The following The following sheets sheets show show
Some of Some of our capabilities in the fabrication of structural steel and our capabilities in the fabrication of structural steel and
construction activities.construction activities.
We can We can assist given assist given your specific your specific project requirementsproject requirements
technical specifications and locationtechnical specifications and location
ContactASIA's Resource Connections Melbourne, Australia Johannesburg, South Africa Beijing, China Email – [email protected] – www.asias-connections.asia
We can, with our associations in the industry organise the fabrication and erection of heavy steel structures, such as those for limestone roasting, coke ovens, blast roasting, coke ovens, blast furnaces, converters, electric furnaces, continuous casting, hot rolling, cold rolling in metallurgical industry and other industries.We can undertake civil construction works, including pilingFabricated steel has been exported and construction projects undertaken in countries such as England, Australia, France, Germany, Mongolia, South Korea, USA, Mexico, Tanzania, Pakistan, Japan, Indonesia and Thailand.
Technical Data Sheet
Structural Steel Fabrication
There are three major manufacturing facilities in China covering some 850 000 square meters of which 130 000 square meters is under cover. The factories are capable of producing upwards of 45 000 tons per annum of fabricated steel products and annual turnover exceeds US$40m.
Steel sections to many international standards are produced and specific requirements can be made on request.
Some of the equipment used Some of the equipment used in the manufacturing process are digitally controlled profile cutting, plasma arc cutting and drilling machines. Submerged arc welding machines are used and all fabricated items are sand or bead blasted before painting.
All the manufacturing facilities are ISO 9001 certified and apply the best quality control practices
Technical Data Sheet
Construction
Above piling activities for a hot rolling line for a steel works and left bulk reinforcing steel being placed. Below concrete columns being cast
Blast Furnace construction has successfully been completed ahead of schedule, in typically 13 to 14 months, whilst incorporating new technologies or processes
Technical Data Sheet
Construction
100 ton Arc Furnace Project produces 700 000 tons of molten steel and 670 000 tons of continuously cast sheet steel per year.The length of the casting bay is 144 meters, with a span of 30 meters and a total building area of 42231 square metersof 42231 square meters
Headgear and shaft steelwork for a mine in Mongolia
Technical Data Sheet
References
The table below lists some of the projects that have been completed. For more specific references please send us a brief description of your project or needs.
Project Area m2 Steel tons
JEF Hot Galvanising Plant Project 56569 6908
POSCO Stainless Steel Project 92914 6590
2250mm Hot Roll Mill Project 45317 18120
2160mm Hot Roll Mill Project 65400 7133
1880mm Hot Roll Mill Project 82619 97001880mm Hot Roll Mill Project 82619 9700
Cold Roll Mill Project 150659 13376
Wide Steel Thick Plate Project 199933 27334
Thin Plate Chroming and Tinning Project 51018 5411
Wide Thick Plate Project 50000 12000
Stainless Steel Cold Roll Line 7300
150 Ton Electric Arc Furnace 120000 25000
90 Ton Electric Arc Furnace 16000 7000
100 Ton Electric Arc Furnace 35000 12950
Four 120 Ton Converter Casting Project 70000 20000
Three 100 Ton Converter Casting Project 80000 14000
1420mm Cold Roll Mill Project 160000 17300
1550mm Cold Roll Mill Project 24000 8300
Stainless Steel Hot Roll Mill Project 6838
Stainless Steel Long Product Line 4630
1800mm Cold Roll Mill Project 82619 26064