Page 1: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

February 10, 2016

STARS PSTARS PSTARS PSTARS PROGRAMROGRAMROGRAMROGRAM

OOOOVERVIEWVERVIEWVERVIEWVERVIEW

Integrating Transportation Planning, Project

Development, and Project Programming

PPPPRESENTATIONRESENTATIONRESENTATIONRESENTATION OOOOUTLINEUTLINEUTLINEUTLINE

� What is the STARS Program?

� How can STARS Help You?

� Example STARS Project

� Next steps

2

Strategically Targeted and Affordable

Roadway Solutions

Page 2: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

SSSSUMMARYUMMARYUMMARYUMMARY

� Data

� Corridors

� Studies/Design

� Applications

� Six-Year Program

3

����

����

�RSTP/ CMAQ

Revenue Sharing

HB2

HSIP

TAP

WWWWHATHATHATHAT ISISISIS THETHETHETHE STARS STARS STARS STARS PROGRAMPROGRAMPROGRAMPROGRAM????

Program to develop solutions to reduce crashes and congestion bottlenecks using a data-driven approach

Crash hotspots

Speed data

AADT data

4

Overall goal of STARS is to develop solutions that Overall goal of STARS is to develop solutions that can be programmed in the VDOT

Six-Year Improvement Program (SYIP)

Use this information together

to identify corridors with

safety and congestion

challenges

Page 3: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS BSTARS BSTARS BSTARS BRIDGINGRIDGINGRIDGINGRIDGING THETHETHETHE GGGGAPAPAPAP

� Planning linked to operations/ITS, safety and design

� Designers engaged early in the planning process

� Project risks identified

� Readiness improved for project implementation

5

Estimates ����

Schedules ����

Miscellaneous Data

WWWWHATHATHATHAT DDDDATAATAATAATA ISISISIS AAAAVAILABLEVAILABLEVAILABLEVAILABLE????

6

INRIX (TTI, BTI, and PTI)

Avg. Annual Daily Traffic

VDOT SYIP Projects

Previous STARS Projects

Safety

Volume-Capacity Ratio

Page 4: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT DDDDEVELOPMENTEVELOPMENTEVELOPMENTEVELOPMENT CCCCORRIDORORRIDORORRIDORORRIDOR CCCCRITERIARITERIARITERIARITERIA

7

Source(s)

Supporting details needed

Percentiles

Percentiles

What type of study conducted

Description of problems/concerns

In State Highway Plan

NEPA Study

Approximate number of crashes

Percentiles

Percentiles

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Measure

Yes/No

Yes/No

Urban/Rural

Yes/No

Yes/No

Yes/No

Yes/No

Rank

Rank

Local / MPO Support

Funding Identified

Planning Time Index

Buffer Time Index

PSI Rating - Intersection

Planning

Designations

Corridor Length

Located on CoSS

Indicator

Corridor Location

Future Improvements IdentifiedIn Long Range Transportation Plan

Criteria

0.5 - 10 miles

SYIP Project

Safety

Operations

District

Coordination

Category

Yes/No

Economic Development Impact

Historic Crash Pattern

PSI Rating - Segment

V/C Ratio

Travel Time Index

Corridor Already Studied

District Identified Problems

District Administration Support

Source(s)

Supporting details needed

Percentiles

Percentiles

What type of study conducted

Description of problems/concerns

In State Highway Plan

NEPA Study

Approximate number of crashes

Percentiles

Percentiles

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Measure

Yes/No

Yes/No

Urban/Rural

Yes/No

Yes/No

Yes/No

Yes/No

Rank

Rank

Local / MPO Support

Funding Identified

Planning Time Index

Buffer Time Index

PSI Rating - Intersection

Planning

Designations

Corridor Length

Located on CoSS

Indicator

Corridor Location

Future Improvements IdentifiedIn Long Range Transportation Plan

Criteria

0.5 - 10 miles

SYIP Project

Safety

Operations

District

Coordination

Category

Yes/No

Economic Development Impact

Historic Crash Pattern

PSI Rating - Segment

V/C Ratio

Travel Time Index

Corridor Already Studied

District Identified Problems

District Administration Support

WWWWHYHYHYHY ISISISIS STARS ISTARS ISTARS ISTARS IMPORTANTMPORTANTMPORTANTMPORTANT TOTOTOTO YYYYOUOUOUOU????

� Prepares a source of current data

� Develops solutions that can be funded in the SYIP

• HB2, HSIP, CMAQ, RSTP, Revenue Sharing

� Improves accuracy of cost estimates and schedules

8

Page 5: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

RRRREVIEWEVIEWEVIEWEVIEW PPPPOTENTIALOTENTIALOTENTIALOTENTIAL PPPPROJECTROJECTROJECTROJECT CCCCORRIDORSORRIDORSORRIDORSORRIDORS

8

TTTTHEHEHEHE STARS TSTARS TSTARS TSTARS TEAMEAMEAMEAM

10

VDOT Districts and Residencies

� Coordinate with localities, MPOs, and PDCs

� Submit STARS applications

� Lead STARS projects

� Coordinate with consultant team

VDOT Central Office

� Provides program oversight, data analysis, and application review

Consultants

� Provide project support

Page 6: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTSROJECTSROJECTSROJECTS

11

LLLLYNCHBURGYNCHBURGYNCHBURGYNCHBURG EEEEXPRESSWAYXPRESSWAYXPRESSWAYXPRESSWAY (US 29 B(US 29 B(US 29 B(US 29 BUSUSUSUS))))

� 4.5 miles of limited access highway

� 10 interchanges / 41 ramps / 23 intersections

� Built in phases between 1950s and 1970s

� City of Lynchburg

� Liberty University

� Traffic analysistools used

• CORSIM

• Synchro

Page 7: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT SSSSUMMARIESUMMARIESUMMARIESUMMARIES

13

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT DDDDEVELOPMENTEVELOPMENTEVELOPMENTEVELOPMENT CCCCYCLEYCLEYCLEYCLE

13

Page 8: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

NNNNEXTEXTEXTEXT SSSSTEPSTEPSTEPSTEPS

� STARS 2016 annual study cycle

� Coordinate with VDOT District Planner

� Contact Samuel W. Hayes, PE

Transportation and Mobility Planning Division

(804) 586-2718 – office

(804) 896-3762 – mobile

[email protected]

15

QQQQUESTIONSUESTIONSUESTIONSUESTIONS????

16http://www.virginiadot.org/projects/stars_ii.asp