. Risk management is part of the responsibilities of management and integral to all organisational processes, including strategic planning and all project and change management processes.
Risk management is part of decision making – by helping decision makers make informed choices, prioritise actions and distinguish between alternate courses of action.
Risk management explicitly address uncertainty, the nature of that uncertainty and how it can be addressed.
Risk management is systematic, structured and timely – which contributes to efficiency and consistent, comparable and reliable results.
Risk management is based on the best available information – however, decision makers should inform themselves of, and should take into account, any limitations of the data or modelling used or the possibility of divergence among experts.
Risk management is tailored – and aligned with the organisation’s external and internal control and risk factors.
1 ISO 31000:2009, p 2.
- 2 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Risk management takes human and cultural factors into account – by recognising the capabilities, perceptions and intentions of external and internal people that can facilitate or hinder achievement of the organisation’s objectives.
Risk management is transparent and inclusive – through appropriate and timely involvement of stakeholders and, in particular, decision makers at all levels of the organisation, so that risk management remains relevant and up-to-date. Involvement also allows stakeholder to be properly represented and to have their views taken into account in determining risk criteria.
Risk management is dynamic, iterative and responsive to change – by continually sensing and responding to change. As external and internal events occur, context and knowledge change, monitoring and review of risks take place, new risks emerge, some change and some disappear.
Risk management facilitates continual improvement of the organisation – from development and implementation of strategies to improve their risk management maturity alongside all other aspects of the organisation.
2
The success of risk management depends on the effectiveness of the management framework providing the foundations and arrangements that will embed it throughout the organisation at all levels. The framework ensures that information about risk derived from the risk management process is adequately reported and used as a basis for decision making and accountability at all relevant organisation levels.
3 The dependency of
the management framework components in managing risk is shown in Figure 1.3.
Mandate and commitment
Design of framework for managing riskUnderstanding the organisation and its contextEstablishing risk management policyAccountabilityIntegration into organisation processesResourcesEstablishing internal communication and reporting mechanismsEstablishing external communication and reporting mechanisms
Continual improvement of the framework Implementing risk managementImplementing the framework for managing riskImplementing the risk management process
Monitoring and review of the framework
Fig 1.3: Relationship between the components of framework for managing risk Source: Based on ISO 31000; 2009, Fig 2, p 9
2 ISO 3100:2009, Sec 3, pp 7-8.
3 ISO 3100: 2009, Sec 4.1, p 8.
- 3 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
1.4 Scope
This plan considers risks to services delivery from transport infrastructure.
1.5 Risk Management Process
The risk management process used in this project is shown in Figure 1.5 below.
It is an analysis and problem solving technique designed to provide a logical process for the selection of treatment plans and management actions to protect the community against unacceptable risks.
The process is based on the fundamentals of International Standard ISO 31000:2009.
RISK ASSESSMENT
ESTABLISHING THE CONTEXT
- The external context- The internal context- Define risk criteria
RISK ANAYLSIS
Identify existing controls
Determine DetermineConsequences Likelihood
Determine level of risk
RISK EVALUATION
- Compare against risk criteria- Set priorities
Is risk acceptable?
Is risk acceptable?
RISK TREATMENT
- Identify options (cost & residual risk)- Assess options (risk reduction & cost)- Prepare and implement treatment plans- Communicate residual risks
CO
MM
UN
ICA
TIO
N &
CO
NSU
LTA
TIO
N
MO
NIT
OR
ING
& R
EVIE
W
RISK IDENTIFICATION
- What can happen?- When and why?- How and why?
Yes
No
Fig 1.5: Risk Management Process – Detail
Source: Based on ISO 31000; 2009, Fig 3, p 14
- 4 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
2. COMMUNICATION AND CONSULTATION
Risk communication and consultation is “continual and iterative processes that an organisation conducts to provide, share or obtain information and to engage in dialogue with stakeholders regarding the management of risk”.
4
Appropriate communication and consultation seeks to:
Improve people’s understanding of risks and the risk management processes,
Ensure that the varied views of stakeholders are considered, and
Ensure that all participants are aware of their roles and responsibilities. 5
The development of this infrastructure risk management plan was undertaken using a consultative team approach to:
Identify stakeholders and specialist advisors who need to be involved in the risk management process,
Discuss and take into account the views of stakeholder and specialist advisors, and
Communicate the results of the risk management process to ensure that all stakeholders are aware of and understand their and roles and responsibilities in risk treatment plans.
Members of the team responsible for preparation of this risk management plan are:
Director Technical Services,
Executive Engineer,
Roads Overseer,
Maintenance Overseer,
Enterprise Risk Manager
3. ESTABLISHING THE CONTEXT
In establishing the context, “the organisation articulates its objectives, defines the external and internal parameters to be taken into account when managing risk, and sets the scope and risk criteria for the remaining progress”.
6
The context is established in three stages, external, internal and risk criteria.
3.1 Establishing the external context
The external context is the external environment in which the organisation seeks to achieve its objectives. Understanding the external context is important to ensure that the objectives and concerns of external stakeholders are considered when developing risk criteria. This external context can include but is not limited to:
The social and cultural, political, legal, regulatory, financial, technological, economic, natural and competitive environment in which the organisation operates,
Key drivers and trends impacting on the objectives of the organisation, and
Relationships with, perceptions and values of external stakeholders.7
4 ISO 31000:2009, Sec 2.12, p 3.
5 HB 436:2004, Sec 3.1, p 20.
6 ISO 31000:2009, Sec 5.3.1, p 15.
7 ISO 31000:2009, Sec 5.5.2, p 15.
- 5 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
This is to determine the crucial elements which might support or impair its ability to manage the risks associated with its operation.
