Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
SIX MONTHLY COMPLIANCE
REPORT
JUNE- 2015
Group Housing Complex
“Mahagunpuram”
AT
VILLAGE – Mehrauli, Dasna, Ghaziabad, U.P.
Being developed by
M/s Mahagun Real Estate Pvt. Ltd.
B-66, First Floor, Vivek Vihar, Delhi-110049
Prepared by
M/s Perfact Services
(ISO9001:2008& ISO14001:2004 Certified)
501-507, 5th Floor, NN Mall,
Mangalam Palace, Sector 3 Rohini, New Delhi
Ph No. 47528467, Fax No. 47528434
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
List of Annexure
Annexure Details
Annexure -I Copy of Granted Environmental Clearance
Annexure – II Copy of CTE
Annexure - III Monitoring reports of Air, Water , Soil, Noise & Stack
Annexure - IV Health Certificates of few workers engaged during
construction work
Annexure - V PUC certificates of few Vehicles Hired for Construction
Annexure - VI Copy of Height Clearance from AAI
Annexure - VII Site Photographs
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
1. Introduction:-
The Group Housing Complex “Mahagunpuram” is located at Village Mehrauli, Dasna, Ghaziabad,
U.P. and being developed by M/s Mahagun Real Estate Pvt. Ltd.
Name of the project Group Housing Complex
“Mahagunpuram”
Site address Village Mehrauli, Dasna, Ghaziabad, U.P
Developed By M/s Mahagun Real Estate Pvt. Ltd.
Environment Clearance Letter No 228/ SEAC/ 333/ 2009/TA(J) dated 12 .02
2010.
Period of Compliance Six monthly compliance: Period October -
2014 to March - 2015, Submission due in
June-2015
Project Description Project involves the construction of Group
Housing Complex “Mahagunpuram” on a
plot area of 54630 Sqm. Built up area of the
project is 116511.74 Sqm.
Construction Status Construction of phase I Completed,
Construction of phase- II is under
construction.
Proposed Year of Commencement 2009
Proposed year of completion 2016
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
1. Project Description
The Group Housing Complex “Mahagunpuram” will have the following salient features: -
Particular s Details
Total Plot Area 54630 m2
Built up Area
(FAR + Basement area )
116511.74 m2
FAR 90311.74 m2
Green Area 13494.86 m2
No. of Basement 1
No. of Floors G+ 14
No. of Blocks 11
Total Accommodation 5220 person
Height of Building 49.25 m
Parking space proposed 1326 ECS
Cost of the project Rs. 120 Crores
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
3. Construction Progress Status:
S No.
Component Percentage of Work Done ( June-2015)
1 Civil Construction (Structural Work, Brick Work & Plaster Work)
Structural Work : 98%;
Brick Work: 92%
Plaster Work: 66%
2 Plumbing
66% work completed.
3 Electrical work
82% work completed.
4 Fire Fighting
47% work completed.
5 Sewage Treatment Plant
Completed
6 Rain Water Harvesting
60% work completed.
7 Sewerage, Drainage etc
40% work completed.
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
4. Current Status of point – wise compliance of the stipulated environmental conditions/ safeguards.
CONSTRUCTION PHASE
S.No General Conditions Reply
1. It shall be ensured that all standards
related to ambient environmental
quality and the emission/ effluent
standards as prescribed by the MOEF
are strictly compiled with.
Standards related to ambient
environment quality & emission /
effluent standards prescribed by the
MOEF are being complied.
Test results are enclosed as Annexure
III.
2. A suitable plan for providing shelter,
light and fuel, water and waste disposal
for construction labour during the
construction phase shall be provided
along with the number of proposed
workers.
Local workers have been engaged. No
worker allowed to stay at project site
during night time. Necessary basic
facilities like temporary toilet, and
wash area have been provided
throughout the construction phase for
construction workers.
3. Obtain proper permission from
competent authorities regarding
enhanced traffic during and due to
construction and operation of project.
Necessary permission from competent
authorities shall be taken regarding
enhanced traffic during and due to
construction and operation of project,
if required.
Traffic circulation Plan in this regard
has already submitted.
4. Obtain necessary clearances from the
competent authority on the abstraction
and use of ground water during the
construction and operation phases.
We are not using ground water during
construction phase, hence clearance is
not required. Tanker supply water is
being used for construction work
purpose.
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
5. Hazardous/inflammable/ Explosive
materials likely to be stored during the
construction and operation phases shall
be as per standard procedure as
prescribed under law, Necessary
clearances in this regards shall be
obtained.
Only hazardous waste generated
during construction phase is used oil
from D.G sets which is being stored in
leak proof containers and shall be
given to approved recycler.
6. Suitable rainwater harvesting systems
as per designs of groundwater
department shall be installed. Complete
proposals in this regard should be
submitted.
