TcpTunnel – Setting Out and Surveying for Tunnels
TcpTunnel
TcpTunnel – Setting Out and Surveying for TunnelsINDEX
• Main Features
• Program Structure
• Surveying
• Setting Out
• Tools and Utilities
TcpTunnel – Setting Out and Surveying for TunnelsMain Features
Total Stations and Platforms Supported
• Total Stations• Geodimeter, Geomax, Leica, Nikon, Pentax, • Sokkia, Spectra, Trimble, Topcon
• Devices• Mobile devices with ARM processor
• Operating Systems• Microsoft Pocket PC 2003 / 2003 SE• Microsoft Windows Mobile 5.x / 6.x• Microsoft Windows CE 4.x / 5.x / 6.x
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Main Menu
•Clear structure of software•Data organized in projects•ASCII data files•Windows-based user interface•Easy to use
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Projects
Options ComponentsSupported filesProperties
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Tunnel Cross-sections
Management Editing Theoretical cross-section drawing
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Cross-section Types
Creation of Simple and Composite sections in Mobile Device
Creation of Complex cross-sections in CAD
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Other Files Supported (1)
Horizontal Alignments Vertical Alignments Superelevations
TcpTunnel – Setting Out and Surveying for TunnelsProgram Structure
Other Files Supported (2)
Points Stations
TcpTunnel – Setting Out and Surveying for TunnelsPosition
Angular By Coordinates Resection
TcpTunnel – Setting Out and Surveying for TunnelsSURVEYING
TcpTunnel – Setting Out and Surveying for Tunnels
SurveyingCross-Section Survey
Cross-section Points Definition Cross-section SurveyData Entry
TcpTunnel – Setting Out and Surveying for Tunnels
SurveyingPoint Measurements
Point Measurements
TcpTunnel – Setting Out and Surveying for TunnelsSurveying
Grid
Data Entry Take Grid
TcpTunnel – Setting Out and Surveying for Tunnels
SurveyingPoints Scan
Data Entry Drawing
TcpTunnel – Setting Out and Surveying for TunnelsSETTING OUT
TcpTunnel – Setting Out and Surveying for TunnelsSetting Out the Front
Setting Out the FrontData Entry
TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Cross-Sections
Setting Out Cross-sectionsData Entry
TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Road Surface
Setting Out Road SurfaceData Entry
TcpTunnel – Setting Out and Surveying for TunnelsSetting Out Points
Setting Out PointsData Entry
TcpTunnel – Setting Out and Surveying for TunnelsCHECKING
TcpTunnel – Setting Out and Surveying for Tunnels
CHECKINGCross-sections and Points
Checking Cross-sections Checking Points
TcpTunnel – Setting Out and Surveying for Tunnels
CHECKINGCross-sections Drawing
Theoretical and Measured Cross-sections
Measured Cross-section with Points Drawing
Under-excavation and Over-excavation Surfaces
Calculation
TcpTunnel – Setting Out and Surveying for TunnelsTOOLS
TcpTunnel – Setting Out and Surveying for TunnelsPoints Analysis on Alignment
Point Coordinates Calculation Point Analysis on Alignment
TcpTunnel – Setting Out and Surveying for TunnelsDistance and Area among Points
Distance between Points Area among Points
TcpTunnel – Setting Out and Surveying for TunnelsSETTINGS
TcpTunnel – Setting Out and Surveying for TunnelsConfiguration Options (1)
Equipment Options Units of Measurement
TcpTunnel – Setting Out and Surveying for TunnelsConfiguration Options (2)
Communications Tolerances Survey