1 M/s AL Sameer Exports Pvt. Ltd. Meerut. 46,350 MT per year capacity Meat Processing
unit at Araria/Kishanganj or Bhagalpur
26.6235 426 13-Aug-12 - -
2 M/s A.B.Z. Agro Foods Pvt. Ltd., New Delhi Proposal for establishment of 23000 MT per
year capacity Buffalo Meat Producation and
Processing unit at Raipur and Lodhabari,
Pothia Kishanganj.
17.3 175 08-Feb-13 - -
3 M/s Shree Milk and Food Industries Ltd. Kolkata Proposal for establishment of 6200 MT per
yearcapacity Milk Processing unit at Bankat,
Motihari
28.98 120 02-Jan-13 - -
4 M/S Mithla Dairy Pvt. Ltd., Mumbai. Proposal for establishment of 35,000 Litres per
day capacity of Milk Processing unit at
Industrial Area, Pandaul, Madhubani.
5.01 50 28-Sep-11 - -
5 M/s Simanchal Dairy Pvt. Ltd. Kishanganj Proposal for establishment of 3,60,000 Litres
per year capacity Milk Processing unit at
Dharmganj, Kishanganj.
1.413 37 02-Jan-13 - -
6 M/S Sai Dairy, Purnea. Proposal for establishment of 8,64,000 Liters
per year capacity Pasteurized Milk and
Toned/Double Toned Milk and 74,520 Kg per
year capacity Ghee and Milk Cream unit in
proprietorship at Industrial Gr
0.479 18 27-Jul-11 - -
7 M/s Purnea Dairy Darjeeling, West Bengal Proposal for establishment of 3420 Kilo litre
per year capacity milk curd and Lassi unit in
proprietorship at Moria Sadar, Purnea.
1.2019 25 02-Jan-13 - -
8 M/s Rathi Hatcheries Pvt. Ltd., Haryana. Proposal for establishment of 252 Lac pieces
per year capacity Chicksa Production unit at
Maranga Industrial Area, Purnea.
4.1247 30 13-Mar-13 - -
9 M/S SVJ Enterprises Pvt. Ltd, Donar, Darbhanga. Establishment of 1(one) MT per day capacity
Honey Processing unit at Donar, Dist.-
Darbhanga
1.236 22 30-Nov-09 21-Dec-10
10 M/S D.K. Agro Products, Turki, Muzaffarpur. Establishment of 60 Lakh Liter per year
capacity Milk Processing Plant at Turki,
Muzaffarpur.
2.15 80 16-Nov-09 - -
11 M/S Inspiring Agro Ltd., West Bengal Proposal for establishment of 100800 Eggs per
day capacity Fully Automation Commercial Egg
production unit and 80 KWH Power Plant at
Mahuabari, Jiradei, Siwan.
17.9506 50 23-Feb-12 - -
12 M/S Mirzanagar Gramodyog Sahyog Samiti Ltd, Hajipur. Establishment of Honey Processing and
Packaging Plant at Mahua, Hajipur.
1.166 14 23-Nov-09 25-May-10
13 M/S Golden Dairy Products Pvt. Ltd, Patna. Proposal for establishment of Ice-cream and
Dairy Products unit at Industrial Area, Hajipur.
1.96 37 21-Dec-09 - -
14 M/S Anuj Dairy Pvt. Ltd, Patna Proposal for production of 5475 MT per year
capacity Milk Powder and 255.5 MT per year
capacity Butter or 164.25 MT per year capacity
Ghee at Industrial Area, Hajipur.
10 80 26-May-11 - -
15 M/S Aasma Foods and Beverages Pvt. Ltd., Hajipur(Vaishali). Proposal for establishment of 11442 MT per
year capacity Milk Processing unit at E.P.I.P.,
Hajipur(Vaishali).
12.2162 107 23-Feb-12 - -
16 M/S Aneja Food Products India Pvt. Ltd., Patna. Proposal for establishment of 05 Lakh Litre per
day capacity Milk Powder, Pasteurized Milk,
Butter, Ghee and Curd production unit at
Parmanandpur, Lalganj, Vaishali.
17.2345 400 23-Feb-12 - -
17 M/S N.V.S. Industries, Patna. Proposal for establishment of 70 pieces per
year capacity Plant -Machinery and Equipment
production unit for Dairy and Food Processing
Industries in proprietorship at E.P.I.P., Hajipur
(Vaishali).
0.9232 17 23-Feb-12 - -
18 M/S Parwati Hatcheries, Vaishali. Proposal for capacity expansion from 96000
pieces per year capacity to 28,80,000 pieces
per year capacity in the existing Egg Hatchery
unit under proprietorship at Industrial Area,
Hajipur, Vaishali.
0.7955 7 09-Apr-12 - -
19 M/S Uttri Bihar Milk Food Company Pvt. Ltd., Begusarai
(Amending the earlier proposal approved in SIPB meeting on
23.03.10 for the production of 30,140 MT per year capacity
Pasteurized Milk, Chhena, C
Proposal for production of 30,000 MT capacity
Pasteurized Milk, Chhena, Curd, Paneer, Milk
Cake and Khoa at Ajnul, Dalsingsarai,
Samastipur.
1.0918 102 26-May-11 16-Aug-11
Categorywise SIPB Approval Report
Category - Animal & Food Products of animal origin
1
20 M/S Good Health Dairy Products Pvt. Ltd, Kolkata. Proposal for establishment of 3,65,00000 Liters
per year capacity Milk Chilling Plant at
Industrial Area, Samastipur.
0.8 25 27-Jul-11 - -
21 M/s Shiv Shakti Hatchery Pvt. Ltd., Vaishali Proposal for establishment of 25,,71,400 pieces
per year (Birds) capacity Hatchery unit at
Industrial Estate Samastipur.
1.0511 10 02-Jan-13 - -
22 M/S Maa Jaemangla Dairy Clusters Ltd., Kolkata. (Earlier, in
the SIPB meeting held on 19.10.09 consent was given in the
name of M/S Prashant Jalan & Associates, Kolkata for
establishment of 100 MT
Proposal for establishment of 44,000 MT per
year capacity Ghee, Skimmed Milk Powder,
Concentrated Milk, Pasteurized Poly Pack Milk,
Curd/Yoghurt at Mohanpur, Begusarai.
38.61 47 28-Sep-11 - -
23 M/S Ganga Dairy Ltd, Begusarai Proposal for Capacity Expansion from 10 MT
per day to 40 MT per day in the existing Milk
Processing unit at Begusarai.
10.3 65 08-Jun-10 21-May-11
24 M/S Mrigendra Cold Storage Pvt. Ltd., Begusarai. Proposal for establishment of 50,000 Litre per
day capacity of Milk Processing unit at
Rajwara, Begusarai.
2.873 30 28-Sep-11 - -
25 M/S ITC Limited, Indian Tobacco Division, P.O- Basdeopur
Munger(Bihar)-811202
Establishment of Milk Processing Plant at
Sitakund, Munger
100.9 140 14-Aug-08 - -
26 M/S Great Value Foods, New Delhi Establishment of 60,000 MT per year capacity
RTE(Ready to eat) Supplementary Nutrition
Fortified Food unit in Bihar.
16.2903 179 07-Dec-09 - -
27 M/S Naturals Dairy Pvt. Ltd., Patna. Proposal for establishment of 75000 Litres per
year capacity Milk Processing and Packaging
unit at Patliputra Industrial Area, Patliputra.
5.0327 35 23-Feb-12 - -
28 M/S Angel Farms, Haryana. Proposal for establishment of 192000,00 pieces
per year capacity Egg Hatchery unit in
partnership at Industrial Area, Fatuha, Patna.
2.6793 68 11-Jun-12 - -
29 M/S Bihar Milk Products Pvt. Ltd, Bhojpur. Proposal for establishment of 4 Lakh Liter per
day capacity Milk Processing unit at Industrial
Area, Bihiya, Bhojpur.
21.35 77 27-Jul-11 - -
30 M/S Kunwar Apiary Pvt. Ltd, Gaya. Proposal for establishment of 10 MT per day
capacity Honey Processing unit at Janakpur,
Buniyadganj.
1.41 20 19-Apr-10 06-Jan-11
31 M/S Swastik Refinery Pvt. Ltd, Kolkata. Proposal for establishment of 31000 MT per
year capacity Oil and Banaspati
(Hydrogenated) and Vegetable Oil and
Fats(other than Hydrogenated) production unit
at Kahalgaon Industrial Area, Bhagalpur.
30 114 12-Jan-11 - -
32 M/S Krishna & Fula Industries, Bettiah, West Champaran. Proposal for establishment of 15,000 MT per
year capacity Poultry Feed/Cattle Feed unit at
Kumarbagh, Bettiah in Partnership.
0.8477 26 12-Jan-11 - -
33 M/S Mahadeva Feeds Industries, Raxual, East Champaran. Proposal for establishment of 3600 MT per
year capacity Poultry Feed unit at Industrial
Area, Raxaul in proprietorship.
1.1448 21 12-Jan-11 - -
34 M/S Shiv Shakti Industries Pvt. Ltd., Raxaul. Proposal for establishment of 10 MT per hour
Poultry Feed unit at Majharia, Ramgarhwa,
East Champaran.
15.1777 70 23-Feb-12 - -
35 M/S Mahashakti Industries, Varanasi. Proposal for establishment of 66,000 MT per
year capacity Poultry Feed unit in partnership
at Industrial area, Pandaul,Madhubani.
9.3162 40 11-Jun-12 - -
36 M/S Technocrates, Forbesganj, Araria. Proposal for establishment of 9000 MT per
year capacity Cattle Feed and Poultry Feed unit
in proprietorship at Industrial Area,
Forbesganj.
2.511 117 11-Jun-12 - -
37 M/S Rathi Feeds India Pvt. Ltd., Haryana. Proposal for establishment of 36000 MT per
year capacity Poultry Feed production unit at
Maranga, Purnea.
10.305 50 23-Feb-12 - -
38 M/S Skylark Feeds Pvt. Ltd., Haryana. Proposal for establishment of 200 MT per day
capacity Poultry Feed Production unit at
Maranga Industrial Area, Purnea
4.4282 22 23-Feb-12 - -
39 M/s Rupam Manufacturing and Trading Pvt. Ltd., Katihar. Proposal for establishment of 30,000 MT per
year capacity Cattle Feed and Poultry Feed unit
at Industrial Growth Centre, Maraga, Purnea
3.474 36 08-Feb-13 - -
40 M/S Ashok Cattle and Poultry Feeds Pvt. Ltd, Darbhanga Establishment of 9600 MT per year capacity
Cattle and Poultry Feed Unit at New Industrial
Estate Bela, Darbhanga.
0.8922 18 16-Nov-09 11-Feb-10
41 M/s Sri Rani Sati Agri Feeds Pvt. Ltd. Darbhanga 9600 MT per year capacity Poultry Feed and
cattle Feed unit at Industrial Area, Donar,
Darbhanga
1.3973 5 13-Aug-12 - -
42 M/s Mithila Feed, Darbhanga 2400 MT Per year capacity Poultry Feed and
cattle Feed unit in proprietorship at Darbhanga
1.1239 27 13-Aug-12 - -
2
43 M/s Sahu Industries, Darbhanga 9600 MT Per year capacity Poultry Feed and
cattle feed unit in Darbhanga
3.4057 63 18-Sep-12 - -
44 M/s Ashoka Cattle and Poultry Feeds Pvt. Ltd., Darbhanga. 30000 MT per year capacity cattle and poultry
feed unit at industrial Area, Donar, Darbhanga
4.011 36 18-Sep-12 - -
45 M/s Shiv Shakti Hatchery Pvt. Ltd. Vaishali. Proposal for establishment of 19,200 MT per
year capacity Poultry Feed unit at Industrial
Area, Donar, Darbhanga
1.9437 12 02-Jan-13 - -
46 M/s Sai Feed Pvt. Ltd., Darbhanga. Proposal for establishment of 05 MT per hour
Poultry Feed unit at Industrial Area, Donar,
Darbhanga.
1.9835 31 13-Mar-13 - -
47 M/S Raj Agrochem Products Pvt. Ltd, Muzaffarpur. Establishment of 45000 MT per year capacity
Poultry Feed and Cattle Feed Unit at
Bochahan, Muzaffarpur.
5.39 41 01-Feb-10 16-Apr-10
48 M/S Anmol Feeds Pvt. Ltd, Muzaffarpur Proposal for capacity expansion from 36000
MT per year capacity to 81000 MT per year
capacity in the existing unit of Cattle and
Poultry Feed at Bela Industrial Area,
Muzaffarpur.
3.39 55 21-Jul-10 16-Feb-12
49 M/S Aroma Feeds Pvt. Ltd, Muzaffarpur. Proposal for establishment of 12000 MT per
year capacity Cattle Feed unit at Kanti,
Muzaffarpur.
1.1937 22 29-Nov-10 - -
50 M/S Agro Industries, Muzaffarpur. Proposal for establishment of 55,200 MT per
year capacity Poultry Feed unit in
proprietorship at Industrial Estate, Bela,
Muzaffarpur.
7.0727 123 29-Nov-10 - -
51 M/S Gangotri Holy Products Pvt. Ltd, Muzaffarpur. Proposal for establishment of 72 Thousand MT
per year capacity Cattle Feed unit at Industrial
Estate, Bela, Muzaffarpur.
5.969 41 29-Nov-10 - -
52 M/S Hentech Agrovet Pvt. Ltd., Muzaffarpur. Proposal for establishment of 45,000 MT per
year capacity Cattle Feed, Poultry Feed, Fish
Feed and Pig Feed production unit at Industrial
Area, Muzaffarpur.
3.4025 55 11-Jun-12 - -
53 M/s Ugraya Suppliers Pvt. Ltd. New Delhi 1.20 Lakh MT per year capacity Poultry Feed
unit at Industrial Estate, Bela, Muzaffarpur
14.7663 43 18-Sep-12 - -
54 M/s Shalimar Pellet Feeds Ltd. Kolkata 60,000 MT per year Capacity Poultry Feed unit
at Industrial Area, Muzaffarpur
10.707 60 18-Sep-12 - -
55 M/s Dayal Industries Ltd., New Delhi. 45000 MT per year capacity Catle Feed Unit at
Industrial Area, Muzaffarpur.