Rainwater harvesting & Ground water
recharging shall be done. Oil & Grease
trap to remove oil & Grease from the
surface runoff shall be provided.
7. The emissions and effluents etc. from
machines, Instruments and transport
during construction and operation
phases should be according to the
prescribed standards. Necessary plans
in this regard shall be submitted.
Necessary care is being taken to
control emissions & effluents etc from
machines instruments & transport
during construction phase & will be
taken during operation phase also.
Covered transportation of material is
being practiced.
8. Water sprinklers and other dust control
measures should be undertaken to take
care of dust generated during the
construction and operation phases.
Necessary plans in this regard shall be
submitted.
Dust control measures are being
adopted to take care of dust generated
during the construction phase. Water
sprinkling is being done on regular
basis.
Construction material stored at site is
being covered with the cloth/plastic
sheet to avoid the dust emission.
9. Suitable noise abatement measures shall
be adopted during the construction and
operation phases in order to ensure that
the noise emissions do not violate the
prescribed ambient noise standards.
Adequate noise abatement measures
are being adopted .The DG sets used
during construction phase are brought
acoustically enclosed according to
Central Pollution Control Board
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
Necessary plans in this regard shall be
submitted.
norms. D.G sets during operation
phase will be also kept acoustically
enclosed.
10. Separate stockpiles shall be maintained
for excavated topsoil and the topsoil
should be utilized for preparation of
green belt.
Excavated soil has been excavated
during construction phase and same
has been stored separately under
tarpaulin cover & Excavated soil is
being used in the backfilling and top
fertile soil shall be used for
development of the horticulture/
landscape at site.
11. Sewage effluents shall be kept separate
from rainwater collection and storage
system and separately disposed. Other
effluents should not be allowed to mix
with domestic effluents.
Separate lines shall be laid down for
sewage effluents & carrying storm
water. No other effluent shall be
allowed to mix with Domestic effluent.
12. Hazardous/ Solid wastes generated
during construction and operation
phases should be disposed off as
prescribed under law. Necessary
clearances in this regard shall be
obtained.
No hazardous waste is being generated
during construction phase. Only lesser
amount of used oil from D.G Sets is
generated and same shall be disposed
off through approved recycler.
13. Pavements shall be so constructed as to
allow infiltration of surface run-off of
rain water. Fully impermeable
pavements shall not be constructed.
Construction of pavements around trees
shall be as per scientifically accepted
principles in order to provide suitable
watering, aeration and nutrition to the
tree.
Pavements shall be constructed so as
to allow infiltration of surface run off
of rainwater. All the necessary care
shall be taken.
14. Compliance with the safety procedures, We are complying with all safety
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
norms and guidelines as outlined in
National Building Code 2005 shall be
compulsorily ensured.
procedures norms & and guidelines as
per National Building Code 2005.
Safety slogans and hoardings have
been provided at the site.
15. Ensure use of measures for reducing
water demand for landscaping and
using xeriscaping, efficient irrigation
equipments & controlled watering
systems.
Necessary measures have been taken
to reduce the water demand during
construction phase.
16. Educate citizens and other stake-holders
by putting up hoardings at different
places to create environmental
awareness.
Necessary hoardings have been
provided at different places to create
environmental awareness and workers
safety.
17. Traffic congestion near the entry and
exit points from the roads adjoining the
proposed project site must be avoided.
Parking should be fully internalized and
no public space should be utilized.
Proper measure like road width, entry
width etc has been taken care, so that
there is no Traffic congestion near the
entry and exit points from the roads
adjoining the project site. Parking
shall be fully internalized and no
public space shall be utilized.
Movement of vehicles is being carried
out during non peak hour.
18. Fly ash should be used as building
material in the construction as per the
provision of fly ash notification of
September, 1999 and amended as on
August, 2003 (The above condition is
applicable only if the project lies within
100 km of Thermal Power Station).
Fly ash blocks shall be used in the
construction of pathways and
boundary walls as per the provisions
of Fly ash Notification of September,
1999 and amended as on 27th August,
2003.
19. The DG sets to be used during
construction phase should use low
sulphur diesel type and should conform
Acoustically enclosed DG set of 1x30
KVA, 1x180 KVA & 1x125 KVA
capacity have been installed during
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
to E.P. rules prescribed for air and noise
emission standards.
construction phase which use low
sulphur diesel and conforms to E.P.
rules prescribed for air and noise
emission standards.
20. The green belt design along the
periphery of the plot shall achieve
attenuation factor conforming to the day
and night noise standards prescribed for
residential land use. The open spaces
inside the plot should be suitably
landscaped and covered with vegetation
of indigenous variety.
Green area of 13494.86 m2 is under
development in and around the
complex. The open spaces inside the
plot shall be suitably landscaped and
covered with vegetation of indigenous
variety.
Landscape plan in this regard has
already submitted.