Key items of the external environment within which Berrigan Shire Council operates are:
Extreme Wet,
Reduction of Funding Sources,
Traffic Volume Increases, .
3.2 Establishing the internal context
The internal context is the internal environment in which the organisation seeks to achieve its objectives. It includes anything within the organisation that can influence the way in which an organisation will manage risks. It should be established because:
risk management takes place in the context of the organisation’s objectives,
objectives and criteria of a particular project, process and activity should be considered in the light of objectives of the organisation as a whole, and
some organisations fail to recognise opportunities to achieve their strategic, project or business objectives, and this affects ongoing organisational commitments, credibility trust and value.
8
The purpose of this stage is to align the risk management process with the organisation’s culture, processes, structure and strategy. It is essential that the organisation understands its internal context which can include, but is not limited to:
governance, organisational structure, roles and accountabilities,
policies, objectives, and the strategies that are in place to achieve them,
capabilities, understood in terms of resources and knowledge (eg capital, time, people, processes, systems and technologies),
the relationships with and perceptions and values of internal stakeholders,
the organisation’s culture,
information systems, information flows and decisions making processes (both formal and informal),
standards, guidelines and models adopted by the organisation, and
form and extent of contractual relationships.9
Berrigan Shire Council operates many management practices and procedures to identify and manage risks associated with providing services from infrastructure assets. These include:
operating a reactive maintenance service for all assets and services,
operating a planned maintenance system for key assets,
monitoring condition and remaining service life of assets nearing the end of their service life,
renewing and upgrading assets to maintain service delivery,
closing and disposing of assets not providing the required service level, and
acquiring or constructing new assets to provide new and improved services. 3.3 Establishing the context of the risk management process
This stage of context development is the risk management context. It includes setting the objectives, strategies, scope and parameters of the services to which the risk management process is being applied. The process should be undertaken with the need to balance costs, benefits and opportunities. The resources required and records to be kept should also be required.
8 ISO 3100:2009, Sec 5.3.3, pp 15.
9 ISO 3100:2009, Sec 5.3.3, pp 15-16.
- 6 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
The context of the risk management process will vary according to the needs of an organisation. It can involve, but is not limited to:
defining the goals and objectives of the risk management activities,
defining responsibilities for and within the risk management process,
defining the scope, as well as the depth and breadth of the risk management activities to be carried out, including specific inclusions and exclusions,
defining the activity, process, function, project, product, service or asset in terms of time and location,
defining the relationships between a particular project, process or activity and other projects, processes or activities of the organisation,
defining the risk assessment methodologies,
defining the way performance and effectiveness is evaluated in the management of risk,
identifying and specifying the decisions that have to be made, and
identifying, scoping or framing studies needed, their extent and objectives, and the resources required for such studies.
10
The organisation has assigned responsibilities for managing risks associated with assets and service delivery to the following areas.
Technical Services Department,
Enterprise Risk Manager, 3.4 Develop risk criteria
The purpose of this stage is to develop the criteria against which risk is to be evaluated. The criteria should reflect the organisation's values, objectives and resources and the interests of stakeholders. This may depend on operational, technical, financial, legal, social, humanitarian, or other criteria.
Some criteria can be imposed by, or derived from, legal and regulatory requirements and other requirements to which the organisation subscribes. Risk criteria should be consistent with the organisation's risk management policy, be defined at the beginning of any risk management process and be continually reviewed.
When defining risk criteria, factors to be considered should include the following:
the nature and types of causes and consequences that can occur and how they will be measured,
how likelihood will be defined,
the timeframe(s) of the likelihood and/or consequence(s),
how the level of risk is to be determined,
the views of stakeholders,
the level at which risk becomes acceptable or tolerable, and
whether combinations of multiple risks should be taken into account and, if so, how and which
combinations should be considered.11
The risk evaluation criteria used in this risk management plan are shown in Table 3.4. This criteria is used to identify risk that are not acceptable to the organisation.
Table 3.4: Risk Evaluation Criteria
Criterion Risk Evaluation (Not Acceptable) Criteria
Operational Risks that have the potential to reduce services for a period of time unacceptable to the community and/or adversely affect the organisation’s public image.
10
ISO 31000:2009, Sec 5.3.4, p 16.
11 ISO 31000:2009, Sec 5.3.5, p 17.
- 7 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Criterion Risk Evaluation (Not Acceptable) Criteria
Technical Risks that cannot be treated by the organisation’s existing and/or readily available technical resources.
Financial Risks that cannot be treated within the organisation’s normal maintenance budgets or by reallocation of an annual capital works program.
Legal Risks that have the potential to generate unacceptable exposure to litigation.
Social Risks that have the potential to: - cause personal injury or death and/or - cause significant social/political disruption in the community.
Environmental Risks that have the potential to cause environmental harm.
The evaluation criteria are to provide guidance to evaluate whether the risks are acceptable to the organisation and its stakeholders in providing services to the community. Risks that meet the evaluation criteria above are deemed to be unacceptable and risk management plans are required to be developed and documented in this Infrastructure Risk Management Plan.