6.7176 67 18-Sep-12 - -
56 M/s Mehta Feeds India Pvt. Ltd., Hazaribagh. 19200 MT Per year capacity Poultry Feed unit
at Bela Industrial Area, Muzaffarpur.
5.9614 32 28-Nov-12 - -
57 M/s Neogenetics Foods Pvt. Ltd., Bangalore. 50000 MT Per Year capacity Maize based
Poultry Feed unit at Muzaffarpur
4.026 58 28-Nov-12 - -
58 M/s Maharashtra Feeds Pvt. Ltd. Delhi. Proposal for establishment of 38,400 MT per
yera capacity Cattle feed and Poultry Feed unit
at Industrial Area, Beal, Muzaffarpur
3.61 39 08-Feb-13 - -
59 M/S Hariom Feeds Pvt. Ltd., Gopalganj. Proposal for establishment of 30,000 MT per
year capacity Cattle Feed and Poultry Feed unit
at Gopalganj Birtitola, Manjhagarh, Gopalganj.
5.6288 37 23-Feb-12 - -
60 M/S Inspiring Agro Ltd., Kolkata. Proposal for establishment of 50 Lakh Eggs per
day capacity, 50 Lakh Chicks per year capacity,
800 TDP capacity Poultry Feed unit, 20 MW
Biomass Based Power Plant and 1500 Ton
Pisces Culture unit in t
1176 2100 09-Apr-12 - -
61 M/S Vindhyawasini Agro Tech Pvt. Ltd., Patna. Proposal for establishment of 15,000 MT per
year capacity Poultry Feed unit at Chhapiya,
Baniyapur, Saran.
1.3824 36 23-Feb-12 - -
62 M/s Protech Feed Pvt. Ltd.)., Hajipur. (Name has been
changed from M/S Protech Bio-System to M/S Protech
Biosciences Pvt. Ltd.) (Company's proposal approved by SIPB
on 02.01.08 for production of LVP i
Establishment of 48,000 MT per year capacity
Cattle and Poultry Feed unit at E.P.I.P, Hajipur
14.7 60 27-Aug-10 19-Mar-11
63 M/S Godrej Agrovet Ltd, Mumbai. Proposal for production of 84000 MT per year
capacity of Cattle and Poultry Feed at EPIP,
Hajipur, Vaishali.
17.05 220 29-Nov-10 - -
64 M/S Nandita Poultry Integrators Pvt. Ltd, Ranchi. Proposal for 30,000 MT per year capacity
expansion in the existing unit of 18,000 MT per
year capacity of Poultry Feed and Cattle Feed
at Industrial Area, Hajipur.
5.4853 21 27-Jul-11 - -
65 M/S R.K. Poultry Feed Industries, Hajipur(Vaishali). (Earlier
on 28.09.11 approval was given for capacity expansion from
6,000 MT per year capacity to 30,000 MT per year capacity in
the existing Poult
Proposal for capacity expansion from 6,000 MT
per year capacity to 30,000 MT per year
capacity in the existing Poultry Feed unit in
partnership at Industrial Area, Hajipur.
2.6365 21 23-Feb-12 - -
66 M/s Sunil Singh Hatchery (India) Pvt. Ltd, Hajipur 4800 MT per year capacity Poultry Feed unit at
Industrial Area, Hajipur
1.0261 9 28-Nov-12 - -
3
67 M/S Swastik Agro Industries(Promoter Company M/S Swastik
Hotels and inns Pvt. Ltd.,), Vaishali.
Proposal for establishment of 05 MT per hour
capacity Cattle Feed and Poultry Feed unit in
the name of M/S Swastik Agro Industries at
Industrial Area, Hajipur.
3.3021 47 23-Feb-12 - -
68 M/S Srishyam Agro Pvt. Ltd., Patna. Proposal for capacity expansion from 100 MT
per day capacity to 150 MT per day capacity in
the existing Poultry and Cattle Feed unit at
Industrial Area, Hajipur.
0.7701 8 26-Mar-12 - -
69 M/S Modern Amrit Feed Company Pvt. Ltd., Samastipur. Proposal for establishment of 12,000 MT per
year capacity Poultry Feed and Cattle Feed unit
at Mohanpur, Samastipur.
3.9277 31 28-Sep-11 - -
70 M/S Shivshakti Hatchery Pvt. Ltd., Samastipur. Proposal for establishment of 9600 MT per
year capacity Poultry Feed unit at Hansa,
Warisnagar, Samastipur.
0.9972 56 11-Jun-12 - -
71 M/S Kanishka Agro Foods Pvt Ltd, Begusarai. Proposal for establishment of 40,000 MT per
year capacity Cattle and Poultry Feed unit at
Industrial Area, Barauni.
4.7 36 29-Jun-10 - -
72 M/S Tara Health Foods Ltd., Ludhiana, Punjab. Proposal for establishment of 250 MT per day
capacity Cattle Feed production unit at
Industrial Area, Barauni, Begusarai.
14.8 185 11-Jun-12 - -
73 M/s Ganga Live Feed Pvt. Ltd., Begusarai. 30000 MT per year capacity cattle feed unit at
Ramjanpur,Begusarai
5.3783 33 18-Sep-12 - -
74 M/S Anand Feeds Pvt. Ltd, Patna. Proposal for establishment of 15,000 MT per
year capacity Poultry Feed unit at Industrial
Area, Fatuha, Patna.
1.5424 60 12-Jan-11 10-Apr-11
75 M/S Patwari Steels Pvt. Ltd, Fatuha, Patna. Proposal for establishment of 30,000 MT per
year capacity Poultry Feed and Cattle Feed unit
at Industrial Area, Fatuha, Patna.
6.121 20 25-Feb-11 30-Jul-11
76 M/S Aahar Feeds and Agro Products Pvt. Ltd., Patna Proposal for establishment of 33,000 MT per
year capacity Poultry Feed unit at Fatuha
Industrial Area, Fatuha, Patna.
10.3375 21 28-Sep-11 - -
77 M/s Susheela Agro Industries Patna
M/s Susheela Agro Industries Patna
9000 MT per year capacity Cattle Feed and
Poultry Feed unit in propretorship at industrial
Area, Fatuha, Patna.
1.2891 32 18-Sep-12 - -
78 M/S Shrawasthi Agrotech Pvt. Ltd, Lucknow. Establishment of 4500 MT capacity Poultry
Feed unit at Giddha Growth Centre,
Ara(Bhojpur).
6.18 30 01-Feb-10 04-Feb-11
79 M/S Sampurnam Agro Foods Pvt. Ltd., Patna. Proposal for establishment of 2400 MT per
year capacity Cattle Feed unit at Industrial
Area, Bihiya, Bhojpur.
1.4001 22 23-Feb-12 - -
80 M/S Shrawasthi Agrotech Pvt. Ltd., Lucknow. Proposal for capacity expansion of existing unit
of Cattle Feed from 45000 MT per year
capacity to 90,000 MT per year capacity at
Giddha Industrial Growth centre, Ara.
5.1886 45 23-Feb-12 - -
81 M/S Sristhi Feeds Pvt. Ltd., Patna Proposal for establishment of 9600 MT per
year capacity Cattle and Poultry Feed unit at
Industrial Area, Growth Centre, Giddha.
0.9939 35 09-Apr-12 - -
82 M/s Vikash Verma Agrotech Pvt, Ltd., Ara (Bhojpur) 15000 MT Per year capacity Cattle Feed and
Poultry Feed unit at Khajuata, Bhojpur.
1.9557 25 28-Nov-12 - -
83 M/s Sone Ganga Feeds Pvt. Ltd., Rohtas Poultry Feed unit at Bharatkasba, Karakat,
Rohtas.
5 25 18-Sep-12 - -
1815.1132 7032
1 M/S Manju Makhana Enterprises Pvt. Ltd, Madhubani.
(Unit's proposal approved by SIPB on 18.11.08 for
establishment of Makhana Storage Godown and Mechanised
Packaging Facilities in the name of M/S Manj
Proposal for establishment of Makhana
Processing and 200 MT Warehouse at Sapta,
Rahika, Madhubani.
0.8 15 11-Aug-10 04-Jun-09
2 M/S MMMJ Food Processing Industry, Madhubani. Proposal for establishment of 12 MT per year
capacity Makhana Processing unit in
proprietorship at Mahtoregoth,
Mahadeomath, Madhubani.
0.2 16 29-Nov-10 - -
3 M/s Nu Creations, New Delhi 200 MT per year capacity Makhana Processing
unit in proprietorship at Forbesganj Indusrial
Area, Araria
1 15 28-Nov-12 - -
4 M/s Pankaj International Purnea. 216 MT per year Capacity Button Mushroom
Processing, Packaging and Canning unit in
proprietorship at Maranga Growth Centre,
Purnea.
2.6 50 28-Nov-12 - -
5 M/S Paras Agro Foods, Muzaffarpur. Proposal for establishment of 54000 MT per
year capacity Makhana Processing and
Packaging unit at Bela Industrial Estate,
Muzaffarpur in proprietorship.
0.2676 12 29-Jun-10 02-Jan-12
6 M/S Shakti Sudha Industries, Boring Road,Patna. Establishment of Makhana Processing Unit &
with Bac Backward/ Forward linkage
70 0 14-Aug-06 - -
Fruits, Vegetables, Cereals & Pulses and other vegetable produces like Lac, Gum etc. and prepatation thereof
TOTAL :-
4
7 M/s Chanakya Agro Products Pvt. Ltd. Patna 10 lac Kg per year capacity CTC-Tea Production
unit at Pothiya, Kishanganj.
4.7994 62 28-Nov-12 - -
8 M/s Ayesha Export Pvt. Lta. Kolkata. Proposal for establishment of 7.66 Lac Kg.
Made-Tea per year capacity production unit at
Bagalbari, Pothia, Kishanganj.
20.2019 35 08-Feb-13 - -
9 M/S Ranjan Foods Products, Darbhanga Proposal for establishment of 72 MT per year
capacity Spices manufacturing unit and 120 MT
per year capacity Besan and Sattu production
unit in proprietorship at Industrial Area, Donar,
Darbhanga.
0.2735 10 26-May-11 - -
10 M/s Sureka Industries Pvt. Ltd. Darbhanga 250 MT per year capacity spice production unit
at Industrial Area, Donar, Darbhanga
1.325 12 18-Sep-12 - -
11 M/S Shree Shyam Kutir Udyog, Muzaffarpur. Proposal for establishment of 480 MT per year
capacity Spice Powder and Besan Udyog at
Industrial Estate, Bela, Muzaffarpur in
proprietorship.
0.3273 15 19-Apr-10 - -
12 M/S Prince Masala Company, Muzaffarpur. Proposal for establishment of 450 MT per year
capacity Spices and Spice Blends
Manufacturing and Packaging unit at
Muzaffarpur in proprietorship.
0.1249 25 13-Aug-10 - -
13 M/S Bihar Spices & Foods, Muzaffarpur. Proposal for establishment of 40 MT per year
capacity Spice Processing and Packaging unit in
proprietorship at Bela Industrial Area,
Muzaffarpur.
0.25 8 29-Nov-10 - -
14 M/S Vishwa Laghu Udyog, Muzaffarpur. Proposal for establishment of 1.80 MTPA Spice
and 1.50 MTPA Besan and Sattu unit in
proprietorship at Bela Industrial Area,
Muzaffarpur.
0.316 11 26-May-11 - -
15 M/s Gopal & Company, Muzaffarpur. 600 MTPA Capacity Sattu, 600 MTPA Capacity
Besan, 90 MTPA Capacity Spice production unit
Industrial Area, Muzaffarpur
1.5032 7 28-Nov-12 - -
16 M/S Rozy Food Processing Pvt. Ltd, Begusarai Proposal for capacity expansion of existing
production unit of Spice Powder from 500 Kg
per day to 1500 Kg per day at Tilrath Industrial
Area, Barauni, Begusarai.
0.9423 15 08-Mar-10 - -
17 M/s Aroma Beauty & Health Care Pvt. Ltd. Patna 192 MT per year capacity spice powder unit at
Fatuha, Patna
1.026 10 13-Aug-12 - -
18 M/S Sunasi Food and Beverages Pvt. Ltd., Patna. Proposal for establishment of production unit
of 150 MT per year capacity Ethnic and
Extruded Foods(Ready to eat Namkin Extruded
Snacks, Packaged Food, Spices & Paste of
Spices, Indian Sweets, Pot
1.62 14 28-Sep-11 - -
19 M/s Saphir Warehousing Services Pvt. Ltd., Uttar Pradesh. 160 MT Per day capacity Energy Food
Production unit at industrial unit, Bhojpur
5.085 71 28-Nov-12 - -
20 M/S Aarcee Foods, Aurangabad. Proposal for establishment of 300 MT per year
capacity Spices Grinding, Spice Blending and
Packaging unit at Industrial Area, Aurangabad
in proprietorship.
0.7569 25 13-Aug-10 - -
21 M/s Maurya Co-operative Agro Industries Ltd., Madhepura. 9.9 Lakh ton per year capacity Maize
Processing unit at Kalasan, Madhepura
400 10000 18-Sep-12 - -
22 M/S Green Mark Health Care System & Solution, Darbhanga. Proposal for establishment of 4800 MT per
year capacity Roasted Gram, Maize and Corn
Flakes unit in proprietorship at Industrial Area,
Donar, Darbhanga.
1.2575 24 11-Jun-12 - -
23 M/S Maa Durga Industries, Vaishali. Proposal for establishment of 3000 MT per
year capacity Maize Flour, Corn Flakes
production unit in proprietorship at EPIP,
Hajipur.
1.0971 16 11-Jun-12 - -
24 M/s Peerage Buildtech Pvt. Ltd, Delhi. 1200 MT per year capacity Extruded Cereal
based Nutri Food unit at Industrial Area,
Hajipur
1.6685 20 28-Nov-12 - -
25 M/S Creation Agro Processing Industries, Bhagalpur. Proposal for establishment of 1500 MT per
year capacity Chura(Pressed Rice) Mill at Barari
Industrial Area, Bhagalpur in proprietorship.