21. The construction of the building and the
consequent increased traffic load should
be such that the microclimate of the
area is not adversely affected.
All adequate measures have been
taken to ensure that microclimate of
the area is not adversely affected.
22. The building should be designed so as
to take sufficient safeguards regarding
seismic zone sensitivity.
Adequate measures have been taken
for structural stability of the building
for seismic zone sensitivity.
23. It is suggested that literacy program for
weaker sections of society/ women/
adults (including domestic help) and
under privileged children could be
provided in a formal way.
We shall have literacy program for
weaker section of society / Women
/adults & under privileged children in
a formal way.
24. Treated effluents shall be maximally
reused to aim for zero discharge. Where
ever not possible, a detailed
management plan for disposal should be
provided with quantities and quality of
waste water.
Treated effluents shall be maximally
reused to aim for zero discharge.
25. Construction activities including
movements of vehicles should be so
Necessary cares have been taken to
ensure that no disturbance is caused to
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
managed so that no disturbance is
caused to nearby residents.
nearby residents.
26. Parking areas should be in accordance
with the norms of MOEF, Government
of India. Plans may be drawn up
accordingly and submitted.
Parking area to be provided is in
accordance with the norms of MOEF,
GOI.
27. The location of the STP should be such
that it is away from human habilitation
and does not cause problem of odor.
Odorless technology options should be
examined and a report submitted.
STP will be located in the basement of
the building isolated place away from
human habilitation, hence no odour
problem is expected.
28. The Environment Management plan
should also include the break up costs
on various activities and the
management issues also so that the
residents also participate in the
implementation of the environment
management plan.
Environment Management plan
including break up costs on various
activities has already submitted.
29. Detailed plans for safe disposal of STP
sludge shall be provided along with
ultimate disposal location, quantitative
estimates and measures proposed.
STP Sludge shall be used as manure
and rest of unused manure shall be
given to nursery.
30. Status of the project as on date shall be
submitted along with photographs from
North, South, West and East side facing
camera and adjoining areas should be
provided.
Photographs showing the status of the
construction and compliance is
enclosed as Annexure VII
31. The DG sets shall be so installed so as
to conform to prescribed stack heights
and regulations and also to the noise
standards as prescribed. Details should
be submitted.
Acoustically enclosed D.G Sets have
been installed with adequate stack
height as per norms for construction
purpose.
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
32. Dispensary for first aid shall be
provided.
First aid facility has been provided
during construction phase.
Regular Health checkup of workers is
being done. Medical certificate of few
workers is enclosed as Annexure IV
33. Ground Water downstream of Rain
Water Harvesting pit nearest to STP
should be monitored for bacterial
contamination. Necessary Hand Pumps
should be provided for sampling. The
monitoring is to be done in pre and post
monsoon, seasons.
Necessary monitoring shall be done.
34. The green belt shall consist of 50%
trees, 25% shrubs and 25% grass as per
MOEF norms.
Proper Green area is being maintained
as per MoEF norms.
SPECIFIC CONDITIONS
1. The STP should be redesigned and
water balance should be submitted
based on 86 LPCD. Treated effluents
shall not be disposed into public sewer
or community STP. The treated water
should be 100% utilized for the
gardening.
Treated effluent shall be reused for
flushing, cooling and horticulture
purpose within the complex after its
operation.
2. Quantity of water required for flushing
HVAC/ DG sets, horticulture, washing
etc. within the project should only be
sent for treatment to STP i.e. to be
reused completely within the premises.
The surplus should be directed to public
sewer for treatment in the STP of the
Gaziabad Development Authority.
Permission of the Gaziabad
We will comply with the requirement.
Waste water shall be treated in Sewage
Treatment Plant and same recycled
water shall be reused within the
complex.
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
Development Authority shall be taken
with reference to the quality and quality
of the sewage to be sent to public
sewage system for treatment.
3. Parking space should be calculated @
35, 30 and 25 sq. m per ECS for
basement, stilt and surface parking
respectively.
Noted. Parking space is calculated
accordingly
4. It shall be ensured that all street and
park lightening is 100% solar powered.
We will comply. Provision for Solar
lights shall be made
5. A separate escrow account shall be
opened for operation and maintenance
as per proposed EMP.
We will comply.
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-I
COPY OF ENVIRONMENTAL CLEARANCE
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
Annexure – II
Copy of Consent to Establish
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-III
MONITORING REPORTS OF AIR, WATER, SOIL, NOISE & STACK
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-IV
HEALTH CERTIFICATES OF FEW WORKERS ENGAGED FOR CONSTRUCTION
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-V
PUC CERTIFICATES OF FEW VEHICLES HIRED FOR CONSTRUCTION
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-VI
COPY OF HEIGHT CLEARANCE FROM AAI
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
ANNEXURE-VII
Site photographs
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd
Top Related