PE 2019
The use of Pavement Management Systems (PMS) to manage and process the “big data” sets generated from continuous measurement road condition surveys to develop practical
maintenance plans and budgets.
By
Graeme Paterson, BSc C.Eng MICE
Associate Director, W.D.M Limited
PE 2019
e.g. vehicle based continuous road condition surveysBig Data…
Road Assessment Vehicles(RAV): e.g. WDM’s SCANNER and TRACS4:
“road speed” measurement of around 40 parameters including Texture, Rutting, Alignment, Profile, Cracking etc. Collected at down to 1 inch intervals summarized at 33 feet (10m intervals):Around 7000 pieces of data per mile.
Functional,Safety and Structural
measurements
Structural measurements
e.g. Deflection Measurement (Deflectograph):
WDM’s Deflectograph Data is collected and summarized at around 120 inch intervals and collects deflection on both wheeltracks
Around 3000 pieces of data per mile.
e.g. Continuous Friction using SCRIM® :WDM’s SCRIM® combines Texture, Skid Resistance, IRI and Alignment measurements nominally every 4 inches and summarized every 33 feet (10m).
Around 5000 pieces of data per mile.
Safety measurements
PE 2019
e.g. Scottish Government Major Road Network is 2,200 miles.
Similar length to the National Highway System of a medium size US State (Utah or NJ)
Each year, they survey around:
• 4400 miles SCRIM
• 2200 miles SCANNER
• 800 miles Deflectograph
Approximately 35 million pieces of data per annum.
This data has been collected continuously since 1989 and this is managed within their Asset Management System (around 1 billion pieces of data).
Big Data…Typical Road Network
PE 2019
RAV’s - New TRACS4 Vehicle
Latest RAV vehicle developed by W.D.M. Limited for
Highways England TRACS4 Contract (English Government)
Uses Laser Crack Measurement System (LCMS) 3d Crack
detection plus Retro-Reflectivity sensors and
greater detail for transverse and longitudinal profile
measurements
WDM have been working on the development of models making better use of the very detailed 3d profiles from
SCANNER and TRACS4 vehicles (around 1.5 million measurements per mile)
PE 2019
Fretting/Ravelling Prediction – using SCANNER and TRACS
Stage 1 research: identification of existing defects i.e. a very accurate
visual survey without the subjectivity of video surveys
PE 2019
Stage 2: since WDM provide 70% of all RAV surveys in UK
We are currently using surveys from many years to refine prediction models in advance of defects
becoming visible
Stage 1 research: RHS – statistical representation of transverse and longitudinal profile
LHS: summarising profile in a meaningful manner for wheel tracks and whole carriageway
PE 2019
Survey data needs to quickly be available in your PMS
PMS System
Data Validation/Quality
System
GPS
GPS fitting to Road Network Centreline and lane
PE 2019
Pavement Management System (PMS)…Key functions required to facilitate managing these “Big Data” sets
PMS SystemSkid Policy
Implementation(managing IL’s and Skid Investigations)
Links to other Asset System modules. E.g. Crash System
Construction, Maintenance and
Traffic Data
Data Processing Algorithms for all survey/data types
Remote Working (phone apps) e.g
On-site SKID Investigations
Whole Life costing and Life Cycle Planning Tools
Web Mapping and publishing layers to Internet/Intranet
Maintenance Scheme Prediction and Prioritization
Reporting Module and document
System
PE 2019
Integrated Mapping/GIS tools…
Easy access to all datasets both summary and detailed
PE 2019
PMS – construction/maintenance database…This allows you to maintain a history of all treatments, material specifications, contractors, aggregate source etc. Useful for monitoring performance of treatments etc.
PMS also needs management systems for Traffic statistics and Maintenance Policy.
PE 2019
PMS Processing…merges all datasets together to produce useful outputs.
Structural processing
Safety processing
Functional processing
Scheme Prediction and summarizing
settings
Other processing options
PE 2019
… from inception to completion
PMS Processing…Maintenance Scheme Management
Surveys
Scheme Identification
Scheme Prioritorisation
Scheme
Co-ordination
Scheme Performance
PE 2019
PMS Processing - Whole Life Costing and Life Cycle Planning models based on “real” proposed maintenance Schemes and programs
This both calculates costs to meet the desired Maintenance Policy but also allows testing of various actual budgets to gauge their effect on network condition.
PE 2019
Continuous Friction Measurement and PMS
PE 2019
Continuous Friction measurement…e.g. WDM US SCRIM® …
US SCRIM built for FHWA in 2015 and operated by Virginia Tech. (LHS in background)
Measures SCRIM Coefficient, Texture (MPD), Horizontal Curvature, Grade, Cross Slope and Video
Second SCRIM in US this year operated by WDM - extra functionality over US SCRIM1: Longitudinal profile (IRI)
PE 2019
Manage Survey Routes, Survey, Data Fitting, SCRIM vs Crash Calculation
UK Government Skid Policy Implementation (HD28) using SCRIM (for routine testing)….
PMS is used to manage the processing of Continuous Friction data alongside Crashes, Texture and Friction Demand I.L’s to determine where treatments need to be undertaken.
Setting Investigatory Levels and Management of Reviews
Desktop Management of Initial SKID Investigations
Mobile Phone App for Secondary Investigations on-site (online/offline)
0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65
A Interstate highways
B Divided highways w/o intersections, grade, etc.
C Two lane road w/o intersections, grade, etc.
Q Intersection (& roundabouts)
K Pedestrian crossings and other high risk areas
R Roundabout
G1 Slope 5-10%, longer than 160 feet
G2 Slope >10% longer than 160 feet
S1 Curve radius < 1600 feet - divided roads
S2 Curve radius < 1600 feet - two lane roads
Road classification definitions
Investigatory level (31 or 50 mph)
Investigatory Levels (US)
PE 2019
MSSC=0.42 SCRIM Score = 50
AVG_MPD = 1.19 Tex Score = 10
Crash_Count= 6 Wet Crash Score = 70
Crash Severity_Index = 50.4 Crash Severity Index Score = 70
Wet Crash Count = 4 Curvature Score =20
Total Crash_Skid Score = 220
Crash Skid Scores (in the absence of Friction Demand categories)
PE 2019
Road deaths have dropped in the UK despite similar increases in traffic and vehicle registrations as the US
Scottish Transport Statistics, No 36, 2017 Edition
13,110
8,36044,119
46,437
41,000
42,000
43,000
44,000
45,000
46,000
47,000
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Injuries and Fatalities Traffic (million vehicle km)
36.2% decreasein killed and injured
5.3% increasein vmi travelled
million vehicle km
# injuries and fatalities
Traffic Volume vs. Number of Accidents, Scotland (2006-2016)
Compared with the U.S., Scotland had an identical 5.3% increase in vehicle miles travelled and a 14% increase in number of vehicle
registrations, but a 36.2% decline in injuries and fatalities.
PE 2019