Contents
• The Key of Installation
• The Key of Commissioning
• Precautions for Dangerous Handling
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 3/25
HUAWEI TECHNOLOGIES CO., LTD.Page 3
Huawei Confidential
(e#ore 'ount t!e %ntenn%) *r$t to 'ount t!e +nti,
#%ll &l%'p
The key of Installation
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 4/25
HUAWEI TECHNOLOGIES CO., LTD.Page 4
Huawei Confidential
The key of Installation
In$t%ll%tion o# %ntenn%
Note: Remove the rubber plugs of the two air holes on the bottom
of the antenna, as shown in gure with red circles.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 5/25
HUAWEI TECHNOLOGIES CO., LTD.Page 5
Huawei Confidential
Note: Remove the rust and anti-rust paint from the iron tower
when xing the grounding clip.
The key of Installation
-D. %nd I c%ble grounding
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 6/25
HUAWEI TECHNOLOGIES CO., LTD.Page 6
Huawei Confidential
The key of Installation
!e 0u%lity o# I connector
Note: Rotate the lock nut instead of the connector shell to tightenthe connector. Use proper force to rotate the lock nut to preventdamaging the outer covering of the connector.
After making the IF connector, we must to check it is ashort circuit or not!
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 7/25
HUAWEI TECHNOLOGIES CO., LTD.Page 7
Huawei Confidential
I c%ble l%bel
Before the IF cables are hoisted, take roer rotection
measures and dustroof measures for the IF cable connectors.
!abel the cables so that the main cables can be distin"uished
from the standby cables, and there is no confusion when IF
cables are connected.
The key of Installation
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 8/25
HUAWEI TECHNOLOGIES CO., LTD.Page 8
Huawei Confidential
The key of Installation
!e in$t%ll%tion o# -D.12%y 'ore %ttention to t!e pol%ri4%tion
o# t!e -D./%ntenn% %nd coupler
62 !e '%in -D. 'u$t be in$t%lled on t!e '%in
inter#%ce o# t!e coupler) %nd t!e $t%ndby
-D. 'u$t be in$t%lled on t!e $t%ndby
inter#%ce o# t!e coupler
%in
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 9/25
HUAWEI TECHNOLOGIES CO., LTD.Page 9
Huawei Confidential
8n$ure t!%t t!e I inter#%ce on t!e -D. #%ce$ le#t or rig!t)
downw%rd$) %#ter t!e -D. in$t%ll%tion i$ co'plete
The key of Installation
#nsure that the IF interface on the $%& faces left or ri"ht, downwards, after the $%& installation
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 10/25
HUAWEI TECHNOLOGIES CO., LTD.Page 10
Huawei Confidential
The key of Installation %ter proo# o# t!e I inter#%ce on -D. %nd I c%ble grounding
Note: hen wrapping the connector with the waterproof tape and !"# tape, $ou should
stretch the tape to %&' of its original width. (n addition, the upper la$er should cover
about )&* of the lower la$er.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 11/25
HUAWEI TECHNOLOGIES CO., LTD.Page 11
Huawei Confidential
The key of Installation %ter proo# o# I c%ble grounding
Note: +trip the sheath o the ( cable according to the length of the
grounding clip. o not strip an$ shielding la$er of the ( cable.
Note: o not ground the ( cable at the point where the cable is bent.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 12/25
HUAWEI TECHNOLOGIES CO., LTD.Page 12
Huawei Confidential
The key of Installation +#ter t!e %lign'ent o# %ntenn%) you 'u$t be $ure t!e
%ntenn% i$ locked
e !%ve to c!eck t!e volt%ge o# input power
(nstall the black cable to the working ground busbar, and
install the blue cable to the air breaker
(f the standard voltage of the input power is /'0 ", the tested value of the
voltage should range from /%0.' " to -12.3 ".
