Team Filthy FiltersTeam Filthy FiltersMid-semester Design ReviewMid-semester Design Review
11-18-0411-18-04
11-18-0411-18-04 Filthy FiltersFilthy Filters 22
Team MembersTeam Members Ian KincaidIan Kincaid
Kevin LoeweKevin Loewe
Tom CoburnTom Coburn
11-18-0411-18-04 Filthy FiltersFilthy Filters 33
Problem StatementProblem Statement
Argonne National Laboratory – West Argonne National Laboratory – West is challenging team Filthy Filters to is challenging team Filthy Filters to create a disassembly station for create a disassembly station for nuclear grade HEPA Filters. Due to nuclear grade HEPA Filters. Due to the dangerous level of contamination the dangerous level of contamination in these filters, this process must in these filters, this process must take place in a remote hot cell take place in a remote hot cell environment. environment.
11-18-0411-18-04 Filthy FiltersFilthy Filters 44
Step 1: Separation of PartsStep 1: Separation of Parts
Function:Function: Separation of Filter Separation of Filter
and Frameand Frame Constraints:Constraints:
Completely Remove Completely Remove all Piecesall Pieces
Design Alternatives:Design Alternatives: Punch PressPunch Press ““Hammer Jack”Hammer Jack” ““Pull & Peel”Pull & Peel”
11-18-0411-18-04 Filthy FiltersFilthy Filters 55
Punch PressPunch Press
11-18-0411-18-04 Filthy FiltersFilthy Filters 66
““Pull & Peel”Pull & Peel”
11-18-0411-18-04 Filthy FiltersFilthy Filters 77
Step 2: Filter MediaStep 2: Filter Media
11-18-0411-18-04 Filthy FiltersFilthy Filters 88
Step 3: Aluminum Step 3: Aluminum SeparatorsSeparators
Function:Function: Remove AluminumRemove Aluminum
Constraints:Constraints: Approx. 90 per sideApprox. 90 per side
Design Design Alternatives:Alternatives: Slave ManipulatorsSlave Manipulators JigJig
11-18-0411-18-04 Filthy FiltersFilthy Filters 99
Slave ManipulatorsSlave Manipulators
LimitationsLimitations
11-18-0411-18-04 Filthy FiltersFilthy Filters 1010
Separator JigSeparator Jig
11-18-0411-18-04 Filthy FiltersFilthy Filters 1111
Step 4: Resize MediaStep 4: Resize Media
Function:Function: Resize MediaResize Media
Constraints:Constraints: 1 by 2 inch strips1 by 2 inch strips
Design Design Alternatives:Alternatives: Cheese GraterCheese Grater Paper ShredderPaper Shredder
11-18-0411-18-04 Filthy FiltersFilthy Filters 1212
Cheese GraterCheese Grater
11-18-0411-18-04 Filthy FiltersFilthy Filters 1313
Paper ShredderPaper Shredder
11-18-0411-18-04 Filthy FiltersFilthy Filters 1414
Step 5: Waste ContainerStep 5: Waste Container
Function:Function: Dispose StripsDispose Strips
Constraints:Constraints: Position CanPosition Can
Design Design Alternatives:Alternatives: ConveyorConveyor
11-18-0411-18-04 Filthy FiltersFilthy Filters 1515
ConveyorConveyor
Pros/ConsPros/Cons
11-18-0411-18-04 Filthy FiltersFilthy Filters 1616
Step 6: StabilizationStep 6: Stabilization
Process to be Process to be developed to developed to glassify materialglassify material
11-18-0411-18-04 Filthy FiltersFilthy Filters 1717
Step 7: Metal FrameStep 7: Metal Frame
11-18-0411-18-04 Filthy FiltersFilthy Filters 1818
Step 8: BoltsStep 8: Bolts
Function:Function: Remove BoltsRemove Bolts
Constraints:Constraints: LocationLocation
