Download - Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

Transcript
Page 1: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

Status on the HYDE project

Collaboration:University of Huelva, Spain (coordinator)

GSI-Darmstadt, Germany.University of Sevilla, Spain.CSIC-IEM Madrid, Spain.IKS-University of Leuven, Belgium.CRC Louvain la Neuve, Belgium.A. Soltan Institute for Nuclear Studies, Warsaw, Poland.H. Niewodniczandki Institute of Nuclear Physics PAN, Krakow, Poland.

Present support:FAZIA collaborationCEA-Saclay

Page 2: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

Physics at 3-20 MeV/u should we include up to 100 MeV/u??: - Direct Nuclear Reactions, Clustering, Fusion Evaporation, Deep Inelastic, etc.

The HYDE concept

Status and perspectives 2006-2008:- Preliminary concept design.- Simulations GEANT4.- Status and funding.

E1 E2 EDetection techniques:- E1 : gas/monolithic Si-10m.- E2 : DSSD 40 m.- E : Single PAD 2 mm.- Pulse shape analysis.- Time of flight.

HYDEGoals: - Charged particles.- Good charge and mass identification.- Efficiency (>60%).- Good energy resolution (<300 keV).- Angular resolution (<2º).

Beam: - Large emitance > 20 mmmrad.- Low intensity <107 pps.

Page 3: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

Preliminary concept design

- Handy design modular system

600mm ?

600m

m?

600mm ? 300mm

300m

m

300mm

AGATA chamber

Target

Page 4: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

0 10 20 30 40 50 60 Etotal / MeV

1H+

02468

101214161820

ED

SS

SD /

MeV

4He2+

6Li3+

9Be4+

10

20

30

40

50

0 10 20 30 40 50 60024

1H+

4He2+

6Li3+

9Be4+

68

10

Etotal / MeV

12 14161820

ED

SS

SD /

MeV

10

20

30

40

50

Simulations GEANT4

<E> = 5 MeV/uEFWHM = 3 MeV/u = 20 mm mradx,yFWHM= 3 cm

Track1DSSSD (40 m)

Track2DSSSD (40 m)

DSSSD (40 m)+ PAD (2 mm)

scattering = 30°FWHM = 2 °

2 m

208Pb1 mg/cm2

3.1% 1H+

11.1% 4He2+

10.7% 6Li3+

12.9% 9Be4+

at the target

1 m

Page 5: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

PRESENT STATUS

Materials por Charge Particle identification, position sensitive (up to 100 MeV/u ?): Solid state detectors Si + CsI Pulse shape analysis beyond S, Cl Gas detectors: HYDE/Tracking CEA/Saclay- E.C. Pollaco Diamond monocristal GSI ??

Simulations D. Rodríguez (Physics, LPC Caen /Univ. Huelva)

Technical: Mechanics & design: J.A. Bernal (Engineer, C.N.A collaboration, Sevilla) F. Pizarro (Engineer, DFA, Univ. Huelva)

Electronics& DACQ: R. Berjillos (Engineer, DFA, Univ. Huelva) J.L. Flores (Physics, DIEISA, Univ. Huelva) COLLABORATION: SCHOOL OF ENGINEERS (UHU)

FAZIA CollaborationR. Bougault /LPC-Caen

HYDE: R&D STAGE 2006-2007

Page 6: Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

HYDE DETECTOR:

Current period 2006: - Materials/Instruments/Travelling: about 20 k€ from present running projects- 1 year contract for electronic engineer

(Spanish Research Council-MEC)

Period 2007-2009:Application to Spanish Research Council

(MEC) (HUELVA & SEVILLA)1) Pulse shape analysis 2) Detector materials3) Development of tracking detectors4) Related experiments and collaborations- Materials/Traveling: 160 k€ / - Man power: 210 k€ /3 years contract for: 1 Engineer 1 Postdoc 1 PhD student.

LOW ENERGY TRACKING:

Current period 2006:-1 Postdoc (physics) - Experiments at Tandem with present equipment are foreseen for 2006.

Period 2007-2009:Application to Spanish Research Council (MEC) (SEVILLA & HUELVA): 1) Construction of a beam line for low energy tracking2) Related experiments and collaborations

- Materials/Travelling: 150 k€ -Man power: 210 k€ /3 years contract for:

1 Engineer 1 Postdoc 1 PhD student

R&D STAGE 2006-2007/FUNDING