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 13/25
HUAWEI TECHNOLOGIES CO., LTD.Page 13
Huawei Confidential
&ontent$
!e "ey o# In$t%ll%tion
!e "ey o# &o''i$$ioning
rec%ution$ #or D%ngerou$ %ndling
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 14/25
HUAWEI TECHNOLOGIES CO., LTD.Page 14
Huawei Confidential
The key of 'ommissionin"
1/ !e con*gur%tion o# I 1;1 $y$te' <S( %nd D212 !e '%in I bo%rd 'u$t be connected to t!e '%in -D. %nd
t!e $t%ndby I bo%rd 'u$t be connected to t!e $t%ndby -D.
62 !e 'et!od o# c!ecking I 1;1 $y$te' <S( %nd D2
&!eck t!e receive power o# t!e '%in %nd $t%ndby -D. !e
receive power o# '%in -D. $!ould be l%rger t!%n $t%ndby
-D.
I# cu$to'er %$k u$ to open t!e +&) ple%$e p%y 'ore
%ttention to t!e +& lower t!re$!old It 'u$t be l%ger
1=d(' t!%n t!e receive t!re$!old o# t!e -D. I# t!e
cu$to'er !%ve no t!e re0uire'ent) no need to open t!e
+&
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 15/25
HUAWEI TECHNOLOGIES CO., LTD.Page 15
Huawei Confidential
The key of 'ommissionin"
I# it i$ % 1;1 $y$te') turn o> t!e $t%ndby -D. %nd
'%ke $ure t!e +& i$ di$%bled w!en %ligning t!e
%ntenn%$
I# t!e bot! o# I bo%rd$ %nd -D.$ %re nor'%l) butt!e receive power o# %in -D. i$ le$$ %bout ?d('
t!%n $t%ndby -D.) '%ybe t!e '%in -D. connect$
to t!e $t%ndby I bo%rd @ou c%n *r$tly turn o> t!e
'%in %nd $t%ndby -D.A$ power) %nd t!en eBc!%nge
t!e I Cu'per$ o# '%in %nd $t%ndby I bo%rd$
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 16/25
HUAWEI TECHNOLOGIES CO., LTD.Page 16
Huawei Confidential
&ontent$
!e "ey o# In$t%ll%tion
!e "ey o# &o''i$$ioning
rec%ution$ #or D%ngerou$ %ndling
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 17/25
HUAWEI TECHNOLOGIES CO., LTD.Page 17
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling #or t!e oggle Lever
Switc!
!ocation and (ositions of the To""le !e*er +witch
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 18/25
HUAWEI TECHNOLOGIES CO., LTD.Page 18
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling #or t!e oggle Lever Switc!
Before turnin" the to""le le*er switch, you must ull i t out sli"htly. Turn on the ower switch
Turn on the ower switch
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 19/25
HUAWEI TECHNOLOGIES CO., LTD.Page 19
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I u'per
Before remo*in" or insertin" the IF umer, you must owero- the $%&.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 20/25
HUAWEI TECHNOLOGIES CO., LTD.Page 20
Huawei Confidential
(recautions for %an"erous)andlin"
rec%ution$ #or %ndling t!e I u'per %o not remo*e or insert the IF umer when the $%& is
owered on.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 21/25
HUAWEI TECHNOLOGIES CO., LTD.Page 21
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I &%ble
Before remo*in" or insertin" the IF cable, you must owero- the $%&.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 22/25
HUAWEI TECHNOLOGIES CO., LTD.Page 22
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I &%ble %o not remo*e or insert the IF cable when the $%& is
owered on.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 23/25
HUAWEI TECHNOLOGIES CO., LTD.Page 23
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I (o%rd
Before remo*in" or insertin" the IF board, you must owero- the $%&.
7/25/2019 The Key of Installation and Commissioning
http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 24/25
HUAWEI TECHNOLOGIES CO., LTD.Page 24
Huawei Confidential
(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I (o%rd %o not remo*e or insert the IF board when the $%& is