0.46 12 03-May-10 - -
26 M/S Shiv Shakti Modern Flour Mills Pvt. Ltd., Raxaul, East
Champaran.
Establishment of Flour Mill with the capacity of
120 MT per day at Raghunathpur, Ramgharwa,
Raxaul, E.Champaran.
6.144 78 19-Oct-09 11-Feb-10
27 M/S Jagadamba Bhawani Agro Pvt. Ltd., Raxaul (East
Champaran)
Proposal for establishment of 150 MT per day
capacity Roller Flour Mill unit at Raxaul, East
Champarn.
9.3942 100 23-Feb-12 - -
28 M/S Sitamarhi Flour Mill Pvt. Ltd., Sitamarhi. Proposal for establishment of 125 MT per day
capacity of Roller Flour Mill unit at Banchauri,
Dumra, Sitamarhi.
9.48 45 28-Sep-11 - -
29 M/S Star Flour Mills Pvt. Ltd, Patna. Proposal for establishment of 150 MT per day
capacity Flour Mill at Pandaul Industrial Area,
Madhubani.
9.3375 72 29-Nov-10 25-Apr-12
5
30 M/S Janardhan Ramjhari Enterprises Pvt. Ltd, Madhubani Proposal for establishment of 18000 MT per
year capacity Flour Mill at Pandaul Industrial
Area, Madhubani.
1.6458 34 26-May-11 10-Apr-12
31 M/S Pandoul Flour Mills Pvt. Ltd, Darbhanga. Proposal for establishment of 59, 100 MT per
year capacity Folur Mill unit at Industrial Area,
Pandaul, Madhubani.
8.6761 40 27-Jul-11 - -
32 M/s Kumar Food Product, Madhubani. Proposal for establishment of 05 MT per hour
Roller Flour Mill unit in partnership at
Industrial Area, Jhanjharpur, Madhubani.
1.06 11 13-Jan-13 - -
33 M/S Auro Sundram International Pvt. Ltd., Roorkee, Dist.-
Haridwar(Uttarakhand) (Company's earlier proposal
approved by SIPB on 19.10.09 to set up 150 TPD capacity
Maize Processing unit for production
Establishment of 300 TDP capacity Maize
Processing unit for production of Maize Starch
and Liquid Glucose and 03 MW in place of 2.5
MW Captive Power Plant at Industrial Area,
Forbesganj, Araria.
110 140 28-Sep-11 24-Jun-10
34 M/S M.B. Organics Pvt. Ltd, Purnea. Proposal for establishment of 2400 MT per
year capacity Soya Bari and Finger Strip Bari
production unit at Industrial Area, Purnea.
0.9628 30 12-Jan-11 - -
35 M/S Vinayak Food Industries, Saharsa Proposal for establishment of 1440 MT per
year capacity Sattu, Besan, Atta production
unit in proprietorship at Industrial Area,
Saharsa.
0.6725 9 26-May-11 - -
36 M/S Sita Flour Mills Pvt. Ltd, Darbhanga Proposal for capacity expansion of existing
Flour Mill from 100 MT per hour to 200 MT per
hour at Donar Industrial Area, Darbhanga.
1.45 7 22-Feb-10 04-Feb-11
37 M/S Mithla Flour Mills, Darbhanga. Proposal for capacity expansion from 200 MT
per day to 310 MT per day capacity in the
existing Roller Flour Mill unit in proprietorship
at Gangwara, Makhwara, Darbhanga.
3.1207 40 28-Sep-11 - -
38 M/S Mithila Food Processing, Darbhanga. Proposal for Capacity expansion and
Modernization of the existing Sattu production
unit from 2400 MT per year to 6000 MT per
year in proprietorship at Laxmi Nagar,
Darbhanga.
0.3 5 23-Feb-12 - -
39 M/S Maa Shyama Ganga Agronomy Pvt. Ltd., Darbhanga. Proposal for establishment of 21,600 MT per
year capacity Flour Mill unit at New Industrial
State, Bela, Darbhanga.
4.331 67 11-Jun-12 - -
40 M/S G. C. Foods Pvt. Ltd, Muzaffarpur. Establishment of 960 MT per year capacity Puff
and Fried Snacks Food unit at Industrial Estate,
Bela, Muzaffarpur.
1.91 23 01-Feb-10 - -
41 M/S Pashupati Roller Flour Mill Pvt. Ltd, East Champaran. Proposal for establishment of 100 MT per day
capacity Roller Flour Mill at Bela Industrial
Area, Muzaffarpur.
5.6 30 24-May-10 02-Dec-11
42 M/S Vishwanath Agro Foods Pvt. Ltd, Muzaffarpur. Proposal for establishment of 60 MT per day
capacity Modern Maize Mill at Kudhani,
Muzaffarpur
4.6 35 29-Jun-10 04-Feb-11
43 M/S Oriental Crafts Manufacturing Company Pvt. Ltd ,
Guwahati, Assam.
Proposal for establishment of 40,000 MT per
year capacity Maize based Cattle Feed and
Poultry Feed production unit at Bela Industrial
Area, Muzaffarpur.
4.45 36 21-Jul-10 - -
44 M/S Dharti Agro Food Products, Muzaffarpur. Proposal for establishment of 24 MT per day
capacity Flour Mill at Bela Industrial Area,
Muzaffarpur in Partnership.
0.8748 32 21-Jul-10 - -
45 M/s G.C. Consumer Products Pvt. Ltd. Muzaffarpur 80 MT per day capacity Whole Mill Atta
production unit at Bela Industrial Area,
Muzaffarpur
2.6824 28 13-Aug-12 - -
46 M/s Ishan Industries, Muzaffarpur. 1200 MT per year capacity Corn Flakes, Potato
Wafers and Fryum at Industrial Area,
Muzaffarpur.
1.44 35 28-Nov-12 - -
47 M/s Shubh Laxmi Flour Mills, Muzaffarpur 24000 MT per year capacity whole wheat Atta
Chakki unit in partnership at Patiyasa,
Bochaha, Muzaffarpur.
2.8273 25 28-Nov-12 - -
48 M/s Lavanya Pure Food Pvt. Ltd. Muzaffarpur 45000 MT per year capacity Roller Flour Mill
unit at Industrial Area, Bela, Muzaffarpur.
16.11 50 28-Nov-12 - -
49 M/s Sumitra Sahu and Sons Agro Pvt. Ltd, Muzaffarpur. 24000 MT per year capacity Roller Flour Mill
unit at Bela Industrial Area, Muzaffarpur.
3.5323 20 28-Nov-12 - -
50 M/s Lali Atta Mill L.L.P. Gopalganj Proposal for establishment of 18,000 MT per
year capacity Whole wheat Atta Mill unit in
partnership
4.118 34 08-Feb-13 - -
51 M/s Laheji Freezing House Pvt. Ltd., Siwan. 200 MTPD Capacity Roller Flour Mill unit in the
name of M/s Laheji Roller Flour Mill at Laheji,
Siwan.
20.2455 125 28-Nov-12 - -
52 M/S ESVEEGEE STARCH AND CHEMICALS PVT. LTD.,
Ahmadabad.
Proposal for establishment of Maize Processing
Unit at Imadpur Raghunathpur, Block-
Bhagwanpur, Dist.- Vaishali
90 250 18-Nov-08 22-Dec-08
6
53 M/S Akanksha Foods Pvt Ltd, Patna City, patna. Proposal for establishment of 21,600 MT per
year capacity Flour and Bran production unit at
E.P.I.P. , Hajipur.
6.1 67 29-Jun-10 - -
54 M/S L V Commercial Pvt. Ltd, Patna. Proposal for establishment of 49,500 MT per
year capacity Roller Flour Mill at E.P.I.P,
Hajipur.
11.141 69 27-Jul-11 - -
55 M/S Nalanda Biscuit Company Ltd, Patna. Proposal for establishment of 75,000 MT per
year capacity Flour Mill unit at E.P.I.P, Hajipur.
14.6753 40 27-Jul-11 - -
56 M/S LV Enterprises Pvt. Ltd., Patna. Proposal for establishment of 250 MT per day
capacity of Roller Flour Mill unit at
Hajipur(Vaishali).
15.3 69 28-Sep-11 - -
57 M/S Jagat Jagdamba Flour Pvt. Ltd., Hajipur(Vaishali). Proposal for establishment of 300 MT per day
capacity Roller Flour Mill unit at Kisanpura,
Balukaram, Dist.-Vaishali.
12 33 23-Feb-12 - -
58 M/s Om Shri Dhanushdhari Foods Ltd. Patna 100 MT per day capacity Roller Flour Mill and
50 MT per day Capacity Atta Chakki unit at
Hajipur (Vaishali)
9.8442 100 13-Aug-12 - -
59 M/s Bansal Industries, Begusarai 24000 MT per year capacity Whole Wheat Ata
Chakki Plant (Flour Mill) unit in proprietorship
at Barauni Industrial Area, Deona, Begusarai.
2.1436 25 18-Sep-12 - -
60 M/s Balajee Flour Mills, Begusarai 24000 MT per year capacity Ata Chakki Mill
unit in partnership at Phulwaria, Begusaria.
2.1184 25 18-Sep-12 - -
61 M/S Bihar Starch Ltd, Khagaria. Proposal for establishment of Maize Processing
Unit at Kothia, Kashimpur, Khagaria.
17.11 91 18-Nov-08 28-Dec-08
62 M/S Ambo Exports Ltd, Kolkata Establishment of 1(one) Lakh MT per year
capacity Maize Primary Processing, Drying,
Sorting and Packaging unit at Kahalgaon
Industrial Area, Bhagalpur.
17 27 07-Dec-09 - -
63 M/S Gulshan Polyols Ltd, Delhi (Cancelling the earlier
proposal approved on 19.04.10, approval has been given for
establishment of Maize Processing unit for the production
capacity of Sorbitol-10,000
Proposal for establishment of Maize Processing
unit for the production capacity of Sorbitol-
10,000 MT per year, Dextrose Monohydrate -
20,000 MT per year and Lysine- 30,000 MT per
year capacity from M
583.05 531 09-Apr-12 - -
64 M/S Ambo Exports Ltd, Kolkata Proposal for establishment of 18,000 MT per
year capacity Maize Starch Production Unit at
Kahalgaon Industrial Area, Bhagalpur.
16.12 114 21-Jul-10 - -
65 M/S Tirupati Balajee Nutrition Pvt. Ltd., Patna Establishment of Flour Mill with the capacity of
45,000 MT per year at Khedalpura, Bihta,
Patna.
5.56 103 18-May-09 07-Aug-09
66 M/S Gaurav Foods and Cool Connections Pvt. Ltd, Patna Establishment of 45000 MTA capacity Roller
Flour Mill at Didarganj, Patna City
4.8781 103 30-Nov-09 01-Feb-10
67 M/S Shree Shree Dwarikaji Foods Pvt. Ltd, Patna City. Proposal for capacity expansion from 24000
MT per year to 60000 MT per year in the
existing Flour Mill at Karmali Chak, Bypass
Road, Patna City.
3.77 50 21-Dec-09 06-Jan-11
68 M/S Radhika Flour Mills Pvt. Ltd, Patna. Proposal for establishment of 36,000 MT
capacity Flour Mill for production of Maida,
Atta, Suzi and Chokar at Sikandarpur, Bihta.
5.84 55 03-May-10 10-Apr-11
69 M/S Jaya Nutritions Pvt. Ltd, Deedarganj Patna City. Proposal for establishment of 80 MT per day
capacity Roller Flour Mill at Deedarganj, Patna
City.
5.65 42 03-May-10 23-Jul-10
70 M/S Tota Rai Food Products, Patna. Proposal for establishment of 4.5 MT per day
capacity Flour Mill in proprietorship at
Industrial Area, Fatuha, Patna
0.9754 26 26-May-11 - -
71 M/S Achyut Shanti Foods Pvt. Ltd., Patna. Proposal for establishment of production unit
of 18,000 MT per year capacity of Besan, Sattu
and Daliya at Industrial Area, Fatuha, Patna.
1.11 25 28-Sep-11 - -
72 M/S Danapur Flour Mills Ltd., Patna. Proposal for modernization and capacity
expansion from 33,000 MT per year capacity to
58,500 MT per year capacity in the existing
Flour Mill at Nasriganj, Danapur, Patna.
5.0875 17 28-Sep-11 - -
73 M/S Vaishali Flour Mills, Patna Proposal for capacity expansion from 100 MT
per day to 172 MT per day capacity in the
existing unit of Flour Mill in proprietorship at
Nasriganj, Digha, Patna.
1.8825 40 28-Sep-11 - -
74 M/S Shankar Agrotech and Food Pvt. Ltd., Patna. Proposal for establishment of 18,000 MT per
year capacity Roller Flour Mill unit at
Chhitnama, Maner, Patna.
2.52 21 23-Feb-12 - -
75 M/S Trimurti Flour Mill Pvt. Ltd., Deedarganj, Patna City,
Patna.
Proposal for establishment of 100 MT per day
capacity Roller and Chakki Flour Mill unit at
Deedarganj, Patna City, Patna.
5.5505 30 23-Feb-12 - -
7
76 M/s Parashmani Food & Chem Pvt. Ltd. Patna 120 MT per year capacity Snacks and Puffs
Production unit at Danapur Cantt, Patna
1 13 13-Aug-12 - -
77 M/s Srinivash Food Industries, Patna 3120 MT per year capacity Maize Poha, Rice
Poha and Chilli Powders Production unit in
proprietorship at Fatuha Industrial Area,
Fatuha, Patna
1.287 30 18-Sep-12 - -
78 M/s Neel Kanth Agrofood Products Pvt. Ltd. patna 150 MT per day capacity Roller Flour Mill unit
at Mahuli, Patna.
11.2095 115 28-Nov-12 - -
79 M/S Hamara Industries, Boring Road, Patna Proposal for establishment of 700 MT per year
capacity Glucose-D Processing and Packaging
unit from Dextrose Monohydrate (100% Maize
product) at Industrial Area, Giddha.
