Client logo Client logo

Slauson Ave Bridge over San Gabriel RiverModifications for addition of third rail- Constructability Review Benefits -

Presented By: Robert Fish, PE, SE

Special thank to:CaltransBNSF RailwayHansen and WilsonCounty of Los Angeles

September 9, 2015

PRACTICAL SOLUTIONS TOBRIDGE ENGINEERING CHALLENGES

Page 2: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Modification Locations

Page 3: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Modifications to Piers andAbutment Embankment

Page 4: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Project Timeline

1995 - Seismic Retrofit (pending construction)

1995

2003 - 2013Third Rail Project

2003 Initial Design

2005Constructability

Review

2007Revised Design

2013Construction Completed

20132003

Page 5: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 - Constructability ReviewOriginal Concept

Demolition Construction

Revised ConceptDemolition Construction

Page 6: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Original Steel Cap Beam

Page 7: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Original Steel Cap Beam

Page 8: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Original Steel Cap BeamGirder Pedestals – 8 each side of cap

Page 9: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

New Cap Beam Installed(existing deck steel inadvertently removed)

Page 10: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 - Removal of Steel Bent Cap

Page 11: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Bent 6 Steal Cap Beam(initial replacement details)

4,000 1” HS Bolts150 hrs. of labor

Page 12: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Preparing for Installation of New Steal Cap Beam

Page 13: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Bent 6 Replacement of Steel Cap BeamDuring Single Night Closure

Page 14: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Deck Closure (Drill and epoxy bond new bars)

.

.

.

1.5" +/- cover

Drill and epoxy bond #6galvanized dowel @ 6" c-c into 11" deep hole. Use Simpson SET epoxy. Prebend bar or bend into closure pour after epoxy is fully cured.Alternative: use 3/4" diameter HS rod, Fy = 60ksi min.

3.5" to centerof drilled hole0 degrees min. to 7 degrees max.

12

1

23

3 #5 @ 12" per project plans

Roughen face of existing deck to 1/4" min. amplitude.

If directed by the Engineer, sawcut 1/4"+/-"V" groove after closure pour concrete has cured.

4

4

Closure pour concrete, see Submittal 16.

5

5

6New transvers reinforcement not shown, see project plans.

6

Exist. reinforcement. Do not cut.

Light blue background is from as-built plans.

Ignore.

Page 15: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Closure Pour Completed(including restored sidewalks and railing)

Page 16: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – New Steel Cap Beam in Place

Page 17: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Bent 6 New Steel Cap Beam withSeismic Isolation Bearings, Cap to Girder Struts for

Stabilization, End of Cap Beam “X” Stiffeners for Rotation Reduction

Struts

“X” Stiffeners

Seismic Isolation Bearings

Page 18: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Struts used for Stability(locking west side girders to cap +reducing rotation along cap axis)

Page 19: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Struts used for Stability(locking west side girders to cap +reducing rotation along cap axis)

Page 20: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6 – Struts used for Stability(locking west side girders to cap +reducing rotation along cap axis)

Page 21: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Steel angle bracing, connecting girder and cap beam flanges, both top and bottom.

Pier 6 – Original Plan for Stability(Lateral cross bracing top and bottom)

Page 22: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

O.W.Blodgett“X” Stiffeners to Reduce Axial Rotation

Page 23: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 6“X” Stiffeners to Reduce Axial Rotation

Reduced rotation from 6.0 Degrees to 0.5 Degree at maximum EQ force delivered from Bearing

Page 24: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

0

0.2

0.4

0.6

0.8

1

1.2

1.4

0 1 2 3 4 5Period (seconds)

AR

S (g

)

20% Damping5% Damping

Period Shift

Damping Shift

Total Seismic Demand

Reduction

Seismic Isolation BearingBenefits in Reducing Seismic Demand

Page 25: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Seismic Isolation Bearing

Friction Pendulum Type -disassembled to show inner

Concave Slider Bearing

Lead Core Elastomeric Type Cross section to show

inner lead core

Page 26: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Seismic Isolation BearingLead Core Rubber

Page 27: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

PTFE Bearings (Supporting girder ends on new steel cap)

12 inch longitudinal movement capacity

Page 28: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

PTFE Bearings (Supporting girder ends on new steel cap)

12 inch longitudinal movement capacity

PL 1-3/4" x 9" x 1'-3"Spacer Plate

Page 29: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

PTFE Bearings (Supporting girder ends on new steel cap)

Page 30: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Existing External Cap to be Replaced by Cantilevered Internal Cap

Page 31: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 - Constructability Review

Original ConceptConstruction

Revised ConceptConstruction

Page 32: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Existing External Cap to be Replaced by Cantilevered Internal Cap

Page 33: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Bent 7 Replace External Cap w/ Internal Cap(initial replacement details)

Page 34: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Bent 7 Replace External Cap w/ Internal Cap(initial replacement details)

2,500 1” HS Bolts95 hrs. of

labor

Page 35: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – New Internal Bent Cap(Drilled holes through steel girder webs for HS rod placement)

Page 36: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 - Continuous HS rods (installed through all 8 steel girders)

Page 37: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – Transfer Reinforcement(to transfer girder forces into new cap Beam)

• Exist Steel Girders

• New Internal Concrete Cap Beam

• “Hanger” Steel to Transfer Girder Vertical Forces into New Cap Beam

Page 38: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 - Continuous HS rods (Ends – crossing with vertical hold down strut)

Page 39: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – Pipe piles(Extended into footing for full fixity)

Page 40: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – Tie down anchors(Effective continuation of vertical tension strut - HS rods -

from new internal cap beam)

First tendon being lowered into steel casing

Page 41: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 - Pipe Pile Foundation Designed to ResistLateral Spreading Forces

Including Protection of Tie-Down Anchors

Page 42: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – Highly reinforced

Page 43: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – nearly complete(Half of original 2 column Pier used for temporary

construction support)

• Camber Strip

• Initial + Long Term DL Deflection

Page 44: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Pier 7 – complete( 32 foot cantilever)

Page 45: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Original Concept Revised Concept

Cost (of Construction) $6.4 million $3.4 million

Risk (to cost & schedule) High Low

Safety (during construction) Of higher concern Improved - Reduced hours worked over highly active rails

Performance (life cycle) High maintenance Reduced maintenance

Architecture (“cleaner look”) Looks like a modification

Cleaner Look - Looks less like a modification

Summary

Page 46: Slauson Ave Bridge over San Gabriel River …...Client logo Client logo Slauson Ave Bridge over San Gabriel River Modifications for addition of third rail-Constructability Review Benefits

Client logo Client logo

Slauson Ave Bridge over San Gabriel RiverModifications for addition of third rail

- Constructability Review Benefits -

September 9, 2015

PRACTICAL SOLUTIONS TOBRIDGE ENGINEERING CHALLENGES

Thank YouBob Fish, PE, SE

[email protected](916) 903-8716