4. RISK IDENTIFICATION
4.1 General
Risk identification seeks to identify the risks to be managed. A well-structured systematic process is crucial, because a potential risk not identified at this stage is excluded from further analysis. All risks should be identified, whether or not they are under the control of the organisation.
The risks are identified in three stages:
What can happen? The aim is to generate a comprehensive list of events which might affect each element of the organisation’s service delivery.
How and why it can happen? It is necessary to consider possible causes and scenarios. There are many ways and event can be initiated. It is important that no significant causes are omitted.
Are risks credible? An assessment of credibility of all risk is undertaken to ensure that credible risks receive proper and due consideration.
The assets at risk, what can happen, when, possible cause(s), existing controls and assessment of credibility of the risk by the risk management team are shown in Table 4.1.
Credible risks are subjected to risk analysis in Section 5.
- 8 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Table 4.1: Risk Identification
RISK IDENTIFICATION
Risk No.
Asset providing the Service
What can happen? When can it occur?
Possible cause Existing controls Is risk credible?
1 Urban Road Pavements Pavement failure due to poor drainage Anytime now Tree roots blocking underground drains and/or lifting kerb and gutter
Regular inspections and maintenance
Yes
2 Rural Road Pavement Pavement failure due to poor drainage Anytime now Blocked Culverts and/or drains
Regular inspections and maintenance
Yes
3 Bitumen Surface Bitumen damaged by oil or other chemical
Anytime now Oil/chemical spill as a result of accident
Emergency Response/Clean up kits
Yes
4 Environment Oil or chemical spilled into roadside environment
Anytime now Oil/chemical spill as a result of accident
Emergency Response/Clean up kits
Yes
5 Road Structure /Roadside furniture/ signs/ traffic
Damage to roads and signs etc and blockage of traffic lanes from traffic accident
Anytime now Traffic Accident Emergency Response Yes
6 Road/Bridge/ Culvert Structure
Unstable surface due to failure of irrigation crossings
Anytime now Inadequate inspection, maintenance and repair program
Scheduled inspection of roads
Yes
7 Road/Bridge/ Culvert Structure
Rough surface due to failure of irrigation crossings
Anytime now Overloading RMS / Police Yes
8 Sealed Road Structure / Surface
Potholes/ Rutting/ Shoving/ Edge Break Anytime in the future
Extended wet conditions poor maintenance
Scheduled inspection of roads
Yes
9 Sealed Road Structure / Surface
Potholes/ Rutting/ Shoving/ Edge Break Anytime now Traffic Loadings exceed road standard
Scheduled inspection of roads and repairs
Yes
10 Gravel Road Structure / Surface
Potholes/Rutting/Shoving / Corrugations / Slippery Surface
Anytime in the future
Extended wet conditions, poor maintenance
Scheduled inspection of roads and repairs
Yes
11 Gravel Road Structure / Surface
Potholes/Rutting/Shoving / Corrugations / Slippery Surface
Anytime in the future
Traffic Loading exceeds road standard
Scheduled inspection of roads and repairs
Yes
- 9 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK IDENTIFICATION
Risk No.
Asset providing the Service
What can happen? When can it occur?
Possible cause Existing controls Is risk credible?
12 Lower River Road/Taylors Road/Bushlands Road
Road can be impassable and damaged due to flooding
Within 5 years Flooding of Murray River
Road closure followed by inspection and repair
Yes
13 All roads and streets protected by Tocumwal Levees
Roads can be impassable and damaged due to flooding
Beyond 20 years
Major Flooding of Murray River and overtopping of levee
Road closure followed by inspection and repair
Yes
14 All roads and streets Trees and debris blocking traffic lanes and damaging road furniture
Anytime in the future
Severe Storms Signage followed by inspection and repair
Yes
15 Rural Road Water over road due to flooding Within 1 year Severe Storms Signage followed by inspection and repair
Yes
16 Hughes St, Barooga at Collie St, Barooga
Water over road due to flooding Within 1 year Pump Station inadequate during Severe Storms
Signage followed by inspection and repair
Yes
17 Snell Rd, Barooga Water over road due to flooding Within 1 year Drainage system inadequate during Severe Storms
Signage followed by inspection and repair
Yes
18 Davis St, Berrigan at Momalong St, Berrigan
Water over road due to flooding Within 1 year Drainage system inadequate during Severe Storms
Signage followed by inspection and repair
Yes
19 Davis St, Berrigan South End
Water over road due to flooding Within 1 year Drainage system inadequate during Severe Storms
Signage followed by inspection and repair
Yes
20 Anthony Avenue, Tocumwal
Water over road due to flooding Within 1 year Drainage system inadequate during Severe Storms
Signage followed by inspection and repair
Yes
21 Lorelle Ct, Tocumwal Water over road due to flooding Within 1 year Drainage system inadequate during Severe Storms
Signage followed by inspection and repair
Yes
22 Rural Road Water over road due to flooding Within 1 year Drains or culverts bolcked
Regular inspections and maintenance
Yes
23 Urban Road Water over road due to flooding Within 1 year Drains or pits blocked Regular inspections and maintenance
Yes
- 10 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK IDENTIFICATION
Risk No.
Asset providing the Service
What can happen? When can it occur?
