Download - Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

Transcript
Page 1: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

• Minneapolis Campus 360 acres

• St. Paul campus 540 acres

• 265 buildings

• 46 miles of sidewalk and plaza

• 16 miles of streets

• Stairs, many stairs

University of Minnesota Winter Maintenance

Page 2: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Seasonal snowfall avg. - 54 inches 2013/2014 – 70 inches At least 1 inch of snow on ground from 12/4/13 – 4/4/14

Page 3: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

53 days below zero Coldest day -23F

Page 4: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Page 5: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

• Trace of snow – sidewalks mechanically

broomed & stairs swept/shoveled • 1” of snow – tops of parking ramps

plowed • 2” of snow – parking lots plowed • 3” of snow – streets plowed

Snow Removal Guidelines

Page 6: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Snow Removal Personnel

• 25 FT Landcare employees • 50 student employees • 50 custodial staff • 30 snow-removal vendor staff • 10 Parking staff

Page 7: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Snow Removal Equipment

• 6 skid steers • 2 Toolcats • 6 Polar Cats • 2 Walk-behind

Contractor

Mechanical Brooms

• 30 – 35 pickups with plows

Blade-equipped

Shovels, lots and lots of shovels

• Front-end loaders, dump trucks, road graders

Page 8: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

What happens when this happens?

Page 9: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

• If snow is forecast and temperature is in the range of 15F to 32F, streets and sidewalks pre-treated with 23% salt brine solution

• Pre-treatment helps prevent snow/ice from bonding to pavement

• If temperatures below 15F, calcium chloride w/beet solution used. Beet solution reduces corrosiveness

• Solutions spread using vehicles with 2,500 gallon tanks

Page 10: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Page 11: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Excessive use of snow-melt chemicals

Page 12: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

All hands on deck at 3:00 a.m. for forecast snow of 3 + inches

Page 13: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Page 14: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Page 15: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Page 16: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Where does all the snow go?

Page 17: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

As a practical matter, what does it all mean?

Page 18: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

• University estimates 80,000 visitors a day – 3rd largest trip generator in state

• Even in the depths of winter 1,000 + bikes a day on campus

• Tunnel and skyway system takes many people indoors, but usually results in longer trip time

Page 19: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

0

100

200

300

400

500

600

700

800

900

1000

September 2013

October 2013

November 2013

December 2013

January 2014

February 2014

909

766

573

191

115 146

Z

A

P

S

Page 20: Stepping Stones to Year-Round Bicycling and Walking: Tackling Winter Maintenance-Steve Sanders

University of Minnesota Winter Maintenance

Steve Sanders - Alternative Transportation Manager http://www1.umn.edu/pts/bike/bikeRFID.html

[email protected] – 612-625-1333