The GEOSS Interoperability Process Pilot Project
Siri Jodha Singh KhalsaIEEE Committee on Earth Observations
Standards Working Group
ADC-IV Tokyo # 2
Contents
• Scope and purpose of the IP3• The GEOSS Interoperability Process and the
Standards and Interoperability Forum• Description of use case scenarios• Progress Report • Schedule
ADC-IV Tokyo # 3
Origins of the IP3
• The GEO ADC recognized the need to begin implementing the GEOSS infrastructure and testing the process for reaching interoperability.
• The concept for an “Interoperability Process Pilot Project” was presented, reviewed and endorsed by the ADC co-Chairs in July 2006.
• GEO Task AR-06-01 given task of developing a series of projects involving different SBA’s, leading up to a suite of demonstrations at the GEO Summit in November.
ADC-IV Tokyo # 8
“Interoperability Arrangements”
• When two GEOSS components conform to the same data description and transport standards, and are well-defined within the GEOSS registries, interoperability should be achievable with minimal effort
• Where two GEOSS components do not share common standards, or where the service definitions are not adequate, interoperability “Special Arrangements” will need to be made.
• This will be managed by the GEO “Standards and Interoperability Forum.”
ADC-IV Tokyo # 9
IP3 Development Phases
• Phase 1 – Populating the Component, Services and Interoperability Registers
• Phase 2 – Develop Cross-System Interoperability Scenarios, invoke SIF
• Phase 3 – Create Demonstrations • Phase 4 – Work on Higher Levels of
Interoperability• Repeat process with new components and
scenarios to address other SBAs
ADC-IV Tokyo # 10
Participating Systems and Principals
• Biodiversity– Hannu Saarenmaa & Stefano Nativi
• Seismology– Tim Ahern
• CEOP– Ryosuke Shibasaki
• WMO Information System - WIS– David Thomas
ADC-IV Tokyo # 11
Phase 1 – Populating the Registers
• Populate the GEOSS registers– Identify the standards, interface protocols and interoperability
agreements in use– Provide information to the Clearinghouse as it is brought online
• Analyze successful data integration projects, showing– why and how interoperability arrangements were made and
maintained– how the interoperability arrangements worked under the
computer and network environment of the time– what the impacts were of these arrangements
ADC-IV Tokyo # 12
GEOSS Interoperability Process
Component Contributor
Register Component
Reference registered standard
Capture details of proposed GISA*
Begin Service Registration
Component has
interface?Done
Uses registere
d standard
?
Y
Y
N
N
DonePass proposed
GISA to SIF
*GEOSS Interoperability Special Arrangement
ADC-IV Tokyo # 13
The Standards and Interoperability Forum
• A Standards and Interoperability Forum (SIF) is being formed to carry out impartial review of GEOSS interoperability issues and to recommend solutions.
• Helping to establish the SIF and refining its protocols and procedures is one of the key objectives of the IP3.
ADC-IV Tokyo # 15
SIF Role in Phase 1 of IP3
• During Service Registration, if the service does not use an existing “GEOSS Recognized Standard” (GRS) the contributor will enter details on proposed “GEOSS Interoperability Special Arrangements” (GISA).
• This information will be passed to the SIF, which will manage entries into the “Special Arrangements” register hosted by the IEEE.– Interoperability Register = Standards Register + Special
Arrangements Register
• The SIF will also review and recommend promotion of GISAs to GRSs as appropriate.
ADC-IV Tokyo # 16
Phase 2 – Cross-System Interoperability Scenarios
• Develop scenarios that require the exchange of data and information between disparate systems which have not yet established a mechanism for such an exchange.– Address needs identified in one or more of the
Societal Benefit Areas– Ensure relevancy and realism
• Demonstrate how the GEOSS architecture, data, and services have made it possible to realize benefits that would not have been easily achieved otherwise
ADC-IV Tokyo # 17
SIF Role in Phase 2 of IP3
• The SIF will assist in management or creation of interoperability arrangements between systems – Seek the input of technical and discipline experts– Evaluate Special Arrangements as submitted at
service registration– Analyze existing entries in the Interoperability
Register for applicability
ADC-IV Tokyo # 18
Scenario Worksheet
ADC-IV Tokyo # 19
Extended Scenario Template
1. Plain Language Description1.1. Short Definition1.2. Purpose1.3. Describe a scenario of expected use1.4. Definition of Success
2. Formal Use Case Description2.1. Use Case Identification2.2. Revision Information2.3. Definition2.4. Successful Outcomes2.5. Failure Outcomes
3. Use Case Elaboration3.1. Actors3.2. Schematic of Use case3.3. Preconditions3.4. Postconditions3.5. Normal Flow (Process Model)3.6. Alternative Flows3.7. Special Functional Requirements
4. Non-Functional Requirements4.1. Performance4.2. Reliability4.3. Scalability4.4. Usability4.5. Security4.6. Other Non-functional Requirements
5. Selected Technology5.1. Overall Technical Approach5.2. Architecture5.3. Technology A5.3.1. Description5.3.2. Benefits5.3.3. Limitations5.4. Technology B5.4.4. Description5.4.5. Benefits5.4.6. Limitations6. References
ADC-IV Tokyo # 20
IP3 Scenarios and Data Flows
WIS
GBIF
FDSN
CEOP
Species Response to Climate Change
ScenarioNativi
Fault Lubrication Scenario
Ahern
Landslide Risk Scenario
Thomas
Flood Risk Scenario
Burford
Seismic Events from Glacier/Ice
Sheet Disintegration
ScenarioAhern
Exotic event catalog
Terminus retreat
GLIMS
Event catalog
Precip (NCAR/TIGGE), stream gauge (CUAHSI /USGS)
Seismic Trigger
Precip, soil moisture (TIGGE)
Climate data (NCAR)
Species data
DEM (DEMIS)
Ancillary
Meningitis Early Warning System
Kelly
Precip, soil moisture (TIGGE)
Soil moisture, stream gage, etc.