Possible cause Existing controls Is risk credible?
24 Urban Road Water over road due to flooding Within 1 year Drainage system inadequate in severe storms
Signage followed by inspection and repair
Yes
25 Rural Road Vehcichle collision with wildlife Anytime now Wildlife on road Signage Yes
26 Rural Road Vehicle collision with livestock Anytime now Livestock on roads Ranger patrols and policing
Yes
27 Rural Road Vehicle collision with livestock Anytime now Traveling Stock Signage n. Ranger patrols and policing
Yes
28 Rural Road Vehicle collision with livestock Anytime now Stock Crossings Signage Yes
29 Rural Road Damage to road surface Anytime in the future
Stock Crossings Signage and requirement for owners to repair road
Yes
30 Lower River Road concrete causeways
Vehicle acccident Anytime in the future
Inadequate risk and vertical alignment
signage Yes
31 Lower River Road Bridges Vehicle acccident Anytime in the future
Inadequate risk and guard rails
Signage Yes
32 Roadside furniture and signs
Damaged removed Anytime now Vandalism Regular inspections and maintenance
Yes
33 Lower River Road concrete causeways
Damaged by floodwaters Within 5 years Severe flood event Regular inspections and maintenance
Yes
34 Bridges Damaged by floodwaters Within 5 years Severe flood event Regular inspections and maintenance
Yes
35 Rural Road Traffic accident Anytime now too narrow for traffic conditions
New road construction to new wideer standard
Yes
36 Rural Road Traffic accident Anytime now Roadside obstacles too close too traffic lane
Roadside clearing and mainteance
Yes
37 Rural road intersection Traffic accident Anytime now no provision for right turn traffic
Signage Yes
38 Urban Road Water over road due to flooding Anytime now Pump failure Regular inspections and maintenance
Yes
39 Kerb and Gutter Flood Anytime now Movement in kerb Regular inspections and maintenance
Yes
- 11 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK IDENTIFICATION
Risk No.
Asset providing the Service
What can happen? When can it occur?
Possible cause Existing controls Is risk credible?
40 Kerb and Gutter Road collaspe Anytime now Movement in kerb Regular inspections and maintenance
Yes
41 Footpath Trip / Fall Anytime now Tree Roots, Holes, Lifting or Moving Concrete, Service Pits etc, Signage or Street Furniture
Regular inspections and maintenance
Yes
42 Footpath Hitting Head Anytime now Tree or street furniture
Regular inspections and maintenance
Yes
43 Swing Bridge Bridge collaspe Within 20 years
Age, structural fitigue,
Regular inspections and maintenance
Yes
44 Pedestrian Crossing Pedestrian colliding with vehicle Anytime now Limited visiblity, missing or damaged signs faded linemarking
Regular inspections and maintenance
Yes
45 Footpath Pedestrian colliding with mobility aide Anytime now Narrow path Regular inspections and maintenance
Yes
46 Footpath Water laying on footpath Anytime now Storm or flood Regular inspections and maintenance
Yes
47 Road Bridge Collaspe Within 20 years
Age, structural fitigue,
Regular inspections and maintenance
Yes
- 12 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
5. RISK ANALYSIS
5.1 General
Risk is analysed by combining estimates of likelihood and consequences in the context of existing control measures. The objective of a risk analysis is to separate the minor acceptable risks from the major risks and to provide data to assist in assessment and treatment of risk.
The level of risk is determined by considering two aspects against existing controls:
how likely it is that things may happen (likelihood, frequency of probability), and
the possible consequences (impact or magnitude of the effect) if they do occur. The risk analysis process is to:
identify the existing management controls, technical systems and procedures to control risk,
evaluate the likelihood of events occurring and their consequences in the context of these existing controls, and
combine the evaluation of likelihood and consequences to produce a level of risk. 5.2 Likelihood
Likelihood is a qualitative description of probability of an event occurring. The process of determining likelihood involves combining information about estimated or calculated probability, history or experience. Where possible it is based on past records, relevant experience, industry practice and experience, published literature or expert judgement. The qualitative likelihood descriptors are shown in Table 5.2.
Table 5.2: Likelihood Descriptors
Likelihood Descriptor Probability of occurrence
Rare May occur only in exceptional circumstances More than 20 years
Unlikely Could occur at some time Within 10-20 years
Possible Might occur at some time Within 3-5 years
Likely Will probably occur in most circumstances Within 2 years
Almost certain Expected to occur in most circumstances Within 1 year
5.3 Consequences
Consequences are a qualitative description of the effect of the event. The process of determining consequences involved combining information about estimated or calculated effects, history and experience. The qualitative likelihood descriptors are shown in Table 5.3.
The worst case consequence from the 5 consequence criteria in Table 5.3 is used for risk analysis.
- 13 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Table 5.3: Consequence Descriptors
Consequence Injury Service Interruption
Environment Finance Reputation
Insignificant Nil < 4 hrs Nil < $20k Nil
Minor First Aid Up to 1 day Minor short term
$20k - $100k Minor media
Moderate Medical treatment
1 day – 1 week Wide short term
$100k - $500k Moderate media
Major Disability 1 week – 1 month
Wide long term $500k - $1M High media
Catastrophic Fatality More than 1 month
Irreversible long term
> $1M Censure/ Inquiry
5.4 Risk Analysis
The risk assessment process compares the likelihood of a risk event occurring against the consequences of the event occurring. In the risk assessment matrix table below, a risk event with a likelihood of ‘Possible’ and a consequence of ‘Major’ has a level of risk of ‘High’. This level of risk is used to develop a typical risk treatment in Section 6.1.
