N
DE
EP
DE
NE
R
OA
D
P
O
R
T
C
H
E
S
T
E
R
C
L
O
S
E
S
U
N
R
A
Y
A
V
E
N
U
E
EXISTING SIGN 958 TO BE RELOCATED
ON EXISTING LAMP COLUMN. SIGN TO BE
OFFSET AWAY FROM CARRIAGEWAY.
EXISTING SIGN POST TO BE REMOVED.
3.2
3.0
1.8
4.2
5.8
DENMARK HILL
REINSTATE AND ENLARGE TREE PIT.
RAISE BACK OF FOOTWAY LEVELS
AND RECONSTRUCT FOOTWAY TO
IMPROVE FOOTWAY DRAINAGE
3.0
3.2
6.4
3.2
4.0
EXISTING SIGN 959 TO BE
RELOCATED ON EXISTING
LAMP COLUMN. SIGN TO
BE OFFSET AWAY FROM
CARRIAGEWAY.
EXISTING SIGN POST TO
BE REMOVED.
EXISTING SIGN
959 TO BE
REPLACED ON
EXISTING LAMP
COLUMN. SIGN
TO BE OFFSET
AWAY FROM
CARRIAGEWAY.
3.2
3.0
3.0
3.2
3.0
3.2
RECONSTRUCTED PEDESTRIAN
ISLAND.
CO
NT
IN
UA
TIO
N - R
EF
ER
T
O L
AY
OU
T B
C
O
N
T
IN
U
A
T
IO
N
- R
E
F
E
R
T
O
IN
S
E
T
A
2.5
4.0
3.7
WIDTH OF RIGHT TURN POCKET TO
BE REDUCED TO IMPROVE
SOUTHBOUND MERGE.
AG
AG
AG
AG
AG
AG
AG
AG
BU
S S
HE
LTE
R
BUS SHELTER
AG
LC
LC
LC
LC
LC
LC
LC
BB
BO
BO
P
BO
BO
RS
RS
PS
PS
PS
A
C
L
A
N
D
C
R
E
S
C
E
N
T
BLA
NC
HE
DO
WN
E
EXISTING HATCHING REMOVED AND
BUS LANES WIDENED TO 4.0M.
EXISTING RAISED CONTROLLED
CROSSING RETAINED
3.0
4.0
3.0
4.0
C
O
N
TIN
U
A
TIO
N
- R
EF
ER
T
O
L
A
YO
U
T C
CO
NT
IN
UA
TIO
N - R
EF
ER
T
O L
AY
OU
T A
DENMARK H
ILL
3.2
3.0
6.0
6.1
4.0
6.1
4.0
INFORMAL CROSSING
REMOVED AND FOOTWAY
RECONSTRUCTED TO SUIT.
EXISTING CENTRAL ISLAND
TO BE REMOVED AND
CARRIAGEWAY REINSTATED
N
REMOVE SIGN 959 FROM LAMP COLUMN.
REMOVE SIGN 543, ASSOCIATED
SUPPLEMENTARY PLATE AND POST.
MOUNT NEW SIGN 959 ON EXISTING
LAMP COLUMN. SIGN TO BE OFFSET
AWAY FROM CARRIAGEWAY.
AG
AG
AG
AG
AG
AG
EG
EG
AG
BU
S S
HE
LTER
BOBO
BB
LC
LC
LC
LC
LC
LC
LCRS
RS
PS
N
A
B
5.1
N
C
O
N
TIN
U
A
TIO
N
- R
E
FE
R
T
O
L
A
Y
O
U
T A
SC
HE
ME
E
XT
EN
T
A
G
A
G
L
C
P
S
LEGEND
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2018. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
IS
O F
ULL B
LE
ED
A
3 420 X
297 M
MY
:\C
0488 R
MP
441 D
EN
MA
RK
H
ILL\50 C
AD
\20 S
HE
ET
S\C
0488-S
HE
-20-0.D
WG
RMP440/441: Denmark Hill
between Sunray Avenue and Champion Hill
OUTLINE DESIGN
SHEET 1 OF 2
DC
DG
HMC
AGB
12/07/19APRIL 2019
60493382-C0488-OD-01
FOR APPROVAL1 : 500 @ A3
C
60493382-C0488
LAYOUT A
LAYOUT B
AGBAADCFIRST ISSUE14/01/190
LC
UP TO 40MM ASPHALT CARRIAGEWAY
RESURFACING
UP TO 100MM ASPHALT CARRIAGEWAY
RESURFACING
ASPHALT CARRIAGEWAY REINSTATEMENT
FOOTWAY RECONSTRUCTION
(CONCRETE SLABS)
EXISTING COVER (UNAFFECTED)
EXISTING UTILITY COVERS TO BE ADJUSTED TO
NEW FOOTWAY / CARRIAGEWAY LEVEL
EXISTING LAMP COLUMN TO REMAIN
PROPOSED SIGN ON EXISTING LAMP COLUMN
REMOVE SIGN FROM EXISTING LAMP COLUMN
REMOVE POST
REMOVE POST AND SIGN
EXISTING GULLY TO REMAIN
EXISTING GULLY COVER TO BE REPLACED WITH
CYCLE-FRIENDLY COVER
EXISTING BUS SHELTER TO REMAIN
EXISTING TREE TO REMAIN
PROPOSED TREE PIT CONSTRUCTION
PROPOSED ROAD MARKINGS
EXISTING ROAD MARKINGS TO REMAIN
EXISTING ROAD MARKINGS TO BE REMOVED
PROPOSED GRANITE FULL HEIGHT KERB
(150MM WIDE)
PROPOSED GRANITE FULL HEIGHT KERB
(300MM WIDE)
EG
BUS SHELTER
AG
KEY
NOTES
1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LB
SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND
ALL RELEVANT CONTRACT CLAUSES.
