April 10 through 12, 2014
“21 for 21” A 21st Century Green Vision for the 21st Street Corridor
Study Area A
Study Area B
Study Area C
http://www.southsidegreen.com
ContributorsTom BatroneyJeremy BrownKathy ChavaraHeather FullerJen KullgrenTim PrevostPatrick RobertsMike TakacsAnna WerleMegan Zeigler
Study Area A – Team 1
April 10 through 12, 2014
• Goals:– Accommodate Pedestrian, Bicycle and Vehicles– Traffic calming and safety– Cycling as transportation – Minimize parking impacts– Balance access and circulation– Stormwater capture for 1” of rainfall runoff– Separate stormwater system
April 10 through 12, 2014
April 10 through 12, 2014
Study Area A – Transportation Design Featureshttp://www.southsidegreen.com
• Pedestrian, Bicycle, and Business Friendly and Integrated– Two Way Bicycle Traffic – Loading Docks Accommodated – Reallocating Two Parking Spaces
April 10 through 12, 2014
April 10 through 12, 2014
Birmingham Bridge
New Bicycle Lane to 21st Street
April 10 through 12, 2014 http://www.southsidegreen.com
Study Area A
April 10 through 12, 2014 http://www.southsidegreen.com
Study Area A - East Carson Street to Fox Way
April 10 through 12, 2014 http://www.southsidegreen.com
Study Area A - Fox Way to Merriman Way
April 10 through 12, 2014 http://www.southsidegreen.com
Study Area A - Merriman Way to the River
April 10 through 12, 2014 http://www.southsidegreen.com
Before
April 10 through 12, 2014 http://www.southsidegreen.com
After
April 10 through 12, 2014
21st Street Cross Section
April 10 through 12, 2014
Wharton Street Cross Section
April 10 through 12, 2014
Study Area A – Stormwater Design Features
http://www.southsidegreen.com
• Designed Ground Level Impervious Area and Building Roof Area– Permeable Paver Subsurface Storage – Bioinfiltration Rain Gardens – Stormwater Day Lighting and Stepped Wetlands
Stormwater Management of 1.1 inches
3.5’ Deep
April 10 through 12, 2014
Study Area A – Stormwater Design Features
http://www.southsidegreen.com
• Increased Green Space Area – 5000 Sq Ft Added– Landscaped Traffic Calming Bumpouts– Planter Boxes and Trees
• Additional Tree Canopy – Approx. 38 Trees Total• ~23 Large Sized Trees and ~15 Smaller Size
April 10 through 12, 2014
Staghorn Sumac Sweetbay Magnolia Bald Cypress
BlackgumAmerican HophornbeamSwamp White Oak
April 10 through 12, 2014
“21 for 21”Questions?
Top Related