The Hokie Load The Hokie Load Releasing HitchReleasing Hitch
• 32’ 8mm Dynamic Prusik Cord
• Extra Large Delta or Pear shaped carabiner
• Large Delta or large carabiner
• Dissimilar Carabiner
Required MaterialsRequired Materials
Place a large delta in a bight made Place a large delta in a bight made in the cord then place ain the cord then place a
Munter knot in the extra large deltaMunter knot in the extra large delta
Pull hitch togetherPull hitch together
Pull deltas 6”-8” apart and allow Pull deltas 6”-8” apart and allow munter to roll over deltamunter to roll over delta
Cross tail ends in large delta so Cross tail ends in large delta so that each end is on the opposite that each end is on the opposite
side of the delta side of the delta
Close deltas and wrap tails at least Close deltas and wrap tails at least 5 wraps5 wraps
Pass a bight (both cords) throughPass a bight (both cords) throughDO DO NOTNOT pull ends through pull ends through
Daisy chain tails together and tie Daisy chain tails together and tie cord ends together with a double cord ends together with a double
fisherman knotfisherman knot
Place dissimilar carabiner Place dissimilar carabiner through 3 loopsthrough 3 loops
Clip dissimilar carabiner into extra Clip dissimilar carabiner into extra large deltalarge delta
To use in a system - place extra To use in a system - place extra large delta toward anchorlarge delta toward anchor
And large delta towards the loadAnd large delta towards the load
Remember – Clip, Munter, CrossRemember – Clip, Munter, Cross
Extra large delta points toward Extra large delta points toward anchoranchor
XL Delta
Operation:Operation:Hold tension and Hold tension and unwind wraps, unwind wraps, Munter will allow Munter will allow for gradual for gradual transfer of loadtransfer of load