Table 5.4: Risk Assessment Matrix
Risk Rating
Likelihood Consequences
Insignificant Minor Moderate Major Catastrophic
Rare L L M M H
Unlikely L L M M H
Possible L M H H H
Likely M M H H VH
Almost Certain M H H VH VH
Ref: HB 436:2004, Risk Management Guidelines, Table. 6.6 p 55.
5.5 Timing of Risk Treatment
The level of risk is used to determine risk treatments. Risk treatments can range from immediate corrective action (such as stop work, make safe or prevent use of the asset) for ‘Very High’ risks to manage by routine procedures for ‘Low’ risks.
Using the example from Section 5.4, an event with a ‘High Risk’ rating will require ‘Prioritised action’.
Table 5.4: Timing of Risk Management Required
Level of Risk Timing of Action Required
VH Very High Risk Immediate corrective action
H High Risk Prioritised action required
M Medium Risk Planned action required
L Low Risk Manage by routine procedures
- 14 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Immediate corrective action may include combinations of stopping work, making the area safe, preventing use of the asset and/or scheduling replacement as soon as possible. Prioritised action may include making the areas safe and implementing a short term work program to reduce the risk through improved maintenance or replacement of the asset. Planned action may include shifting the asset from a reactive maintenance to a planned maintenance management regime and/or scheduling component/asset replacement in the current or next budget. Manage by routine procedures involves managing the risk through existing operations and maintenance procedures.
5.6 Analysis of Risk
The team conducted an analysis of credible risks identified in Table 4.1 using the method described above to determine a level of risk for each credible risk.
The credible risks and levels of risk are shown in Table 6.2.
6. RISK EVALUATION
6.1 General
Risk evaluation involves comparing the level of risk found during the analysis process with previously established risk evaluation criteria and deciding whether the risks can be accepted.
Options should be evaluated on the basis of the extent of risk reduction and the extent of benefits or opportunities created, taking into account the criteria developed in Section 3.4.
In general, the adverse impact of risks should be made as low as reasonably practicable irrespective of any absolute criteria. A combination of options may give the optimum risk reduction outcome.
If the risks fall into the acceptable or low categories, they may be accepted with minimal further treatment. Acceptable or low risks should be monitored and periodically reviewed to ensure they remain acceptable.
If the risks do not fall into the acceptable or low category, they should be managed using one of the options below.
The output of risk evaluation is a prioritised list of risks for further action.
6.2 Risk Evaluation
Table 6.2 shows the evaluation of risks using the criteria determined in Section 4 and identified risks that are considered as not acceptable to meet the organisation’s objectives and for which, risk treatment plans are required. Risk treatment plans are developed in Section 7.
- 15 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Table 6.2 Risk Analysis and Evaluation
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
1 Possible
Insignificant
Minor Minor Insignificant
Minor Minor Medium
Planned action required
No No Yes Yes Yes Yes No
2 Possible
Moderate
Moderate
Moderate
Moderate
Minor Moderate High Prioritised action required
No No No No No No No
3 Likely Minor Minor Minor Minor Insignificant
Minor Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
4 Unlikely
Minor Minor Minor Insignificant
Insignificant
Minor Low Manage by routine procedures
Yes Yes Yes Yes Yes Yes Yes
5 Almost certain
Major Major Minor Major Major Major Very High
Immediate corrective action
Yes Yes Yes Yes Yes Yes Yes
- 16 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
6 Possible
Moderate
Moderate
Minor Moderate
Moderate
Moderate High Prioritised action required
No No No No No No No
7 Rare Moderate
Moderate
Minor Moderate
Minor Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
8 Likely Moderate
Moderate
Moderate
Moderate
Moderate
Moderate High Prioritised action required
No No No No No No No
9 Unlikely
Moderate
Moderate
Minor Minor Minor Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
10 Likely Moderate
Moderate
Insignificant
Moderate
Moderate
Moderate High Prioritised action required
No No No No No No No
11 Rare Moderate
Moderate
Minor Moderate
Moderate
Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
- 17 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
12 Possible
Insignificant
Moderate
Insignificant
Insignificant
Insignificant
Moderate High Prioritised action required
No No Yes Yes Yes Yes No
13 Rare Major Major Major Major Major Major Medium
Planned action required
No No No No No No No
14 Almost certain
Minor Minor Minor Minor Minor Minor High Prioritised action required
Yes Yes Yes Yes Yes Yes Yes
15 Almost certain
Minor Minor Minor Minor Minor Minor High Prioritised action required
Yes Yes Yes Yes Yes Yes Yes
16 Almost certain
Minor Minor Minor Minor Minor Minor High Prioritised action required
No No No No No No No
17 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
- 18 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
18 Possible
Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
19 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
20 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
21 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
22 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
23 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
- 19 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
24 Likely Minor Minor Minor Minor Minor Minor Medium
Planned action required
No No No No No No No
25 Almost certain
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Very High
Immediate corrective action
Yes Yes Yes Yes Yes Yes Yes
26 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
Yes Yes Yes Yes Yes Yes Yes
27 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
Yes Yes Yes Yes Yes Yes Yes
28 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
29 Almost certain
Minor Minor Minor Minor Minor Minor High Prioritised action required
No No No No No No No
- 20 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
30 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
31 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
32 Almost certain
Insignificant
Insignificant
Insignificant
Insignificant
Insignificant
Insignificant
Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
33 Unlikely
Minor Minor Minor Minor Minor Minor Low Manage by routine procedures
Yes Yes Yes Yes Yes Yes Yes
34 Unlikely
Moderate
Moderate
Moderate
Moderate
Moderate
Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
35 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
- 21 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
36 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
37 Possible
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
Yes Yes Yes Yes Yes Yes Yes
38 Possible
Minor Minor Minor Minor Minor Minor Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
39 Rare Minor Minor Minor Minor minor Minor Low Manage by routine procedures
Yes Yes Yes Yes Yes Yes Yes
40 Rare Moderate
Moderate
Moderate
Moderate
Moderate
Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
41 Possible
Moderate
Moderate
Insignificant
Moderate
Moderate
Moderate High Prioritised action required
No No No No No Yes No
- 22 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK ANALYSIS RISK EVALUATION (is the risk acceptable?)