2.55 50 21-Dec-09 27-Feb-11
80 M/S Aditya Food Products, Ara(Bhojpur) Proposal for establishment of 21,600 MT per
year capacity Flour Mill in partnership at
Giddha, Ara.
1.43 36 19-Apr-10 - -
81 M/S Maruti Nandan Food Products Pvt. Ltd, Ara Proposal for establishment of 250 MT per day
capacity Roller Flour Mill at Giddha Industrial
Area, Ara.
12.38 60 08-Jun-10 26-Jul-10
82 M/s Amrapali Biotech India Pvt. Ltd., Gaziabada, Uttar
Pradesh.
5000 MT per capacity Corn Flakes and Wheat
Flakes production unit at Navanagar, Buxar.
18.5643 120 28-Nov-12 - -
83 M/S Gallantt Udyog Ltd., Gorakhpur. Proposal for establishment of 400 MT per day
capacity Roller Flour Mill unit at Durgawati,
Chipali, Karamnasa, Bhabhua.
25 100 09-Apr-12 - -
84 M/s Golden Flour Mill Pvt. Ltd. Kaimur Proposal for establishment of 9000 MT per
year capacity Flour Mill unit for production of
Maida, Atta, Suzi at Bharkhar, Kaimur
8 35 08-Feb-13 - -
85 M/s Maa Mundeshwari Flour Mill Pvt. Ltd. Mohania, Kaimur Proposal for establishment of 800 MT per
capacity Flour Mill unit for Atta, Maida, Suzi at
Mohania, Kaimur
8.5 23 08-Feb-13 - -
86 M/s Maa Vishno Roller Flour Mill, Sasaram. 100 Ton per day capacity Roller Flour Mill unit
in partnership at Industrial Area, Dehri, Rohtas.
6.1074 100 28-Nov-12 - -
87 M/s Maa Flour Mill, Paduhar, Darihat, Rohtas Proposal for establishment of 24,000 MT Per
year capacity Flour Mill unit in proprietorship
at Darihat, Rohtas.
2.4158 15 02-Jan-13 - -
88 M/s Shree Shashwatraj Agro Pvt. Ltd. Aurangabad 3528 MT per year capacity Flour Mill unit at
Industrial Growth Centre, Aurangabad
1.0297 29 18-Sep-12 - -
89 M/s Maya Foods and Drinks Pvt. Ltd. Patna. 18000 MT per year capacity Whole Wheat
Plant at Gaya.
2.6262 21 28-Nov-12 - -
90 M/s Bihari Soya Foods Processing Pvt. Ltd., Gaya. Proposal for establishment of 1680 MT per
year capacity Soya Bari unit at Hariharpur,
Bodhgaya, Gaya.
1.3704 12 13-Mar-13 - -
91 M/S Keshav Madhav Agro Enterprises Pvt. Ltd., Patna. Proposal for establishment of 150 MT per day
capacity of Roller Flour Mill unit at Fatehpur,
Nawada.
10.4975 50 28-Sep-11 06-Feb-12
92 M/S Vishnu Food Products, East Champaran. Proposal for establishment of 108 MT per year
capacity Oil Mill and 7200 MT Rice Polishing
unit under proprietorship at Nakched Tola,
Ward No.- 4, Motihari.
1.4634 34 09-Apr-12 - -
93 M/S Samras Products Pvt. Ltd, Sitamarhi Proposal for establishment of 37 Thousand
Liters per day capacity Edible Oil Packing unit
at Industrial Area, Sitamarhi.
4.35 10 29-Nov-10 25-Apr-12
94 M/S Vishnujee Oil Mill, Darbhanga. Proposal for establishment of Mustard Oil Mill
unit in proprietorship at Bela Industrial Area,
Darbhanga.
0.6631 10 16-Apr-12 - -
95 M.s P.S. Oil Industries Pvt. Ltd., Darbhanga. Proposal for establishment of 12000 MT per
year capacity Mustard Oil unita at Brahampur,
Singhwara, Darbhanga.
8.0183 77 13-Mar-13 - -
96 M/S Ganesh Edibles LLP, Muzaffapur. Proposal for establishment of 60,000 MT per
year capacity Refined and Hydrogenated Oil
production unit at Baijnathpur, Ahiyapur,
Muzaffarpur.
26.63 150 27-Jul-11 - -
97 M/S Siddhi Refoils & Industries Pvt. Ltd, Kolkata. (Earlier
on 29.06.10 approval was given for establishment of 75,000
MT per year capacity Edible Oil Refinery Plant and 1 MW
Captive Power Plant a
Proposal for establishment of 75,000 MT per
year capacity Edible Oil Refinery Plant and 2
MW Captive Power Plant at Akbar Malahi,
Lalganj, Vaishali.
58.1 130 23-Feb-12 18-Dec-11
98 M/S Jai Shree Balaji Fats & Oils Pvt. Ltd., Kolkata. Proposal for establishment of 250 TPD Edible
Oil Refinery, 100 TDP Banaspati Oil Plant, 50
TPD Rice Bran Oil/ Sun Flower Oil / Solvent Oil
and 01 MW Captive Power Plant at Akbar
Malahi, Lalganj, Vaish
65.5 130 28-Sep-11 - -
99 M/S Mohini Oil Mills, Nalanda. Proposal for establishment of 15 Lac Liters per
year capacity Mustard Oil Extraction Plant at
Hilsa, Nalanda in Partnership.
0.48 14 08-Jun-10 - -
8
100 M/S Shree Shree Dwarikaji Agro Pvt. Ltd, Patna City, Patna. Proposal for establishment of 60,000 MT per
year capacity Soya Oil and Soya Nugget
production unit at Nagla, Malsalami, Patna
City.
25.8 157 27-Jul-11 - -
101 M/S Suman Agritech Pvt. Ltd, Indore Establishment of Vegetable Refined Oil and
Inter-esterification unit and Bakery fat at
Kulaharia, Ara
120 250 20-Jul-09 19-Dec-09
102 M/s Oil Tech Pvt. Ltd., Prakash Chandra Rastogi, C-110/7,
I.I.T., Kanpur, U.P.
Establishment of Solvent Extraction Plant at
Kaimur District
59.75 150 20-Mar-06 - -
103 M/S Amit Oil Ltd., Allahabad Proposal for establishment of Solvent
Extraction Plant at Kaimur
7.5 57 25-Feb-08 25-Jul-08
104 M/S Ruchi Soya Industries Ltd, Mumbai (Company's revised
proposal for establishment of Bran/ Seed De-oiled Cake -
1,20,000 MTA, Vanaspati / Bakery Fats/ Interestified -90,000
MTA, Packaged Blended / Re
Establishment of Bran/ Seed De-oiled Cake -
1,20,000 MTA, Vanaspati / Bakery Fats/
Interestified -90,000 MTA, Packaged Blended /
Refined Oils-1,26,000 MTA , Expeller Oil- 18000
MTA, Textured Soya Prote
215 530 28-Sep-11 - -
105 M/S Lama Bear Organic Extract Ltd, Kaimur, Bhabhua Proposal for establishment of 55.33 MT per
year capacity Spice Oils and Oleoresin unit at
Mathura, Durgawati, Kaimur, Bhabhua.
16.1535 25 25-Feb-11 16-Aug-11
106 M/S Deepak Vegpro(P) Ltd., Bhabhua. (Cancelling the earlier
proposal approved on 25.02.11 for establishment of 18,000
MT per year capacity Mustard Oil, 24,000 MT per year
capacity RBD Palm Oil, 6000 M
Proposal for expansion/diversification of 24000
MT per year capacity Banaspati Ghee, 30000
MT per year capacity RBD Palm/Palmolien Oil
and 8400 MT per year capacity Soya Refined
Oil in the existing un
18.02 65 23-Feb-12 - -
107 M/S Jhunjhunwala Vanspati Ltd., Jhunjhunwala Bhawan, Nati
Imli, Varanasi(U.P)
Establishment of 225000 MT/A Refined Edible
Oil Plant at Dehri (Rohtas)
95 171 11-Jul-08 14-Aug-08
108 M/s Girdhari Murari Agro Food Products Pvt. Ltd. Rohtas 15,000 MT per year capacity Modern Rice Mill
unit at Noonsarai, Nokha Sasaram
2 21 13-Aug-12 - -
109 M/S Nandan Biomatrix Ltd., Hyderabad. Proposal for establishment of production unit
of 45,000 MT per year capacity of Crude
Jatropha oil under Public Private Panchayat
Partnership Model at Jhajaha and Jamui.
200 4576 28-Sep-11 - -
110 M/S Ambo Exports Ltd, Kolkata (Company's proposal
approved by SIPB on 16.11.09 for establishment of 100 MT
per day capacity Rice Bran Oil Extraction Plant at
Aurangabad Industrial Area has been amende
Establishment of 500 MT per day capacity Rice
Bran Oil Extraction Plant at Kahalgaon
Industrial Area, Bhagalpur
25 114 03-May-10 - -
111 M/s Shri Janki Food Grains Pvt. Ltd., Varanasi Proposal for establishment of 72000 MT per
year capacity Rice Bran Solvent Extraction
Plant at Kudra Kaimur.
16.8367 20 13-Mar-13 - -
112 M/S Amar Roller Flour Mills Pvt. Ltd., Chapra. Proposal for establishment of 100 MT per day
capacity of Flour Mill unit at Chapra(Saran).
5.17 39 28-Sep-11 - -
2677.6963 21143
1 M/S Harinagar Sugar Mills Ltd. West Champaran. Capacity expansion of Sugar Mill from 8500
TCD to 10000 TCD
39.96 2112 14-Aug-06 07-Sep-06
2 M/S New Swadeshi Sugar Mills, Narkatiaganj (Proposal for
capacity expansion of Distillery Plant in two phases form 30
KLPD to 60 KLPD and 60 KLPD to 100 KLPD has been
approved in SIPB Meeting on 18.05
Capacity expansion of Sugar Mill from 5000
TCD to 7500 TCD, capacity expansion of
Distillery Plant from 30 KLPD to 60 KLPD and 60
KLPD to 100 KLPD(in two phases) and 5 M.W.
Co-generation Plant.
107.4 728 18-May-09 30-Nov-06
3 M/S Maurya Sugar Pvt. Ltd., 47/B Sahadeo Mahato Marg, Sri
Krishna Puri, Patna- 800001
Setting up of 3500 TCD Sugar Mill, 120 KLPD
Distillery Plant & 16 MW Co-generation
Power Plant at Vill- Gurwalia Bishwash, Anchal-
Chanpatia, Dist.- W. Champaran.
241.95 330 24-Sep-07 23-Sep-08
4 M/S Hindustan Petroleum Corporation Ltd, Mumbai. Establishment of 3500 TCD Capacity of Sugar
Mill, 60 KLPD Capacity of Ethanol Plant and 20
MW Co-generation Plant at Lauriya, West
Champaran.
304.39 375 29-Jun-09 - -
5 M/s M.P. Chini Industries Ltd. , Majahaulia, West
Champaran. (Consent has been given for proposal of
extension of period till 31.12.2011 for 2nd phase capacity
expansion of Sugar Mill from 4300 TCD to
Capacity expansion of Sugar Mill from 3500TCD
to 5000 TCD.
24.35 565 08-Mar-10 15-Dec-06
6 M/S Tirupati Sugars Ltd, West Champaran. Proposal for modernisation and capacity
expansion from 2500 TCD to 5000 TCD in the
existing Sugar Mill at Bagaha, West
Champaran.
144.9 451 13-Aug-10 24-Mar-11
7 M/s Dhauladhar Impex Pvt.Ltd., F-1,Gorakh Nath Complex,
East Boring Road, Patna.
Establishment of Sugar Mill 3500 TCD and 50
KLPD Distillery Plant at Bettiah.
0 0 10-Jul-06 - -
8 M/S Maurya Sugar Pvt. Ltd., 47/B Sahadeo Mahato Marg, Sri
Krishna Puri, Patna- 800001
Setting up of 2500 TCD Sugar Mill & 15
MW Co-generation Power Plant at Chorma,
East Champaran.
157.93 330 13-Aug-07 05-Feb-08
TOTAL :-
Other food and edible products & preparations
9
9 M/S Globe Sugar Refinery Ltd, Berger House, 5th Floor, 129,
Park Street, Kolkata (Change of name of the company from
M/S Kamlapur Sugar Refinery Limited to M/S Globe Sugar
Refinery Ltd has been approv
Establishment of 8000 TCD Sugar Mill, 120
KLPD Ethanol Plant and 26 MW Co-generation
Plant at Sariatpur-Chakia, East Champaran
487.8 540 29-Oct-07 04-Mar-08
10 M/S Maurya Sugar Pvt. Ltd., Sri Krishna Puri, Patna-1 Setting up of 3500 TCD expendable up to 6000
TCD Sugar Complex at Kharkatwa, Dhonar
Devli, Ramgarhwa,EastChamparan
171.96 330 02-Jan-08 11-Mar-08
11 M/S India Greenfuel Pvt. Ltd., 241, Okhla Industrial Estate,
Phase- III, New Delhi- 110020
Establishment of 5000 TCD Sugar Mill, 175
KLPD Distillery Plant and 25 MW Bagasse based
Co-generation Plant at Khajooriya, Areraj, East
Champaran
240 325 11-Jul-08 - -
12 M/S Hindustan Petroleum Corporation Ltd, Mumbai. Establishment of 3500 TCD Capacity of
Integrated Sugar Mill, 60 KLPD Capacity of
Ethanol Plant and 20 MW Co-generation Plant
at Sugauli, East Champaran.
309.15 375 29-Jun-09 - -
13 M/S Vaidyanath Sugar Mills Pvt. Ltd, East Chamaran Establishment of 3500 TCD Sugar Mill and 12
MW Electric Co-generation Plant at Chakia,East
Champaran.
175 277 23-Nov-09 - -
14 M/S Prasad Refrigeration and Agro Industries Pvt. Ltd, East
Champaran.
Proposal for establishment of 2500 TCD
(expandable up to 5000 TCD) Sugar Mill and 5
MW Co-generation Plant at Sataha, Nauadih,
Paharpur, East Champaran.