ADC-IV Tokyo # 31
Species Response to Climate Change
• Ecological Niche Modeling is applied to study the adaptation of butterflies in Canada and Alaska to various climate change scenarios. Requires interoperability between the GBIF (Global Biodiversity Information Facility) and components of the WIS (World Meteorological Organization Information System).
ADC-IV Tokyo # 32
Flood Risk Scenario
• A distributed surface run-off model provides data for flood warning and dam operation systems. Requires interoperability between CEOP (Coordinated Enhanced Observation Period) systems and components of the WIS.
ADC-IV Tokyo # 33
Landslide Risk
• Analysis to determine whether rainfall and seismic data be used to predict locations where hillsides are susceptible to collapse. Requires interoperability between the FDSN (International Federation of Digital Seismographic Networks), the WIS, and an interoperable landslide database network in Australia.
ADC-IV Tokyo # 34
Fault Lubrication
• Analysis to determine whether high rainfall rates or excess groundwater produce increased earthquake activity in areas of known faults. Requires interoperability between FDSN and WIS components.
ADC-IV Tokyo # 35
Seismic Events from Glacier/Ice Sheet Disintegration
• Analysis of seismic signals and a combination of remote sensing and in situ data for selected glaciers to determine whether global seismic networks can be used to monitor ice sheets and glacial activity and thus remotely sense effects of warming on a global scale. Requires interoperability between FDSN and databases at the National Snow and Ice Data Center.
ADC-IV Tokyo # 36
Scenario End Points
• Two of the scenarios (GBIF and Flood Risk) have substantial resources backing them– Schedule/critical path for these being worked– End point is live demo plus video or narrated slide
show
• The scenarios involving FDSN may not evolve past conceptual stage due to lack of resources– End point is 2-page write up
• At least 2 of the scenarios will require “special arrangements” to be registered, thus ensuring involvement of the SIF.
ADC-IV Tokyo # 37
Phase 3 – Demonstrations
• Present results of Phase 2 to the Architecture and Data Committee and then with all GEO Members and Contributing Organizations – Prepare a briefing on the process – Include live demonstration of those infrastructure components
that have been implemented• The Interoperability Register and Registry
• Data and information exchange via the defined arrangements
• Two kinds of demonstrations– technical– social benefit demo for policy makers and senior managers– to illustrate interoperability process and its benefits
ADC-IV Tokyo # 38
Phase 4 – Higher Levels of Interoperability
• Develop higher levels of interoperability– Exercise more completely the capabilities of the
protocols and interfaces identified– Address semantic interoperability
• Ensure the meaning of the data and information exchanged through the interfaces are intelligible to the recipient systems
ADC-IV Tokyo # 39
IP3 Status
• Component registration forms filled out for all components– Awaiting component registry to become operational
• Scenario sheets written, including service interface descriptions– Specifics being captured as service registry is used
• Standards registry is operational– Common international standards as initial content
ADC-IV Tokyo # 40
Schedule
Milestone Delivery Date
Component registration forms completed Feb ‘07
Draft scenarios delivered Feb ‘07
Standards Registry Availability Announced May 18
SIF Call for Participation Released May 25
Extended scenarios delivered June 1
Components and Standards registers populated w/ IP3 data May ‘07
Demonstration to ADC Sept ‘07
Delivery of IP3 documents Nov ‘07
ADC-IV Tokyo # 41
Summary
• The Interoperability Process Pilot Projects are contributing to the development of the GEOSS architecture by exercising core GEOSS components and processes.
• The scenarios under development are fully compliant with, and representative of, the GEOSS process for reaching interoperability.