Risk No
.
Likelihood
Conseq. Injury
Conseq. Service
Int.
Conseq. Environ
ment
Conseq. Financia
l
Conseq. Reputati
on
Overall Conseque
nces
Risk ratin
g
Action require
d
Operational
Technical
Financial
Legal
Social
Environmental
Is risk acceptable?
42 Possible
Minor Minor Minor Minor Minor Minor Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
43 Rare Minor Minor Minor Minor Minor Minor Low Manage by routine procedures
Yes Yes Yes Yes Yes Yes Yes
44 Rare Major Major Major Major Major Major Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
45 Rare Moderate
Moderate
Moderate
Moderate
Moderate
Moderate Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
46 Possible
Minor Minor Minor Minor Minor Minor Medium
Planned action required
Yes Yes Yes Yes Yes Yes Yes
47 Rare Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
High Prioritised action required
No No No No No No No
- 23 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
7. RISK TREATMENT PLANS
7.1 General
The treatment of risk involves identifying the range of options for treating risk, evaluating those options, preparing risk treatment plans and implementing those plans.
This includes reviewing existing guides for treating that particular risk, such as Australian and State legislation and regulations, Australian Standards and Best Practise Guides. Developing risk treatment options starts with understanding how risks arise, understanding the immediate causes and the underlying factors that influence whether the proposed treatment will be effective.
One treatment option is to remove the risk completely by discontinuing the provision of the service. Other options include risk reduction by reducing the likelihood and/or the consequences of the risk.
7.2 Manage the Risks
Risks need to be managed appropriately to the significance of the risk and importance of the affected item/asset to the organisation’s service delivery. As a general guide:
low levels of risk can be accepted and additional action may not be needed; these risks should be monitored,
major or significant levels of risk should be managed with actions to reduce or eliminate the risk,
high levels of risk require close management and the preparation of a formal plan to manage the risks.
Options for managing risk are shown below. The optimum solution may involve a combination of options.
Avoid the risk by deciding not to proceed with the activity that would incur the risk, or choose an alternative course of action that achieves the same outcome,
Reduce the level of risk by reducing the likelihood of occurrence or the consequences, or both; the likelihood may be reduced through management controls, organisational or other arrangements which reduce the frequency of, or opportunity for errors, such as alternative procedures, quality assurance, testing, training, supervision, review, documented policy and procedures, research and development.
the consequences may be reduced by ensuring that management or other controls, or physical barriers, are in place to minimise any adverse consequences, such as contingency planning, contract conditions or other arrangements.
Transfer the risk by shifting the responsibility to another party (such as an insurer), who ultimately bears the consequences if the event occurs. Risks should be allocated to the party which can exercise the most effective control over those risks.
Accept and retain the risks within the organisation where they cannot be avoided, reduced or reduced or transferred, or where the cost to avoid or transfer the risk is not justified, usually because the risk is acceptable or low. Risks can be retained by default, ie. Where there is a failure to identify and/or appropriately transfer or otherwise manage risks
The cost of managing risks needs to be commensurate with the benefits obtained, the significance of the event and the risks involved.
- 24 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
7.3 Risk Treatment Process
The risk treatment process comprises 5 steps.
Step 1. Review causes and controls
The risk identification process documented in Section 5 included identifying possible causes and documenting existing controls.
Step 2. Develop treatment options
Treatment options include those that eliminate risk, reduce the likelihood or the risk event occurring, reducing the consequences should the risk event occur, sharing of the risk with others and accepting the risk.
Step 3. Assess risk treatment options against costs and residual risk
The method of assessment of risk treatment options can range from an assessment by a local group of stakeholders and practitioners experienced in operation and management of the assets/service to detailed risk cost and risk reduction cost/benefit analysis.
Step 4. Select optimum risk treatment
Step 5. Develop risk treatment plans
7.4 Risk Treatments Options
The risk treatment options identified for non-acceptable risks shown in Table 6.2 are detailed in Table 7.4.
7.5 Risk Treatment Plans
From the optimum risk treatment options identified in Table 7.4, risk treatment plans were developed.