129.33 205 27-Aug-10 - -
15 M/S Riga Sugar Co. Ltd., Netajee Subash Road, 2nd Floor,
Kolkata. (Consent has been given on proposal of extension of
period till 31.03.2011 for capacity expansion of existing
Sugar Mill to 5000 TCD i
Expansion of Sugar Mill from 3500 TCD to 5000
TCD, 7.7 Megawatt Co-generation Plant and 50
KLPD Distillery at Sitamadhi
37.98 739 25-Feb-11 07-Nov-06
16 M/S Riga Sugar Company Ltd, Kolkata. Proposal for capacity expansion from 5000 TCD
to 6000 TCD in the existing Sugar Mill at Riga,
Sitamarhi.
17 628 26-Mar-12 - -
17 M/s Rajshree Sugars and Chemicals Ltd., Coimbatore. Establishment of 5000 TCD Sugar Mill, 30 MW
Co-generation Plant and 60 KLPD Distillery
Plant at Marukia, Madhubani.
238.5 1500 22-May-06 11-Jul-06
18 M/s Dhampur Sugar Mills , 221 Okhla Industrial Estate, Phase-
III, New Delhi.
5000 TCD Sugar Mill,60KLPD Distillery and
30M.W Co-generation Plant at Udakishunganj,
Madhepura
185 500 24-Jul-06 10-Aug-06
19 M/S P & M Infrastructure Pvt. Ltd., 47/B , Shri Krishna hna
Puri, Patna.
Establishment of 3500 TCD Sugar Mill and 12
MW Co-generation Plant at Vill.- Sitanabad,
Block- Simri Bakhtiyarpur, Dist.- Saharsa.
108.68 200 04-Dec-06 06-Feb-07
20 M/s Riga Sugar Co. Ltd., Kolkata. E-mail: dhanukas
@cal2.vsnl.net.in
2500 TCD to 5000 TCD Expandable (within
three years) Sugar Mill and 15 Megawatts Co-
generation Plant at Nayagaon, Darbhanga
161.46 400 06-Nov-06 09-Jan-07
21 M/S Tirhut Industries Ltd, New Delhi. Proposal for establishment of 5000 TCD
capacity Integrated Sugar Mill, 60 KLPD
Distillery Plant and 28 MW Co-generation
Power Plant at Ryam, Keoti, Darbhanga.
313.4 526 27-Jul-11 - -
22 M/s Rajshree Sugars and Chemicals Ltd., Coimbatore. Establishment of 5000 TCD Sugar Mill, 60 KLPD
Distillery and 30 M.W Co-generation Plant in
Muzaffarpur Distt.
242.5 500 24-Jul-06 10-Aug-06
23 M/S Balmukund Lease -Fin(P) Ltd., Exhibition Road, Patna. 5000 TCD Sugar Mill 60 KLPD Alcohol Plant
& 26 M.W. Power Plant at Nariar, Baruraj,
Muzaffarpur.
202.65 1500 14-Aug-06 10-Oct-06
24 M/S Vaishali Kisan Uday Sugar Mills Pvt. Ltd., Patna.
(Consent has been given for establishment of 1400 TCD Gur
Khandsari unit at Tarwa, Majhaulia, Chochahi Chapra
Panchayat, Anchal-Paru, Muzaffarpur
Proposal for establishment of 5000 TCD Sugar
Mill, 72 KLPD Ethanol Plant and 26 MW Captive
Power Plant at Vill.- Chochahi-Chapra, Anchal-
Paru, Muzaffarpur. (Proposal for starting of
500 TCD Mini Suga
177.7717 590 11-Aug-10 13-May-08
25 M/S Shirdi Foods Pvt. Ltd, Muzaffarpur. Proposal for establishment of 1650 MT per
year capacity Sugar Candy Manufacturing and
Packing unit at Bela Industrial Estate,
Muzaffarpur.
1.1965 17 29-Nov-10 05-Feb-12
26 M/s Bharat Sugar Mills, Singhwalia, Gopalganj. Expansion of Sugar Mill from 2500 TCD to 5000
TCD and 15 M.W Co-generation Plant
137 0 01-Aug-06 15-Sep-06
27 M/s Vishnu Sugar Mills Ltd., Gopalganj. Capacity expansion of Sugar Mill from 5000
TCD to 7500 TCD.
41 0 26-Sep-06 02-Dec-06
28 M/s Indian Glycols Ltd.,C-124, Okhla Industrial Area, Phase-1,
New Delhi.
10000TCD-Sugar Mill and 96000 KL /A Distillery
and 20 MW- Co-generation Plant at Rasulpur,
Ekma, Saran.
550 317 10-Jul-06 17-Aug-06
29 M/S J.H.V Distilleries & Sugar Mills Limited, Marhowraowrah,
Saran(Chapra)
Establishment of 6000 TCD Sugar Mill , 25 MW
Co-generation Plant at Marhowrah, Dist.-
Saran (Chapra)
172.54 450 04-Dec-06 06-Feb-07
30 M/S Hasanpur Sugar Mills, Hasanpur Road, Samastipur. Expansion of Sugar Mill First phase - 1750 TCD
to 3000 TCD.(Investment-Rs99.094 Crores)
Second phase- 3000 TCD to 5000
TCD.(Investment-Rs 50.956 Crores)
150.05 532 23-Oct-06 05-Jan-07
10
31 M/S G.M.R. Industries Ltd., Hyderabad, Andhra Pradesh. Pin-
500016
Proposal for establishment of 2500 TCD sugar
mill(Expandable up to 10000 TCD),18
Megawatt Co-generation Plant and 45 KLPD
Distillery Plant at Samastipur
220 340 13-Nov-06 - -
32 M/s Jay Mangla Sugar & Power Pvt. vt. Ltd., B-41,Jagat
Amrawati Apartment, Bailey Road, Patna.
5000 TCD Sugar Mill, 60 KLPD Distillery and 28
M.W Co-generation at Bahadurpur, Begusarai
196.59 200 24-Jul-06 10-Aug-06
33 M/S Kamlapur Sugar & Industries Ltd., Kolkata. 8000 TCD Sugar Mill, 120 KLPD Distillery Plant
& 26 M.W. Power Plant at Vill- Barhan-
Benusar-Bormamukund Block,Dist. Siwan.
487.8 450 07-Aug-06 17-Oct-06
34 M/S Kamlapur Sugar & Industries Ltd., Kolkata. 8000 TCD Sugar Mill, 120 KLPD Distillery Plant
& 26 M.W. Power Plant at Vill-Eraji,
Orhara-Dhoni, Block-Rajaun,Dist.-Banka.
487.8 450 07-Aug-06 17-Oct-06
35 M/S S.B. Sugar Ltd., Kolkata. Establishment of 2500 TCD (Expandable up to
5000 TCD) Sugar Mill, 30 KLPD Alcohol Plant
& 8 M.W. Co-generation Plant at
Asthawan, Nalanda.
122.4 370 28-May-07 30-Aug-06
36 M/S Suprabhatam Sugar Industries Pvt. Ltd., 104-22 Gaurav
Tower, P.V.R. Sonia Complex, Vikash Puri, New Delhi.
Establishment of 5000 TCD Sugar Mill, 30 KLPD
Ethanol Plant and 8 MW Co-generation Plant
at Vill.-Kopa Kola, Danapur, Patna.
230 210 04-Dec-06 18-Jan-07
37 M/S Classicon Ventures Limited, Pro.-Sri Deepak Kumar
Sinha/ Sri Rajiv Ranjan, 190/A , Boring Road, Patna, Email:-
sksinha_ritco @yahoo.co.in
Establishment of 500 TCD Sugar Mill with Co-
generation Power Plant at Kaabh/Ayan Khan,
Dist.-Patna.
13.266 132 26-Feb-07 21-May-07
38 M/S Pearl Processing Industries, Patna. Proposal for establishment of 4125 MT per
year capacity of Sugar Cube and Candy
production unit in partnership at Mohali Road,
Karmalichak, Agamkuan, Patna City, Patna.
2.38 16 28-Sep-11 - -
39 M/S Kumar Industries, Darbhanga Proposal for establishment of 150 MT per year
capacity Noodle Production unit at Industrial
Area, Bela, Darbhanga in proprietorship.
0.1681 10 19-Apr-10 - -
40 M/S Shri Sai Nath Enterprises, Muzaffarpur. Proposal for establishment of production unit
of 480 MT per year capacity of Vermicelli,
Noodles, Disco Chips and Finger Chips in
proprietorship at Industrial Area, Bela,
Muzaffarpur.
0.8235 9 28-Sep-11 - -
41 M/S Peerage Buildtech Pvt. Ltd, New Delhi. Proposal for establishment of 8400 MT per
year capacity Noodle production unit at
Industrial Area, Hajipur.
6.16 62 29-Jun-10 - -
42 M/S Swadist Udyog, Bhagalpur. Proposal for establishment of production unit
of 804 MT per year capacity of Masala,
Vermicelli and Papad in proprietorship at
Industrial Area, Barari, Bhagalpur.
0.6656 23 28-Sep-11 - -
43 M/S Shakshi Industries, Bhagalpur. Proposal for establishment of 900 MT per year
capacity Noodles and Vermicelli production
unit in Proprietorship at Bhagalpur.
0.4013 20 23-Feb-12 - -
44 M/S Sano Foods Pvt. Ltd, Mumbai. Proposal for establishment of 3434 MT
capacity production unit of Vermicelli and
Macroni at Danapur, Patna.
13.39 28 21-Dec-09 - -
45 M/S Kesho Food and Beverage Pvt. Ltd, Patna Proposal for production of 11,500 MT per year
capacity Noodles, Sauce, Ketchup and Pickles
at Parsa Bazar, Patna.
2.9445 60 26-May-11 05-Feb-12
46 M/S Aditya Food Products, Patna. Proposal for establishment of 420 MT per year
capacity Noodles production unit in
proprietorship at Kurji, Patna.
0.5 21 23-Feb-12 - -
47 M/S Mahavir Grih Udyog, Patna. Proposal for establishment of 180 MT per year
capacity Vermicelli production unit in
partnership at New Harnichak (Tej Pratap
Nagar), Anisabad, Patna.
4.68 6 23-Feb-12 - -
48 M/s Bohra Sales & Service Ltd. Ranchi 900 MT per year capacity Vermicelli and
Noodles unit at Fatuha, Patna
1.2856 18 13-Aug-12 - -
49 M/s Shakambhari Agro Foods Industries, Patna City, Patna 1200 MT per year capacity Fryums and Soya
Bari production unit in partnership at
Bharatpur Simli Patna City, Patna.
2.0327 34 18-Sep-12 - -
50 M/S Sushila Food Product, Gaya. Proposal for establishment of 900 MT per year
capacity Vermicelli, Chowmien, Gold Finger
and Fryums industry at Bhagwanpur, Baiju
Bigaha, Gaya in partnership.
1.04 15 13-Aug-10 - -
51 M/S Jagat Bakers, Katihar. Proposal for establishment of 90,000 Loaves,
1,06,200 Buns, 90,000 Rusk and 468600
Biscuits/Cookies per year capacity Bakery Plant
in proprietorship at Industrial Area, Katihar.
0.468 31 23-Feb-12 - -
11
52 M/S Lavanya Finvest Pvt Ltd, Muzaffarpur. Proposal for establishment of 36,000 MT per
year capacity Pale-G and Pare Namkin Biscuit
production unit at Industrial Area, Bela,
Muzaffarpur.
22.7 434 29-Jun-10 27-Feb-11
53 M/s Bihariji Flour Mills (P) Ltd., Patna City. Establishment of 1500 Tons/Month Parle-G
Biscuit in collaboration with Parle Biscuit (P)
Ltd. at Hajipur Industrial Area.
8.55 208 06-Sep-06 22-Oct-06
54 M/S Bansal Biscuits Pvt. Ltd, Kolkata (Amending the proposal
approved on 21.12.09 for establishment of 12,600 MT per
year capacity Biscuits production unit at EPIP, Hajipur,
approval has been given fo
Proposal for establishment of 36000 MT per
year capacity Biscuit production unit at EPIP,
Hajipur Industrial Area.
50.57 328 26-May-11 25-May-10
55 M/S Britannia Industries Ltd, Bangalore(Karnataka) Proposal for establishment of 50,000 MT per
year capacity Bakery Product and production
of Biscuit at E.P.I.P., Hajipur.
55 330 19-Apr-10 27-Feb-11
56 M/S Sona Biscuits Ltd, Kolkata Proposal for establishment of 15000 MT per
year capacity Biscuit production unit at E.P.I.P.,
Hajipur.
26.51 219 13-Aug-10 - -
57 M/S A FP Manufacturing Company Pvt. Ltd, New Delhi. Proposal for establishment of production unit
of 20,000 MT per year capacity Namkin, Bakery
and Extruded Snacks in unit-1 and unit-2 at
E.P.I. P., Hajipur.
33.043 142 23-Feb-12 - -
58 M/s Sona Biscuits Ltd., Kolkata. Proposal for capacity expansion of 8000 MT
per yera capacity expansionin the existing
Biscuit unit of 15000 MT per year capacity at
Industrial Area, Hajipur.
20.2019 35 08-Feb-13 - -
59 M/S Ambo Agro Products Ltd, Kolkata Establishment of 200 TPD Refined Edible Oil,
2.5 MW Captive Power Plant, 200 TPD Rice Mill
and 150 TPD Flour Mill at Bhagalpur / Patna/
Begusarai
84 200 17-Aug-09 - -
60 M/S Ambo Exports Ltd, Kolkata Proposal for establishment of 35 MT per day
capacity Biscuit production unit at Kahalgaon
Industrial Area, Bhagalpur.
17.5 204 23-Mar-10 - -
61 M/S Nalanda Biscuit Company Ltd, Khagaul Road, Nayatola,
Phulwarisharif, Patna
Proposal for capacity expansion of existing
Biscuit manufacturing unit at Phulwarisharif
from 10,750 MT per year to 16,750 MT per
year.