Design Alternatives:Design Alternatives: Linear Motion DeviceLinear Motion Device
AutomatedAutomated User ControlledUser Controlled
Don’t IncludeDon’t Include
11-18-0411-18-04 Filthy FiltersFilthy Filters 1919
Linear Motion DeviceLinear Motion Device
11-18-0411-18-04 Filthy FiltersFilthy Filters 2020
Step 9: WeldsStep 9: Welds
Function:Function: Break WeldsBreak Welds
Constraints:Constraints: Minimize DustMinimize Dust
Design Design Alternatives:Alternatives: GrinderGrinder Cutoff WheelCutoff Wheel Don’t IncludeDon’t Include
11-18-0411-18-04 Filthy FiltersFilthy Filters 2121
Cuttoff WheelCuttoff Wheel GrinderGrinder
11-18-0411-18-04 Filthy FiltersFilthy Filters 2222
Step 10: Plywood FrameStep 10: Plywood Frame
Function:Function: Accommodate Accommodate
PlywoodPlywood Constraints:Constraints:
Wood, screwsWood, screws Design Design
Alternatives:Alternatives: SawsSaws
11-18-0411-18-04 Filthy FiltersFilthy Filters 2323
Step 11: FrameStep 11: Frame
Function:Function: Separate PiecesSeparate Pieces
Constraints:Constraints: Stainless SteelStainless Steel
Design Design Alternatives:Alternatives: ““Pull & Peel” (# 6)Pull & Peel” (# 6)
11-18-0411-18-04 Filthy FiltersFilthy Filters 2424
Step 12: Resize Metal/WoodStep 12: Resize Metal/Wood
Function:Function: Resize MaterialsResize Materials
Constraints:Constraints: 3 Different Materials3 Different Materials
Design Alternatives:Design Alternatives: Chop SawChop Saw Plasma CutterPlasma Cutter TorchTorch
11-18-0411-18-04 Filthy FiltersFilthy Filters 2525
Chop SawChop Saw
11-18-0411-18-04 Filthy FiltersFilthy Filters 2626
Plasma CutterPlasma Cutter
11-18-0411-18-04 Filthy FiltersFilthy Filters 2727
TorchTorch
11-18-0411-18-04 Filthy FiltersFilthy Filters 2828
Step 13: Waste ContainerStep 13: Waste Container
Function:Function: Dispose MaterialDispose Material
Constraints:Constraints: Position CanPosition Can
Design Design Alternatives:Alternatives: Conveyor (# 15)Conveyor (# 15)
11-18-0411-18-04 Filthy FiltersFilthy Filters 2929
Project BudgetProject Budget
Square Stock Steel - 2” x 2” x ¼” – 7 @ $81 per 8 ft. ($567)Square Stock Steel - 2” x 2” x ¼” – 7 @ $81 per 8 ft. ($567) Air Wrench – 1 @ $200 ($200)Air Wrench – 1 @ $200 ($200) Worm Gear Assembly – 6 @ $75 ($450)Worm Gear Assembly – 6 @ $75 ($450) Bulk Aluminum, Fasteners, Welding Supplies, Various Parts Bulk Aluminum, Fasteners, Welding Supplies, Various Parts
($2000) ($2000)
Project TimelineProject TimelineSchedule (Fall Semester)Schedule (Fall Semester)
11/18/0411/18/04 Design ReviewDesign Review11/20/04 – 11/29/0411/20/04 – 11/29/04 Individual ResearchIndividual Research11/30/0411/30/04 Final DirectionFinal Direction11/30/04 – 12/3/0411/30/04 – 12/3/04 Preliminary Solid ModelingPreliminary Solid Modeling12/6/04 - 12/10/0412/6/04 - 12/10/04 Build Testing Apparatus for Build Testing Apparatus for
PullerPuller12/13/04 – 12/17/0412/13/04 – 12/17/04 Test Puller DesignTest Puller Design12/18/04 – 1/7/0512/18/04 – 1/7/05 Begin Ordering PartsBegin Ordering Parts1/10/05- 1/31/51/10/05- 1/31/5 Finalize Solid Model and Finalize Solid Model and
Drawing Package.Drawing Package.Modify DesignModify Design
11-18-0411-18-04 Filthy FiltersFilthy Filters 3131
Q & AQ & A