The risk treatment plans identify for each non-acceptable risk:-
Proposed action
Responsibility
Resource requirement/budget
Timing
Reporting and monitoring required
The risk treatment plan is shown in Table 7.5.
- 25 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Table 7.4: Risk Treatment
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
1 A Develop Inspection program $0 Unlikely Minor Low
B Remove intrusive roots $10 Unlikely Minor Low
C
D
2 A Develop Inspection program $0 Unlikely Minor Low
B Develop maintenance program $50 Unlikely Minor Low
C
D
3 A
B
C
D
4 A
B
C
D
5 A
B
C
D
6 A Scheduled inspection by Irrigation Authorities
B Scheduled maintenance of structures by Irrigation Authorities
C
D
7 A
B
C
- 26 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
D
8 A Increase inspection frequency during extended wet periods
$0 Unlikely Minor Low
B
C
D
9 A
B
C
D
10 A Increase inspection frequency during extended wet periods
0 Unlikely Minor Low
B
C
D
11 A
B
C
D
12 A Prepare signage plans and ensure signs available. Document procedures
$10 Unlikely Minor Low
B
C
D
13 A Leevee Maintenance 50 Rare Moderate Medium
B
C
D
14 A
B
C
- 27 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
D
15 A
B
C
D
16 A Monitor recent improvements 0 Unlikely Minor Low
B Priortise any need for improvement
0 Unlikely Minor Low
C Wait for next good rain 0 Unlikely Minor Low
D
17 A
B
C
D
18 A Conduct review of driange for Berrigan township
$0 Possible Minor Medium
B
C
D
19 A Conduct review of driange for Berrigan township
0 Possible Minor Medium
B
C
D
20 A Monitor recent improvements 0 Unlikely Minor Low
B Priortise any need for improvement
0 Unlikely Minor Low
C Wait for next good rain 0 Unlikely Minor Low
D
21 A Monitor recent improvements 0 Unlikely Minor Low
B Priortise any need for improvement
0 Unlikely Minor Low
- 28 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
C Wait for next good rain 0 Unlikely Minor Low
D
22 A Develop SOP's for Rural Roads, drainage inspections and mainteance
0 Unlikely Minor Low
B
C
D
23 A Develop SOP's for drianage inspection and maintenance
0 Unlikely Minor Low
B
C
D
24 A Conduct review of driange for Berrigan township
$0 Unlikely Minor Low
B Conduct review of driange for Finley township
$0 Unlikely Minor Low
C
D
25 A
B
C
D
26 A
B
C
D
27 A
B
C
D
28 A Construct underpasses 0 Rare Insignificant Low
- 29 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
B
C
D
29 A Construct underpasses 0 Rare Insignificant Low
B
C
D
30 A Upgrade causeways $0 Unlikely Minor Low
B
C
D
31 A upgrade bridges 0 Unlikely Minor Low
B
C
D
32 A
B
C
D
33 A
B
C
D
34 A
B
C
D
35 A Develop program to upgrade council roads to new deisgn widths
1300 Unlikely Minor Low
B
C
- 30 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
D
36 A Develop program to clear roadsides of obstacles
100 Unlikely Minor Low
B
C
D
37 A
B
C
D
38 A
B
C
D
39 A
B
C
D
40 A
B
C
D
41 A Update SOP's for Footpath inspection and mainteance
0 Unlikely Minor Low
B
C
D
42 A
B
C
D
43 A
- 31 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT OPTIONS OPTIONS RESIDUAL RISK
Risk No. No. Treatment option(s) Cost $000
Likelihood (from Col H)
Consequences (from Col N)
Residual risk
B
C
D
44 A
B
C
D
45 A
B
C
D
46 A
B
C
D
47 A Develop Inspection and Maintenance Program
$0 Rare Catastrophic High
B
C
D
- 32 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
Table 7.5: Risk Treatment Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
1 Develop and document SOP's for kerb and gutter and drains inspections. Prepare works program
Low 1 Prepare works program OM Staff Time $10 Dec-14
2 Develop and document SOP's for kerb and gutter inspections
EXE Staff Time $0 Dec-14
3 Develop and document SOP's for drains inspections
EXE Staff Time $0 Dec-14
4
2 Develop procedures for inspection of rural culverts and drainage. Prepare works program
Low 1 Prepare works program OM Staff Time $50 Dec-14
2 Develop and document SOP's for culvert inspections
EXE Staff Time $0 Dec-14
3
4
3 1
2
3
4
4 1
2
3
4
5 1
2
3
4
6 Write to Irrigation Authorities and request details of their inspection and maintenance plans.
Low 1 Write to Irrigation Authorities and request details of their inspection and maintenance plans
EXE Staff Time 0 Dec-14
- 33 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
Suggest improvements if not considered adequate.