3.38 269 09-Feb-09 - -
62 M/S Ganapati Biscuits Pvt. Ltd, Patna City Establishment of Biscuit Manufacturing Unit at
Bankaghat, Patna City
14.85 300 20-Jul-09 13-Dec-09
63 M/S Astha Confectioneries Pvt. Ltd., Patna. Proposal for establishment of 10,71,900 Kg.
per year capacity Slice Bread and Cake
production unit at Industrial Area, Fatuha,
Patna.
1.1464 25 11-Jun-12 - -
64 M/S Sai Sharan Foods, Patna. Proposal for establishment of 6720 Loaves per
day, 2520 Rusk per day and 336 Kg.
Biscuit/Cookies per day capacity production
unit in partnership at Dariyapur, Neura, Patna.
0.9954 41 11-Jun-12 - -
65 M/S JKM Beverages Ltd., New Delhi. Proposal for establishment of 2.5 lakh
Hectoliters per year Biscuit Plant at Jagdishpur,
Bhojpur.
61.95 88 11-Jun-12 - -
66 M/S Swastika Bakers, Gaya. Proposal for establishment of production unit
of Bakery Product in proprietorship at Dubhal,
Gaya.
0.9184 2 09-Apr-12 - -
67 M/S Radhe Shyam Cold Storage & Foods Pvt. Ltd,
Gajipuripur, Uttar Pradesh.
Establishment of Fruit Pulp and Juice Plant
with annual capacity of 17,500 MT at Industrial
Area, Pandaul, Madhubani.
9.61 148 29-Aug-09 13-Dec-09
68 M/S Parmeshwari Aqua Pvt. Ltd., Madhubani. Proposal for establishment of 96 Lakh Litres
per year capacity of Packaged Juice, Areated
Fruit Drinks, Drinking Water and Soda Water
unit at Industrial Area, Pandaul, Madhubani.
1.0381 21 28-Sep-11 - -
69 M/S Anubhav Agro Processing Pvt. Ltd, Patna. Proposal for establishment of 500 MT per year
capacity Fruit and Vegetable Processing unit at
Baghikariho, Supaul.
0.5117 15 12-Jan-11 - -
70 M/S Amrapali Biotech India Pvt. Ltd., Gaziabad(U.P.). Proposal for establishment of 6000 MT per
year capacity Fruit and Vegetable Processing
and Canning unit at Maranga Industrial Area,
Purnea.
17.0712 120 23-Feb-12 - -
71 M/S Stef Medical Care India Pvt. Ltd., New Delhi. Proposal for establishment of 01 MT per hour
capacity Fruit and Vegetables Processing unit
at Industrial Area, Maranga, Purnea.
2.4561 23 23-Feb-12 - -
72 M/S Okpet Construction & Services Pvt. Ltd, Patna. Establishment of 600 MT/Kilo Litre per year
Fruit Pulp and Juice Processing unit at Simri,
Darbhanga
1.1291 21 07-Dec-09 - -
73 M/S Amrapali Agro Foods Pvt. Ltd., Ujjawal, 2nd Floor, Bailey
Road, Patna
Proposal for establishment of Fresh Fruits and
Vegetable Unit at Muzaffarpur
2.253 228 25-Feb-08 04-Jun-09
74 M/S Shyam Agro Foods & Exports Pvt. Ltd, Muzaffarpur Establishment of 650 MT per year capacity
Ultra Modern Fruit and Vegetable Processing
unit at Industrial Area, Bela, Muzaffarpur.
4.96 70 04-Jan-10 20-Feb-11
12
75 M/S Himalayan Vegefruit Ltd, Chandigarh. Proposal for establishment of 2000 MT per
year capacity Fruit Processing unit at Industrial
Estate, Muzaffarpur.
18 150 29-Jun-10 - -
76 M/S Supermax Foods Pvt. Ltd, Dwarka, New Delhi. Proposal for establishment of 2.34 MT per year
capacity Fruit and Vegetable Processing unit at
Radhanagar, Mushari, Muzaffarpur.
0.297 20 12-Jan-11 08-Jan-12
77 M/S Unique Foods, Promoter- R.K. Agri Biz, LLP, Muzaffarpur Proposal for capacity expansion of existing unit
of Frozen / Aseptic Products, Ready to Drink
and Processed Fruits from 4958 MT per year
capacity to 9108 MT per year capacity at Rewa
Road, Patahi, Muz
14.2506 70 23-Feb-12 - -
78 M/S Shashibhushan Agro Pvt. Ltd., Patna. Proposal for establishment of Food Processing
unit for production of 3000 MT per year
capacity of Fruit, Jam, Jelly, Tomato Ketchup,
Pickles, Ginger, Garlic Paste, RTS Beverage,
Squash, Candy/Murabba
1.9275 15 16-Apr-12 - -
79 M/s Laheji Freezing House Pvt. Ltd., Siwan 9600 MT Fruit Pulp Processing unit under
R.A.B.C at Laheji.
13.4312 55 28-Nov-12 - -
80 M/S Dhanuka Pesticides Limited, New Delhi. Establishment of Fruit and Vegetable Centre
and Packaging Centre on Hajipur-Muzaffarpur
High-way
0 0 27-Nov-06 - -
81 M/S Dhanuka Pesticides Limited, New Delhi. E-mail:
[email protected] Website:www.dhanuka.com
Setting up of a Fully Integrated Fruit and
Vegetable Processing Complex at Hajipur in
two phases
55 200 20-Dec-06 - -
82 M/S Amrapali Foods Limited, Ujjwal, II Floor, Opposite
Planetarium, Bailey Road, Patna
Proposal for expansion and Modernisation of
Fruits and Vegetable Processing Unit at Hajipur
Industrial Area.
2.28 15 17-Mar-08 31-May-08
83 M/S Aasma Foods & Beverages Pvt. Ltd., Patna. Establishment of Fruit & Vp; Vegetable
Processing unit with the capacity of 2500 MTA
at EPIP, Hajipur.
1.1 72 19-Oct-09 11-Feb-10
84 M/S Vaishali Fresh Fruits and Vegetables Pvt. Ltd, Patna. Proposal for capacity expansion from 2500 MT
per year capacity to 7500 MT per year capacity
in the existing unit of Fresh Fruits and
Vegetable Processing at Industrial Area,
Hajipur.
0.7517 28 27-Jul-11 - -
85 M/s Mahua Co-operative Cold Storage Ltd. Mahua, Vaishali 1 MT per hour Frozen Item-Fruits and
Vegetable unit at Kariho, Mirjanagar, Mahua,
Vaishali
24 0 13-Aug-12 - -
86 M/s Nath Consumer Products Pvt. Ltd., Hajipur Proposal for capacity expansion of 3600 MT
per year capacity in the existing Fruit and
Vegetable processing unit at Industrial Area,
Hajipur.
3.0429 23 08-Feb-13 - -
87 M/S Chanakya Foods India Pvt. Ltd, Patna. Proposal for establishment of 9000 MT per
year capacity Turmeric & Ginger
Processing unit, Ginger Garlic Paste
Manufacturing unit, Spice Grinding and
Packing unit, 10 Thousand MT capacity of Multi
8.45 60 29-Nov-10 10-Apr-12
88 M/S Riya Chakraborty Food Processing Pvt. Ltd, Bhagalpur. Proposal for establishment of 01 MT per hour
capacity Fruit Processing Unit and Tomato
Juice Plant at Industrial Area, Barari,
Bhagalpur.
0.99 20 03-May-10 - -
89 M/S Amrapali Biotech India Pvt. Ltd, Gaziabad, U.P.
(Company's proposal approved by SIPB on 08.03.10 for
establishment of 2779 MT per year capacity Pickles and Corn
Flakes unit at Industrial Area, Bel
Establishment of 8825 MT per year capacity
Tomato Ketchup, Pickles, Jam and Jelly and
Corn Flakes unit at Chabilapur, Rajgir
17.37 119 21-Jul-10 04-Feb-11
90 M/S Mor Mukat Marketing Pvt. Ltd, New Delhi. Proposal for establishment of 150 BPM
capacity RTS Juice Plant unit at Nasriganj,
Danapur, Patna.
7.299 40 27-Jul-11 30-Sep-11
91 M/S JRN Enterprises Pvt. Ltd., New Delhi. Proposal for establishment of 360 MT per year
capacity of Pickles manufacturing unit and
16,500 MT per year capacity of Besan
manufacturing unit at Industrial Area, Fatuha,
Patna.
1.7754 24 28-Sep-11 27-Feb-12
92 M/S Prabhakar Organics & Agro Foods Pvt. Ltd., Patna. Proposal for establishment of 903 MT per year
capacity Sauce, Jam, Jelly, Pickles, Custard,
Baking Powder and Food Grade Colour
Production unit at Industrial Area, Fatuha,
Patna.
1.3165 57 23-Feb-12 - -
93 M/S Sunasi Food and Beverages Pvt. Ltd, Patna. Proposal for production of 60 Lac Liters per
year capacity Fruit Juice at Industrial Area,
Giddha, Ara.
2 70 24-May-10 - -
94 M/S Krishna Food & Beverage Industries, Noida, U.P. Proposal for establishment of 1200 MT per
year capacity Fruits Vegetables and Cereals
Processing and Health Drinks production unit
in proprietorship at Industrial Area, Giddha,
Bhojpur.
1.3197 28 11-Jun-12 - -
13
95 M/S Parwati Buildtech Pvt. Ltd., Gaya. Proposal for establishment of 7500 MT per
year capacity Pack House for Fruits and
Vegetable under R.A.B.C. at Sadar Gaya,
Chandauli.
2.4175 15 11-Jun-12 - -
96 M/s Reliance Marts Pvt. Ltd. Gaya. 1200 MT per year Capacity Fruits, Vegetable
Processing and Preservation unit at Industrial
Area, Bodhgaya, Gaya.
3.7312 42 28-Nov-12 - -
97 M/S Suman Grih Food Products Pvt. Ltd, Bhagalpur. Proposal for establishment of 300 MT per year
capacity production unit of different types of
Papad at Sultanganj Bazar, Bhagalpur.
0.9441 15 27-Jul-11 - -
98 M/s Dynamic Tarang Pvt. Ltd. Ranchi 10 MT per year capacity jaggery and allied
Food Product unit at Industrial Area, Barari,
Bhagalpur
1.8723 20 18-Sep-12 - -
99 M/S Gayatri Soya Food Products, Patna. Proposal for establishment of Production unit
of 960 Liter per day capacity Soya Milk and
Paneer at Phulwarisharif, Patna
0.51 17 15-Feb-10 02-Dec-11
100 M/s Shri Ashutosh Securities Pvt. Ltd. Panta
M/s Shri Ashu
Multiplex and Food Court unit in the name of
Rendezvous at Arya Kumar Road, Rajendra
Nagar, Patna
8 65 13-Aug-12 - -
7698.0644 22558
1 M/S AKS Fashion News Pvt. Ltd, Patna. Proposal for establishment of 900 MT per year
capacity Banana & Bamboo Fiber Yarns
unit at Hajipur.
2.06 120 21-Jul-10 - -
2.06 120
1 M/s Harinagar Sugar Mills Ltd., Harinagar, W. Champaran.
(Proposal has been rectified from 45 KLPD Distillery Plant to
Distillery Plant for production of 45 KLPD Ethanol/50 KLPD
Total Spirit)
Establishment of Distillery Plant for production
of 45 KLPD Ethanol/50 KLPD Total Spirit.
45 89 29-Sep-08 22-Oct-06
2 M/S Kumar Sunil Enterprises Pvt. Ltd, Bettiah. Proposal for establishment of 40 Lac Liters per
year capacity Fruit based Beverage Juice, 120
Lac Liters per year capacity Beverage Packaged
Drinking Water and 10 Lac Liters per year
capacity Soda Wat
3.93 40 29-Nov-10 - -
3 M/s Harinagar Sugar Mills Ltd., Harinagar, W. Champaran. Proposal for diversification of existing 13,500
Kilo Litre per year capacity of Distillery Plant
for Extra Neutral Alcohol production unit of its
same capacity at Harinagar, Bagha, East
Champaran.
12 87 28-Sep-11 - -
4 M/S S.S. Infrastructure Pvt. Ltd., Darbhanga. Establishment of Ethanol Plant from 2500 TCD
Sugarcane Juice at Sukhait, Block- Jhanjharpur,
Dist.- Madhubani.
95.04 120 19-Mar-07 21-May-07
5 M/s Tirhut Industires Ltd., Pandaul Madhubani. 2.5 Lac Hecto Liter per year capacity Brewery
Plant unit at Sakri, Pandaul, Madhubani
110.7405 80 28-Nov-12 - -
6 M/s Bihar Co-operative Sugar Mill Federation Ltd., Patna. 5000TCD Sugar Mill, 30 KL Ethyl Alcohol Plant,
28 MW Co-generation Plant at Supaul.
180 846 20-Sep-06 08-Nov-06
7 M/S Braj Industries Pvt. Ltd., P.O- Sadanandpur, Dist.-
Begusarai-851211
Proposal for establishment of 180 Kilo Litter
Per Day Ethanol Production Plant from
Sugarcane Juice at Supaul.
82 120 26-Mar-07 - -
8 M/S Braj Industries Pvt. Ltd., P.O- Sadanandpur, Dist.-
Begusarai-851211
Proposal for manufacturing of 190 Kilo Litter
per Day Ethanol from Sugarcane Juice at
Purnea
82 120 15-Jan-07 - -
9 M/S IPL Sugar & Allied Industries Ltd., New Delhi. Proposal for modernization and capacity
expansion from 1219 TCD capacity to 3500 TCD
capacity, 46 KLPD Distillery Plant and 20 MW
Co-generation Plant in the existing Sugar Mill
at Motipur, Muzaffarpur
257 413 28-Sep-11 - -
10 M/S Vishnu Sugar Mills Ltd., Gopalganj. Proposal for establishment of 45 KLPD
Distillery Plant and 15 MW Co-generation Plant
in factory situated at Gopalganj
94.06 400 13-Nov-06 26-Dec-06
11 M/S Jain Agro Distilleries Pvt Ltd., 306, Akash Deep Building,
26-A, Barakhamba Road, New Delhi-110001
Establishment of 45 KLPD Distillery Plant at
Bighaijaghish, Tehsil-Hathua(Mirganj,
Gopalganj (Cancelling earlier approved place
which was at Chitauli, Siwan and new place as
Bighaijaghish, Tehsil-Hath
29.69 100 29-Sep-08 11-Feb-10
12 M/S Sona Sati Organics Pvt. Ltd., Patna. Proposal for establishment of 60 KLPD
Molasses Based Distillery and 1.5 MW Co-
generation Power Plant at Rajpatti Kothi,
Rajpatti, Gopalganj.