3. TOPOGRAPHICAL SURVEY COMPLETED IN JANUARY 2018
AND FEBRUARY 2019 BY PREMIER SURVEYS.
4. LOCATIONS OF PROPOSED GULLIES ARE INDICATIVE ONLY
AND ARE NOT THE RESULT OF ANY IN-DEPTH
INVESTIGATIONS.
AGBAADCREVISIONS FOLLOWING ECI & DQW08/02/19A
PROPOSED GRANITE TRANSITION KERB
(150MM WIDE)
PROPOSED GRANITE FLUSH KERB
(150MM WIDE)
EXISTING KERB TO BE REMOVED
EXISTING BOLLARD TO BE REMOVED
EXISTING CENTRAL ISLAND BEACON TO BE
DISCONNECTED AND REMOVED
PROPOSED BENCH
LEGEND (CONTINUATION):
RS
PS
LC
P
BB
BO
RS
LC
AGBHMCDCREVISIONS FOLLOWING RSA COMMENTS18/04/19B
DENMARK H
ILL
S
U
N
R
A
Y
A
V
E
N
U
E
INSET A
KEY
AGBAACMNO CHANGES12/07/19C
N
F
E
R
N
D
E
N
E
R
O
A
D
DENMARK HILL
DENMARK HILL
3.1
4.0
3.2
3.2
3.3
3.2
3.2
4.5
3.5
3.2
3.0
3.2
REMOVE SIGN 543, ASSOCIATED
SUPPLEMENTARY PLATE AND POST.
3.9
3.4
3.2
CO
NT
IN
UA
TIO
N - R
EF
ER
T
O L
AY
OU
T D
CO
NT
IN
UA
TIO
N - R
EF
ER
T
O L
AY
OU
T B
REMOVE SIGN 959
FROM LAMP COLUMN.
EXISTING CHUTE GULLY REPLACED WITH NEW
GULLY POT AND CYCLE-FRIENDLY COVER.
PROPOSED CONNECTION DIRECTLY INTO EXISTING
PIPE RUN AND EXISTING MANHOLE BACKFILLED.
DRAINAGE SURVEY TO DETERMINE DETAILS.
MOUNT NEW SIGN 959
ON EXISTING LAMP
COLUMN. SIGN TO BE
OFFSET AWAY FROM
CARRIAGEWAY.
MOUNT EXISTING SIGN 959 ON NEW
OFFSET BRACKET ON EXISTING
LAMP COLUMN. SIGN TO BE OFFSET
AWAY FROM CARRIAGEWAY.
TREE TO BE ASSESSED AND
REMEDIED AS APPROPRIATE IN
COORDINATE WITH LB LAMBETH.
3.0
AG
AG
EG
EG
AG
BUS SHELTER
BUS SHELTER
LC
LC
LC
LC
LC
LC
LC
EG
RS
RS
PG
PS
PS
DEN
MAR
K HILL
C
H
A
M
P
I
O
N
H
I
L
L
3
.
7
1
.
9
4
.
9
3
.
2
N
3
.2
2
.0
CO
NT
IN
UA
TIO
N - R
EF
ER
T
O L
AY
OU
T C
S
C
H
E
M
E
E
X
T
E
N
T
D
E
N
M
A
R
K
H
I
L
L
6
.
2
2.4
3.4
3.4
4.5
3
.