2 Suggest improvements if not considered adequate.
EXE Staff Time $0 Dec-14
3
4
7 1
2
3
4
8 Review timelines for inspections and response times during extended wet periods
Low 1 Review timelines for inspections and response times during extended wet periods
EXE Staff Time 0 Dec-14
2
3
4
9 1
2
3
4
10 Review timelines for inspections and response times during extended wet periods
Low 1 Review timelines for inspections and response times during extended wet periods
EXE Staff Time $0 Dec-14
2
3
4
11 1
2
3
4
12 Prepare signage plan Low 1 Prepare signage plan EXE Staff Time $0 Dec-14
- 34 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
Develop procedures Ensure any permanent signage is installed Ensure required temporary signs are available
2 Develop procedures for impimentation
EXE Staff Time $0 Dec-14
3 Ensure any permanent signage is installed
OM Staff Time $5 Dec-14
4 Ensure required temporary signs are available
OM Staff Time $5 Dec-14
13 Prepare SOP's for leevee inspection and maintenance
Medium 1 Prepare Sop's for Levee inspection and maintenance
EXE Staff Time 0 #########
2 Provide maintenance schedule
EXE Staff Time 0 #########
3 Maintain levee OM Staff Time 50 #########
4
14 1
2
3
4
15 1
2
3
4
16 monitor drainage issues Low 1 Monitor drainage issues EXE Staff Time $0 Ongoing
2
3
4
17 1
2
3
4
18 Conduct review of driange for Berrigan
Low 1 Review town drainage EXE Staff Time $0 Dec-14
2 Program works EXE Staff Time $0 Dec-14
- 35 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
township 3
4
19 Conduct review of driange for Berrigan township
Low 1 Review town drainage EXE Staff Time $0 Dec-14
2 Program works EXE Staff Time $0 Dec-14
3
4
20 monitor drainage issues Low 1 Monitor drainage issues EXE Staff Time $0 Ongoing
2
3
4
21 monitor drainage issues Low 1 Monitor drainage issues EXE Staff Time $0 Ongoing
2
3
4
22 Develop SOP's for Rural Roads, drainage inspections and mainteance
Low 1 Develop SOP's for Rural Roads, drainage inspections and mainteance
EXE Staff Time 0 Dec-14
2
3
4
23 Develop SOP's for drianage inspection and maintenance
Low 1 Develop SOP's for drianage inspection and maintenance
EXE Staff Time 0 Dec-14
2
3
4
24 Conduct review of driange for Berrigan township. Conduct
Low 1 Conduct review of driange for Berrigan township
EXE Staff Time $0 Dec-14
- 36 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
review of driange for Finley township
2 Conduct review of driange for Finley township
EXE Staff Time $0 Dec-14
3
4
25 1
2
3
4
26 1
2
3
4
27 1
2
3
4
28 Constrct Underpasses Low 1 Regularly inspect sites to ensure adequate signage is in place when stock is crossing
SO Staff Time 0 Ongoing
2 Liaise with landowners and advise that they should be providing for the construction of underpasses in the long term
DM Staff Time 0 Dec-14
3
4
29 Constrct Underpasses Low 1 Regularly inspect sites to ensure adequate signage is in place when stock is crossing
SO Staff Time 0 Ongoing
- 37 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
2 Liaise with landowners and advise that they should be providing for the construction of underpasses in the long term
DM Staff Time 0 Dec-14
3
4
30 Upgrade causeways Low 1 upgrade causeways when traffic volumes and budget allow
EXE Staff Time $500
2
3
4
31 upgrade bridges Low 1 upgrade bridges when traffic volumes and budget allow
EXE Staff Time 500
2
3
4
32 1
2
3
4
33 1
2
3
4
34 1
2
3
4
- 38 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
35 Develop program to upgrade council roads to new deisgn widths
Low 1 Develop program to upgrade council roads to new deisgn widths
EXE Staff Time 0 Ongoing
2
3
4
36 Develop program to clear roadsides of obstacles
Low 1 Develop program to clear roadsides of obstacles
OM Staff Time 100 Ongoing
2
3
4
37 1
2
3
4
38 1
2
3
4
39 1
2
3
4
40 1
2
3
4
41 Update SOP's for Footpath inspection and mainteance
Low 1 Update SOP's for Footpath inspection and mainteance
EXE Staff Time 0 Dec-14
2
- 39 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
RISK TREATMENT PLAN
Risk No.
Treatment Plan [best option(s)]
Residual Risk Actions Responsibility Resources Budget $000
Date due
3
4
42 1
2
3
4
43 1
2
3
4
44 1
2
3
4
45 1
2
3
4
46 1
2
3
4
47 Devlop SOP"s for Bridge Inspection and maintenance
Medium 1 Devlop SOP"s for Bridge Inspection and maintenance
EXE Staff Time $0 Dec-14
2
3
4
- 40 -
Berrigan Shire Council – Transport Infrastructure Risk Management Plan
8. MONITORING AND REVIEW
Monitoring and review is an essential and integral step in the process of managing risk. It is necessary to monitor risks, the effectiveness of any plans, strategies and management systems that have been established to control implementation of risk management actions.
The plan will be monitored and reviewed as follows.
Table 8: Monitoring and Review Program
Activity Review Process
Review of new risks and changes to existing risks
Annual review by team with stakeholders and report to council
Review of Risk Management Plan 4 yearly review and re-write by team and report to council
Performance review of Risk Treatment Plan
Action plan tasks incorporated in council staff performance criteria with 6 monthly performance review.
Action plan tasks for other organisations reviewed at annual team review meeting
9. REFERENCES
ISO 31000:2009, Risk management – Principles and guidelines, Standards Australia, Sydney.
HB 436:2004, Risk Management Guidelines, Companion to AS/NZS 4360:2004, Standards Australia, Sydney.
IPWEA, 2011, International Infrastructure Management Manual, Institute of Public Works Engineering Australia, Sydney, www.ipwea.org.au/IIMM