88.95 64 28-Sep-11 18-Dec-11
13 M/S Celebrity Liquors Pvt. Ltd., Patna. Proposal for establishment of 5 Lakh
(expandable up to 10 Lakh) Hecto Litre per
year capacity Beer production unit at
Bhagwanpur, Vaishali.
135.12 170 23-Feb-12 - -
TOTAL :-
Products of Horticulture incl. Tissue culture; hydroponics and Forestry
TOTAL :-
Beverages, Tobacco and Pan Masala
14
14 M/S Globus Spirits Ltd., New Delhi. Proposal for establishment of green based 120
K.L.P.D. Distillery Plant, Country . Distillery
Plant and I.M.F.L. production unit at
Andhrabar Chowk, Panapur, Vaishali.
160 88 11-Jun-12 - -
15 M/s Rozario Beverages Pvt. Ltd. West Bengal. 60,000 litre Per day capacity Distillery unit at
Bhagwanpur, Vaishali
89.677 0 18-Sep-12 - -
16 M/S Braj Industries Pvt. Ltd., P.O- Sadanandpur, Dist.-
Begusarai-851211
Proposal for manufacturing of 190 Kilo Litter
per Day Ethanol from Sugarcane Juice at
Sahpur-Kamal(Dist.-Begusarai)
82 120 15-Jan-07 21-May-07
17 M/S SCI India Ltd, Bhagalpur. Proposal for establishment of grain based
Alcohol Plant in place of Molasses based
Distillery Plant and Modernization of existing
effluent treatment Plant to get zero pollution
in existing unit and ge
30.2316 0 25-Feb-11 - -
18 M/S M J & Sons Distillery & Breweries Private Ltd.,
Jankivilla, Near Pushpanjali Plaza , Vasant Vihar Colony,
Boring Rd., Patna-1
Setting up of Extra Neutral Alcohol Plant based
on food grains at Amarpur, Banka.
36.7 375 07-May-07 09-Oct-07
19 M/s M.J & Sons Distillery & Breweries Pvt. Ltd. Banka 150000 H.L.P.A. capacity Brewery Plant unit at
Raghunathpur, Banka
54.52 75 18-Sep-12 - -
20 M/S Archi Breweries Pvt Ltd, Birchand Patel Marg, R Block,
Patna
Proposal for establishment of Beer Plant with
capacity of 1 lakh HLPA at Parew, Bihta, Patna.
9.63 45 16-Dec-08 - -
21 M/S United Breweries Ltd, Bangalore, Karnataka (U B Group) Proposal for establishment of 10 lac Hecto
Liter per year capacity Beer production unit at
Kopakala, Naubatpur, Patna.
200 294 26-May-11 - -
22 M/S Wave Distilleries and Breweries Ltd., New Delhi. Proposal for establishment of 5 Lakh
HLPA(Hectolitre per day) capacity Beer
production unit in Bihar.
121.14 375 23-Feb-12 - -
23 M/S Iceberg Industries Ltd., Patna. Proposal for capacity expansion in the existing
unit from 168000 Hectoliter to 326000
Hectoliter for production of Beer in phase-1
and phase-2 at Bihta, Patna.
40.05 70 16-Apr-12 - -
24 M/S Bihar Distillers & Bottlers Pvt. Ltd., Chandigarh.
(Earlier on 26.05.11 approval was given for establishment of
330 KLPD capacity of Distillery Plant for production of ENA,
RS, IMFL, Country L
Proposal for establishment of 660 KLPD
capacity of Distillery Plant for production of
ENA, RS, IMFL, Country Liquor, Industrial
Alcohol, Absolute Alcohol at Bhojpur.
230 140 10-Apr-12 - -
25 M/S Carlsberg India Pvt. Ltd., Haryana. Proposal for establishment of production unit
of 10 Lakh Hecto Litre per year capacity of Beer
at Koilwar, Bhojpur.
140 600 28-Sep-11 - -
26 M/S Iceland Beverages Pvt. Ltd., Patna. Proposal for establishment of 30 Lacs Litres per
year capacity IMFL production unit at Giddha
Industrial Area, Bhojpur.
2.5226 37 23-Feb-12 - -
27 M/S Indian Gasohol Ltd., Erode, Tamilnadu Proposal for establishment of ten units of
100% export oriented Ethanol Plant of total
Capacity 5.4 million tons from sugarcane juice
at 1. Nawanagar(Buxar) 2. Bikaramganj(Rohtas)
3. Between Gaya and
13557 50000 06-Nov-06 05-Jan-07
28 M/S Symbiosis Electronics Pvt. Ltd., Patna. Proposal for establishment of 1,50,000 Hecto
Litre per year capacity Beer Plant at Amjhour,
Old PPCL, Dehri-on-Sone, Rohtas.
63.6425 82 23-Feb-12 - -
29 M/S Khushi Beverages Pvt. Ltd., Gaya. Proposal for establishment of 80 Lakh Liters
per year capacity Fruit based Beverage and
Carbonated Fruit Juice unit at Manpur,
Buniyadganj, Gaya
2.3878 33 23-Feb-12 - -
30 M/S Aqua Honey Industries, Darbhanga. Proposal for establishment of 72 lac liters per
year capacity Packaged Drinking Water unit at
Donar Industrial Area, Dharbhanga in
partnership.
0.6896 24 11-Aug-10 - -
31 M/S Saumya Industries, Darbhanga. Proposal for establishment of 45 Lac Liters per
year capacity Packaged Drinking
Water/Mineral Water unit in proprietorship at
Bela Industrial Area, Darbhanga.
1.0028 25 29-Nov-10 - -
32 M/S Mishti Raj Foods Pvt. Ltd, Muzaffarpur. Proposal for establishment of 2600 Kilo Liter
per year capacity Packaged Drinking Water
unit at Industrial Area, Bela, Muzaffarpur.
1.3227 19 29-Nov-10 - -
33 M/S J. K. Aqua Industries, Muzaffarpur. Proposal for establishment of 120 Lac Liters
per year capacity Packaged Drinking Water
unit at Banaras Bank Chowk, Muzaffarpur in
proprietorship.
0.98 10 29-Jun-10 - -
34 M/S S.S.K. Enterprises, Muzaffarpur. Proposal for establishment of 2000 Liters per
hour Packaged Drinking Water at Shyambabu
Road, Andigola, Muzaffarpur in proprietorship.
0.9177 22 11-Aug-10 - -
15
35 M/S Parwati Beverages and Foods Pvt. Ltd., Siwan. Proposal for establishment of 9720000 Liters
per year capacity Packaged Drinking Water
unit at Orma Mukund, Mufasil Siwan.
1.189 15 26-Mar-12 - -
36 M/S Royal Manucon Pvt Ltd, Hajipur(Vaishali). (Earlier on
08.06.10 approval was given for establishment of 120 Lac
Liters per year capacity Packaged Drinking Water unit at
Industrial Area, Hajipur. Ag
Proposal for establishment of 120 Lac Liters
per year capacity Packaged Drinking Water, 5
Lakh Cartoons per year Soda Water (24x600
ml. in one Cartoon) and 2,16,000 Pieces per
year capacity Pet Jar pr
1.548 51 26-Mar-12 - -
37 M/S Devlok Agro and Beverages Pvt. Ltd, Patna. Proposal for establishment of 96 Lac Liters per
year capacity Packaged Drinking Water unit at
Hajipur.
1.58 32 29-Nov-10 - -
38 M/s Dayal Products Pvt. Ltd. Hajipur, Vaishali 105.60 Lakh litres per year capacity packaged
Drinking Water unit at Industrial Area, Hajipur,
Vaishali
1.2421 11 18-Sep-12 - -
39 M/s Vivek Vinayak Foods Pvt. Ltd. Hajipur 97,20,000 litres per year capacity Packaged
Drinking Water unit at Hajipur, Vaishali
1.0016 15 18-Sep-12 - -
40 M/S Shubham Consumer Product, Sabour, Bhagalpur. :Proposal for establishment of 72 Lacs Liters
per year capacity Drinking Mineral Water unit
at Industrial Area, Barari, Sabour, Bhagalpur in
proprietorship.
0.73 12 12-Jan-11 - -
41 M/S Mahabali Water Products, Biharsharif Proposal for establishment of 7200 Kilo Litre
per year capacity Packaged Drinking Water and
Soda Water unit in Partnership at Sosarai,
Nalanda.
1.6359 21 28-Sep-11 - -
42 M/S Aqua Tech Industries, Keshrinagar, Patna Establishment of 60 Lakh Liter per year
Capacity Packaged Drinking Water Unit at Rajiv
Nagar, Patna
1.66 18 09-Nov-09 - -
43 M/S Prakash Udyog, Patna. Establishment of 1200 Kiloliter Fruit Drink,
12000 Kiloliter Packaged Drinking Water and
2400 Kiloliter Soda Water Production Plant at
Industrial Area, Patliputra, Patna.
2.52 25 01-Feb-10 - -
44 M/S Yashoda Enterprises Pvt. Ltd, Fatuha, Patna. Proposal for establishment of 3000 Liters per
hour capacity Packaged Drinking Water unit at
Fatuha Industrial Area, Patna.
1 24 23-Mar-10 - -
45 M/S Hindustan Coca-Cola Beverages Pvt. Ltd., Haryana Proposal for establishment of Coca Cola Green
Field Project for the production of Aerated
Drinks, Soft Drinks, other Non-alcoholic
Beverage, Fruit Juice/ Fruit Based Drinks and
Packaged Drinking Water
100 100 23-Mar-10 - -
46 M/S Maa Tara Water Products, Patna. Proposal for establishment of 120 Lac Liters
per year capacity Packaged Drinking Water
unit in partnership at Dashratha, Patna.
0.8522 24 24-May-10 - -
47 M/S Aquadolphin Solutions Pvt. Ltd, Patna. Proposal for establishment of 72 Lac Liters per
year capacity Packaged Drinking Water unit at
Babhanpura, Phulwarisharif, Patna.
1.0161 13 24-May-10 - -
48 M/S Mars Mountain Securities and Trade Pvt. Ltd, Fatuha Proposal for establishment of 75 lac liters per
year capacity Packaged Drinking Water unit at
Fatuha Industrial Area.
2.08 25 11-Aug-10 - -
49 M/S Lakhan Aqua Enterprises Pvt. Ltd, Patna. Proposal for establishment of 120 lac liters per
year capacity Packaged Drinking Water unit at
Khusrupur, Patna.
0.8546 15 11-Aug-10 04-Feb-11
50 M/S Ishwar Raj Beverages Pvt. Ltd, Patna. Proposal for establishment of 120 Lac Crates
capacity Soft Drinks and Packaged Drinking
Water unit at Jethuli, Fatuha, Patna.
15.2854 88 25-Feb-11 11-Sep-11
51 M/S Om Shri Laxminarayan Education Foundation Ltd., Patna Proposal for establishment of 120 lakh Litres
per year capacity of Packaged Drinking Water,
10 Lakh Litres per year capacity of Soda Water
and 40 Lakh Litres per year capacity of Fruit
based Beverage
15.8 100 28-Sep-11 - -
52 M/S Rambriksha Food and Beverage Pvt. Ltd., Patna Proposal for establishment of 97.92 Lakh Litres
per year capacity of Packaged Drinking Water
and Soft Drink unit at Pahari, Transport Nagar,
Patna.
0.683 66 28-Sep-11 - -
53 M/S Om Sai Ram Beverages and Food Pvt. Ltd, Patna. Proposal for establishment of production unit
of 72 Lakh Litres per year capacity Packaged
Drinking Water at Nandlal Chapra, Patna.
0.7 21 28-Sep-11 - -
54 M/S White Ocean Foods Pvt. Ltd., Patna Sadar, Patna. Proposal for establishment of 120 Lakh Litre
per year capacity Packaged Drinking Water at
Jakariyapur, Zero Mile, Pahari, Patna.
1 18 23-Feb-12 - -
16
55 M/S Vaibhavaa Communication and Assets Pvt. Ltd., Patna. Proposal for establishment of total 55 Safe
Drinking Water(Piao) in 42 different places of
Patna.
2.8875 55 26-Mar-12 - -
56 M/s Parhupatinath Distributors Pvt. Ltd. Patna 12,000 Kiloliter per Year capacity Packaged
Drinking Water and 276 MT per year capacity
PET Bottle unit at Fatuha, patna.
3.0323 55 13-Aug-12 - -
57 M/s Sinha Beverages and Eatables Pvt. Ltd. Patna 120 Lac Liters per year capacity Packaged
Drinking Water unit at Patna.
1.5 18 28-Nov-12 - -
58 M/S Blue Heavens Agro Industries Ltd, Patna. Proposal for establishment of 1,20,000,00
Liters per year capacity Packaged Drinking
Water at Chhotki Chanda, Koilwar, Bhojpur.
1.0087 17 13-Aug-10 - -
59 M/s Pratik Industries, Muzaffarpur 8760 MT per year capacity Ice-Creem, Ice-
Cream Block, Sorting and packaging of Fruits
and Vegetable unit in Proprietorship at
Industrial Area, Bela, Muzaffarpurl.
3.9322 170 18-Sep-12 - -
60 M/s Pragati Food Products, Hajipur, Vaisshali 3960 MT per year capacity Ice-Cream and Ice-
cream Block production unit in partnership at
E.P.I.P., Hajipur, Vaishali
2.4426 33 18-Sep-12 - -
61 M/S Hitachi Refrigeration, Begusarai. Proposal for establishment of 48,000 Liters per
year capacity Ice Cream unit at Industrial Area,
Barauni, Begusarai in proprietorship.