0
BUS LANE WIDENED TO 4.5m
FOR UPHILL CYCLISTS AND
REDUCE IMPACT OF TREES
REMOVE CENTRAL RESERVATION AND
LIGHTING COLUMN TO PROVIDE
ADDITIONAL WIDTH TO BUS LANE.
RESURFACING REQUIRED TO TIE IN
CARRIAGEWAY LEVELS AT THE CROWN.
OVERGROWN VEGETATION TO BE
CUT BACK TO INCREASE USABLE
WIDTH OF BUS LANE
REPLACE EXISTING STAGGERED CROSSING
WITH PROPOSED RAISED TABLE AND NEW
UNCONTROLLED CROSSING.
IMPROVED PEDESTRIAN ISLAND REALIGNED
TO SUIT ENHANCED CROSSING.
EXTEND LOW
LEVEL PLANTING
RECONSTRUCT FOOTWAY TO
IMPROVE FOOTWAY SURFACE
AND REMOVE PEDESTRIAN
GUARDRAIL.
REMOVE SIGN
959 AND POST
INVESTIGATION IN TO DRAINAGE
REQUIREMENTS TO BE UNDERTAKEN
AS PART OF DETAIL DESIGN PHASE.
DRAINAGE SURVEY COMPLETED.
6
.0
BO
A
G
LC
BO
BOBO
BO
BO
A
G
P
G
AG
AG
A
G
LC
LC
BO
LC
RG
LC
P
B
LC
LC
LC
LC
LC
LC
RS
BO
R
G
3.2
3
.8
3
.2
POTENTIAL LOW
LEVEL PLANTING
A'
A
B
'
B
C
'
C
N
C
D
PROPOSED
LEVEL (m)
EXISTING
LEVEL (m)
A
A'
NO
RT
HB
OU
ND
CA
RR
IA
GE
WA
Y
CH
AN
NE
L
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
EX
IS
TIN
G T
OP
O
F
IS
LA
ND
2.94
32
.2
3
32
.3
2
1:14
1:14
1:18
1:19
1:18
3.78
31
.7
5
0.89
31
.9
6
32
.1
6
32
.3
5
32
.2
3
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
32
.1
7
31
.9
6
31
.7
5
PROPOSED
LEVEL (m)
EXISTING
LEVEL (m)
B
B'
NO
RT
HB
OU
ND
CA
RR
IA
GE
WA
Y
CH
AN
NE
L
2.37
30
.3
5
1:60
1:60
1:13
1:12
1:13
3.10
29
.9
7
29
.9
1
30
.0
6
30
.4
7
30
.4
6
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
29
.8
0
30
.4
7
30
.6
3
30
.7
0
30
.7
2
30
.9
4
29
.9
7
29
.8
5
30
.0
9
29
.8
5
BA
CK
O
F F
OO
TW
AY
TO
P O
F K
ER
B
EX
IS
TIN
G IS
LA
ND
KE
RB
EX
IS
TIN
G IS
LA
ND
KE
RB
30
.4
1
30
.5
3
30
.7
0
30
.8
0
30
.8
0
30
.9
4
3.62 2.20 3.47 1.96 1.38
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
SO
UT
HB
OU
ND
CA
RR
IA
GE
WA
Y
CH
AN
NE
L
TO
P O
F K
ER
B
BA
CK
O
F F
OO
TW
AY
1:13
1:18
1:17
1:20
1:22
1:20
1:28
1:12
1:12
PROPOSED
LEVEL (m)
EXISTING
LEVEL (m)
C
C'
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
NO
RT
HB
OU
ND
CA
RR
IA
GE
WA
Y
EX
IS
TIN
G T
OP
O
F
IS
LA
ND
3.61
29
.0
2
1:18
1:28
1:18
1:10
1:18
1.74
28
.4
7
3.85
28
.6
0
28
.7
9
29
.0
2
EX
IS
TIN
G IS
LA
ND
CH
AN
NE
L
28
.8
1
28
.5
1
SO
UT
HB
OU
ND
CA
RR
IA
GE
WA
Y
28
.8
9
28
.7
2
CH
AN
NE
L
32
.4
4
32
.5
5
1:28
1:18
SO
UT
HB
OU
ND
CA
RR
IA
GE
WA
Y
1:30
32
.4
4
32
.5
5
3.70 3.12
1:18
1:28
CH
AN
NE
L2
8.3
4
1.883.05
CH
AN
NE
L
1:24
1:17
1:47
29
.0
62
9.0
6
28
.3
4
1:18
1:47
28
.7
0
29
.9
3
TA
CT
IL
E F
OL
DL
IN
E
1:15
1.20
TA
CT
IL
E F
OL
DL
IN
E
30
.9
0
1:35
1.20
RS
LEGEND
160 TOOLEY STREET LONDON SE1P 5LX
REV DATE REVISION DESCRIPTION / DETAILS
DRN
BY
CHKD
BY
APRVD
BY
PROJECT:
TITLE:
CONTRACT NO:
SCALE:
DRAWING NO:
DATE DRAWN:
PURPOSE:
DRAWN
DESIGNED
CHECKED
APPROVED
DATE ISSUED:
REV:
BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2018. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.
