Stormwater Runoff Management and Modeling in Southwest Louisiana

Justin M. Shaw, MS, PE Jeanne C. Arceneaux Hornsby, MS, PE Robert L. Miller, MS, PE

StormCon 2012

Page 2: Storm Con 2012

PRESENTATION OUTLINE

http://tetiarebeachresort.com/resources/photos.htm

• Project History

• Hydraulic and Hydrologic Modeling

• Best Management Practices

• Public Involvement and Acquiring Funds

Page 3: Storm Con 2012

CONSULTANTS AND AGENCIES

LSU Atlas

ECM

Page 4: Storm Con 2012

PROJECT LOCATION CALCASIEU PARISH, LA

Page 5: Storm Con 2012

OCTOBER 2006 STORM EVENT PRECIPITATION

0

1

2

3

4

5

6

7

8

9

10

11

12

10

/1/2

00

6

10

/3/2

00

6

10

/5/2

00

6

10

/7/2

00

6

10

/9/2

00

6

10

/11

/20

06

10

/13

/20

06

10

/15

/20

06

10

/17

/20

06

10

/19

/20

06

10

/21

/20

06

10

/23

/20

06

10

/25

/20

06

10

/27

/20

06

10

/29

/20

06

10

/31

/20

06

Dai

ly P

reci

pit

atio

n (i

nch

es)

Date

Old Town Bay

Moss Bluff

Lake Charles 7 NW - Sam Houston

Lake Charles 2N

Dry Creek

Page 6: Storm Con 2012

OCTOBER 2006 STORM EVENT AERIAL PHOTOGRAPHS

Page 7: Storm Con 2012

NUMERICAL MODELING DATA COLLECTION EFFORT

• Total Study Area: 360 sq mi

• Studied Basins: 274

• Studied Channel Length: 236 mi

• Collected Survey Points: 28,000

• Hydrologic Modeling Software: HEC-HMS v3.4

• Hydraulic Modeling Software: HEC-RAS v4.1.0

• GIS Software: ESRI ArcMap v9.3.1

Page 8: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: LIDAR & STUDY AREA

Page 9: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: BASIN & LAND USE

Page 10: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: SOIL GROUP & CURVE NUMBER

Page 11: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: FEMA COMPARISON

0 5000 10000 15000 20000 25000-10

0

10

20

30

40

Sabine_South_Calibrated Plan: 100YR_Calibrated

Main Channel Distance (ft)

Ele

vatio

n (

ft)

Legend

WS Max WS

Ground

OWS Max WS

W11 R1

0 2000 4000 6000 8000 10000 12000 14000-5

0

5

10

15

20

Sabine_South_Calibrated Plan: 100YR_Calibrated

Main Channel Distance (ft)

Ele

vatio

n (

ft)

Legend

WS Max WS

Ground

OWS Max WS

W3_L4 R1

Page 12: Storm Con 2012

NUMERICAL MODELING WARD 1: AERIAL COMPARISON

Page 13: Storm Con 2012

NUMERICAL MODELING DRAINAGE IMPROVEMENTS

Page 14: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: CULVERT DRAINAGE IMPROVEMENTS

Page 15: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: CHANNEL DRAINAGE IMPROVEMENTS

Page 16: Storm Con 2012

NUMERICAL MODELING SABINE-LACASSINE: INUNDATION IMPROVMENTS

Page 17: Storm Con 2012

BEST MANAGEMENT PRACTICES

• Detention Ponds

• Low Impact Development

• Maximizing Green Space

Page 18: Storm Con 2012

MAINTENANCE PLANS

• Maintenance

• Inspection

• Access

• Owner Responsibilities

• Ordinances

Page 19: Storm Con 2012

PUBLIC INVOLVEMENT

• Awareness and Education

• Stormwater Newsletter

• PSA and Media

• Webpage

• Drainage Complaints

• Dumping and Littering

Page 20: Storm Con 2012

ACQUIRING FUNDS

• Hazard Mitigation

• Pre-Disaster Mitigation Grant

• Flood Mitigation Assistance

• Repetitive Flood Claims

• Severe Repetitive Loss

Page 21: Storm Con 2012

CONCLUSIONS

• Project History

• Hydraulic and Hydrologic Modeling

• Best Management Practices

• Public Involvement and Acquiring Funds

Page 22: Storm Con 2012

Experience │ Innovation │ Results

WATER RESOURCES Hydraulic & Hydrologic Engineering

337.237.2200