IS
O F
ULL B
LE
ED
A
3 420 X
297 M
MY
:\C
0488 R
MP
441 D
EN
MA
RK
H
ILL\50 C
AD
\20 S
HE
ET
S\C
0488-S
HE
-20-0.D
WG
RMP440/441: Denmark Hill
between Sunray Avenue and Champion Hill
OUTLINE DESIGN
SHEET 2 OF 2
CM
CM
HMC
AGB
12/07/2019APRIL 2019
60493382-C0488-OD-02
FOR APPROVAL1 : 500 @ A3
C
60493382-C0488
NOTES
1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LB
SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND
ALL RELEVANT CONTRACT CLAUSES.
3. TOPOGRAPHICAL SURVEY COMPLETED IN JANUARY 2018
AND FEBRUARY 2019 BY PREMIER SURVEYS.
4. LOCATIONS OF PROPOSED GULLIES ARE INDICATIVE ONLY
AND ARE NOT THE RESULT OF ANY IN-DEPTH
INVESTIGATIONS.
5. ALL PEDESTRIAN GUARD RAILS TO BE REMOVED (SUBJECT
TO GRAF ASSESSMENT FINDINGS).
LAYOUT C
LAYOUT D
AGBAADCFIRST ISSUE14/01/190
LOCATION PLAN
BUILDABILITY NOTE: LANE CLOSURES WILL BE REQUIRED TO UNDERTAKE
THE RAISED TABLE CONSTRUCTION WORKS AFFECTING ACCESS ROUTE TO
HOSPITAL.
LC
UP TO 40MM ASPHALT CARRIAGEWAY
RESURFACING
UP TO 100MM ASPHALT CARRIAGEWAY
RESURFACING
ASPHALT CARRIAGEWAY REINSTATEMENT
FOOTWAY RECONSTRUCTION
(CONCRETE SLABS)
PROPOSED ANTI-SHIFT TABLE (ASPHALT RAMPS)
EXISTING COVER (UNAFFECTED)
EXISTING UTILITY COVERS TO BE ADJUSTED TO
NEW FOOTWAY / CARRIAGEWAY LEVEL
EXISTING LAMP COLUMN TO REMAIN
EXISTING LAMP COLUMN TO BE DISCONNECTED
AND REMOVED
PROPOSED LAMP COLUMN
PROPOSED SIGN ON EXISTING LAMP COLUMN
REMOVE POST AND SIGN
REMOVE SIGN FROM EXISTING LAMP COLUMN
EXISTING BUS SHELTER TO REMAIN
PROPOSED LOW LEVEL PLANTING
PROPOSED ROAD MARKINGS
EXISTING ROAD MARKINGS TO REMAIN
PROPOSED BENCH
BUS SHELTER
KEY
LC
LC
EXISTING ROAD MARKINGS TO BE REMOVED
EXISTING KERB TO BE REMOVED
PROPOSED GRANITE FULL HEIGHT KERB
(150MM WIDE)
PROPOSED GRANITE FULL HEIGHT KERB
(300MM WIDE)
PROPOSED GRANITE TRANSITION KERB
(150MM WIDE)
PROPOSED GRANITE FLUSH KERB
(150MM WIDE)
LEGEND (CONTINUATION):
RG
AG
PG
BO
BO
SECTION A SECTION B
SECTION C
EXISTING GUARDRAIL TO BE REMOVED
EXISTING GULLY TO BE REMOVED
EXISTING GULLY COVER TO BE REPLACED WITH
CYCLE-FRIENDLY COVER
PROPOSED CYCLE-FRIENDLY GULLY
EXISTING BOLLARD TO BE REMOVED
PROPOSED NEW "KEEP LEFT" BOLLARD
PROPOSED NEW BLISTER TACTILE PAVING
KEY KEY
AGBAADCREVISIONS FOLLOWING ECI & DQW08/02/19A
RS
PS
LC
LC
AGBHMCDCREVISIONS FOLLOWING RSA COMMENTS18/04/19B
AGBAACMREVISIONS TO LANE WIDTHS IN LAYOUT D12/07/19C
Top Related