0.6592 23 12-Jan-11 - -
16207.7852 56148
1 M/S Ambey Rice Mill, Bettiah. Proposal for establishment of 3 MT per hour
capacity Modern Rice Mill unit in
proprietorship at Industrial Area, Kumarbagh,
Bettiah.
0.8725 30 29-Nov-10 - -
2 M/S Bettiah Industries Pvt. Ltd, Kumarbagh, Bettiah. Proposal for establishment of 08 MT per hour
capacity Modern Rice Mill and 1.2 M W
Captive Power Plant at Kumarbagh Industrial
Area, Chanpatiya, West Champaran.
21.2081 178 25-Feb-11 - -
3 M/s Prabha Enterprises, Motihari. 10500 MT per year capacity Rice Mill (Arwa)
unit in proprietorship at Industrial Area,
Bettiah, West Champaran
1.1883 21 18-Sep-12 - -
4 M/s Shree Riddhi Siddhi Agriproducts Pvt. Ltd., Bettiah Proposal for establishment of 03 MT per hour
Rice Mill and Pulse unit at Kumarbagh,
Industrial Area, Bettiah.
1.4752 35 08-Feb-13 - -
5 M/s Gauri Shankar Agriproducts Pvt. Ltd. West Champaran. Proposal for establishment of 12,600 MT per
year capacity Modern Rice Mill unit at Satahi,
Chanpatia, West Champaran
1.5835 35 08-Feb-13 - -
6 M/s Shiv Shakti Udyog Kumarbagh, West Champaran. Proposal for establishment of 03 MT per hour
Arwa Rice Mill Production unit in
proprietorship at Industrial Area, Kumarbagh,
West Champaran.
1.4818 12 13-Mar-13 - -
7 M/S Champaran Agricon Pvt. Ltd, East Champaran (Motihari) Establishment of 64 MT per day capacity Rice
Mill at Chandrahiya, Motihari.
2.29 45 22-Feb-10 - -
8 M/S Shiv Shakti Agriproducts and Rice Industries Pvt. Ltd,
East Champaran.
Proposal for establishment of 05 MT per hour
capacity Modern Rice Mill at Gamaharia,
Raxaul.
2.81 52 19-Apr-10 21-Dec-10
9 M/S Champaran Agri Park Pvt. Ltd, Kolkata. Proposal for establishment of Food Park at
Bairia, Motihari.
132.14 1140 11-Aug-10 - -
10 M/S Ripuraj Agro Pvt. Ltd, Raxaul, East Champaran. Proposal for establishment of 04 MT per hour
Modern Rice Mill and 1000 MT Warehouse
unit at Amodei, Ramgadhwa, East Champaran.
2.2 19 27-Aug-10 10-Apr-11
11 M/S Mangal Deep Rice Mill Pvt. Ltd, Motihari, East
Champaran.
Proposal for establishment of 3 MT per hour
capacity Rice Mill, 1000 MT Warehouse at
Ekdari, Chaura Dano, East Champaran.
1.3782 44 27-Aug-10 11-Jul-11
12 M/S Satyam Agrofood Industries Pvt. Ltd, West Bengal. Proposal for establishment of 02 MT per hour
capacity Rice Mill at Bulachak, Kalyanpur, East
Champaran.
3.5933 59 12-Jan-11 11-Apr-11
13 M/S Mahalaxmi Industries, Bettiah. Proposal for establishment of 3200 MT per
year capacity Modern Rice Mill at Industrial
Area, Bettiah in proprietorship.
0.3629 6 25-Feb-11 19-Apr-12
14 M/S Jagdamba Bhawani Enterprises Pvt. Ltd, East
Champaran.
Proposal for establishment of 03 MT per hour
capacity Modern Rice Mill, two Warehouse of
3225 sq ft and 150 KVA Gasifier unit at Adapur,
East Champaran.
1.575 30 26-May-11 17-Sep-11
15 M/S Sri Laxmi Food Industries, Raxaul, East Champaran. Proposal for establishment of 16,200 MT per
year capacity Dal Mill unit in Partnership at
Raxaul.
1.2338 47 23-Feb-12 - -
16 M/S Shivam Modern Rice Industries Pvt. Ltd., Raxaul. Proposal for establishment of 36,000 MT per
year capacity Rice Mill unit at Kaurihar, Raxaul.
8.4034 19 16-Apr-12 - -
TOTAL :-
Services/processes relating to Agriculatural activities & Animal Husbandry
17
17 M/S Jas Global Agriculture and Power Pvt. Ltd., Motihari. Proposal for establishment of 08 MT per hour
Para Boiled and Raw Rice Mill and 02 MW Co-
generation Plant unit at Chintawanpur,
Chakiya, Pipra, East Champaran.
18.9888 96 11-Jun-12 - -
18 M/s Champaran Rice Mill Pvt. Ltd. Patna 48 MT per day capacity Arwa Rice mill at
Mathiyavrit, chauradano, East Champaran
2.9647 26 13-Aug-12 - -
19 M/s JK Hitech Rice Mill Pvt. Ltd. Patna. 8 MT per hour Modern Para Boiled Rice Mill
unit at Raghunathpur Ramgharwa, Raxaul East
Champaran
13.8 75 13-Aug-12 - -
20 M/s Mangal Deep Rice Mill Pvt Ltd. Chhauradano, East
Champaran.
8 MT per hour Modern Para Boiled Rice Mill
unit at East Champaran.
18.0892 15 28-Nov-12 - -
21 M/s Shivnandni Agro Pvt. Ltd. East Champaran Proposal fro establishment of 24,000 MT per
year capacity Modern Rice Mill unit at Adapur,
East Champaran
4.4404 54 08-Feb-13 - -
22 M/S Green Earth Fertilizer Pvt. Ltd, Sitamarhi. Proposal for establishment of 03 MT per hour
capacity Modern Rice Mill unit at Industrial
Area, Sitamarhi.
1.19 25 12-Jan-11 11-Jul-11
23 M/S Jass Agri Products Pvt. Ltd., New Delhi. Proposal for establishment of 5 MT per hour
capacity Modern Rice Mill and 4000 MT
Warehouse unit at Jhumma, Rooni Saidpur,
Sitamarhi.
4.9941 50 28-Sep-11 - -
24 M/S Kamakhya Kaushlya Construction Pvt. Ltd., Sitamarhi. Proposal for establishment of 25920 MT per
year capacity Modern Rice Mill unit at
Punauradham, Sitamarhi.
4.8467 30 23-Feb-12 - -
25 M/S Maa Durga Rice Mill, Madhubani. Establishment of 2400 MT per year capacity
Rice Mill at Industrial Area, Pandaul,
Madhubani.
0.4731 7 01-Feb-10 08-Jun-10
26 M/S Bihar Ma Durga Agro Industries Pvt. Ltd, Patna. Proposal for establishment of 8 MT per hour
Modern Rice Mill unit at Pandaul Industrial
Area, Madhubani.
5 30 11-Aug-10 - -
27 M/S Hari Om Narar Rice Mill Pvt. Ltd, Madhubani. Proposal for establishment of 03 MT per hour
Modern Rice Mill, 5000 MT Warehouse and
Gasifier unit at Kaluahi, Madhubani.
1.2585 20 27-Jul-11 - -
28 M/s Shiv Vijay Udyog, Araia. Proposal for capacity expansion of 7,600 MT in
the existing Rice Mill of 7,600 MT in
partnership at Forbesganj, Araria.
2.3457 30 08-Feb-13 - -
29 M/S Maa Shitla Rice Mill Pvt. Ltd, Purnea. Establishment of 14,400 MT per year capacity
Rice Mill at Growth Centre, Moranga, Purnea.
1.206 26 01-Feb-10 06-Jan-11
30 M/S Mcore Foods Pvt. Ltd, Purnea. Proposal for establishment of 3000 MT per
year capacity Rice Mill, 4000 MT per year
capacity Colour Sorting, Grading and Packing
and 950 MT per year capacity Grinding and
packing unit at Growth Centre
1.6 50 13-Aug-10 - -
31 M/S Vijay Laxmi Dal Mill, Purnea. Proposal for establishment of 1 MT per hour
Dal Mill unit in proprietorship at Industrial
Growth Centre, Purnea.
97.38 16 27-Aug-10 - -
32 M/S Avyn Enterprises Pvt. Ltd, Prunea Proposal for establishment of 08 MT per hour
Grain and Rice sorting and 03 MT per hour Rice
Grading and 20,000 MT Dry Warehouse under
R.A.B.C at Ghourdaur, Haveli, Purnea.
12.94 70 26-May-11 - -
33 M/S Prasad Udyog, Purnea Proposal for establishment of 2400 MT per
year capacity Dal Mill unit in proprietorship at
Industrial Area, Maranga, Purnea.
1.5552 17 27-Jul-11 - -
34 M/S Indica Overseas Pvt. Ltd., Noida, U.P. Proposal for establishment of 9600 MT per
year capacity Rice Mill unit at Industrial Area,
Maranga, Purnea.
3.3796 36 11-Jun-12 - -
35 M/s Laxmi Food and Agro Pvt. Ltd, Samastipur 8 MT per hour Modern Rice Mill unit at
Growth Centre, Maranga, Purnea.
16.6481 20 28-Nov-12 - -
36 M/s Swastik Rice and Chura Mill, Purnea. Proposal for establishment of 19,200 MT Per
year capacity Rice Mill and 21.6 MT per day
capacity Chura Mill unit in partnership at
Industrial Growth Centre, Maranga, Purnea.
3.3 54 08-Feb-13 - -
37 M/S Bhagwati Rice Mill, Katihar Proposal for establishment of 3 MT per hour
Para Boiled Modern Rice Mill unit at Bhorabari,
Katihar.
4.2662 12 26-Mar-12 - -
38 M/s Mukesh Rice & Flour Mill Madhepura. 7200 MT Per year capacity Rice Mill and 14400
MT per year capacity Roller Flour Mill unit in
proprietorship at Udakishanganj, Industrial
Area, Madhepura.
3.0037 36 18-Sep-12 - -
39 M/S Kundan Food Industries, Saharsa Proposal for establishment of 1200 MT per
year capacity of Dal Mill unit in proprietorship
at Industrial Area, Saharsa.
0.7083 16 28-Sep-11 - -
18
40 M/S Durga Agronomy Pvt. Ltd, Darbhanga. Proposal for establishment of 8 MT per hour
capacity Rice Mill and 2000 MT capacity
Warehouse at Donar Industrial Area,
Darbhanga.
3.87 30 19-Apr-10 - -
41 M/S Kisan Food Processing Udyog, Darbhanga. Proposal for establishment of 2 MT per hour
capacity Modern Rice Mill, 01 MT per hour
capacity Rice Flakes and 0.5 MT per hour
capacity Corn Flakes unit in proprietorship at
New Industrial Area, Bela,
0.9089 30 24-May-10 30-Sep-11
42 M/S Sai Sachidanand Agrotech Pvt. Ltd, Jamshedpur. Proposal for establishment of 3 MT per hour
Rice Mill at Khera, Darbhanga.
2.71 20 13-Aug-10 - -
43 M/S Maa Shyama Rice Mills, Darbhanga. Proposal for establishment of 01 MT per hour
capacity Rice Mill unit at Industrial Area, Bela,
Darbhanga in proprietorship.
0.508 10 12-Jan-11 - -
44 M/S Mithila Rice Mills Pvt. Ltd, Darbhanga. Proposal for establishment of 06 MT per hour
Modern Rice Mill, 2000 MT Warehouse and
400 KW Biomass Gasifier unit at Darbhanga.
4.372 50 09-Apr-12 - -
45 M/S Hari Narayan Singh Agro Pvt. Ltd., Rohtas. Proposal for establishment of 08-08 MT per
hour capacity Modern Para Boiled Rice Mill
and Raw Rice Mill unit at Tilain, Nokha, Rohtas.
8.0057 38 23-Feb-12 - -
46 M/S Nand Gopal Agro Industries Pvt. Ltd., Darbhanga. Proposal for establishment of 04 MT per hour
capacity Modern Rice Mill unit at
Chandanpatti, Sara, Mohanpur, Darbhanga.
4.7299 30 16-Apr-12 - -
47 M/S Hariom Modern Rice Mill, Darbhanga. Proposal for establishment of 15000 MT per
year capacity Rice Mill unit in proprietorship at
Katsa, Bharwara, Darbhanga.
2.325 12 16-Apr-12 - -
48 M/s Vaishnavi Industries, Darbhanga
M/s Vaishnavi Industries Barbhanga
5520 MT per year capacity Rice Mill and Dal
Mill production unit in proprietorship at
industrial Area, Donar, Darbhanga.
1.9413 34 18-Sep-12 - -
49 M/s Kisan Rice & Dal Mill, Darbhanga. Proposal for establishment of 15,000 MT per
year capacity Rice and Dal Mill unit in
propretorship at New Industrial Estate, Bela,
Darbhanga.
1.7883 27 13-Mar-13 - -
50 M/S Amrapali Foods Ltd., Ujjawal, 2nd Floor, Opposite
Planetarium, Bailey Road, Patna
Proposal for establishment of Food Park at
Muzaffarpur, Vaishali (Hajipur).
125 0 25-Feb-08 - -
51 M/S Muzaffarpur Modern Rice Mill, New Delhi. Proposal for establishment of 144 MT per day
capacity Modern Rice Mill unit in partnership
at Chajan, Harishnagar, Turki, Muzaffarpur.
2.1664 38 27-Jul-11 25-Apr-12
52 M/S Kumud Foods and Beverage Pvt. Ltd., Muzaffarpur. Proposal for establishment of 06 MT per hour
Modern Rice Mill (Raw and Para Boiled) unit at
Kanti, Muzaffarpur.
7.1075 60 23-Feb-12 - -
53 M/S Laxman Agro Enterprises Pvt. Ltd., Muzaffarpur. Proposal for establishment of 03 MT per hour
capacity Modern Rice Mill unit at Industrial
Area, Bela, Muzaffarpur
1.0584 25 11-Jun-12 - -
54 M/s Bhimseria Agro Pvt. Ltd. Muzaffarpur 10 MT per hour para Boiled Rice Mill and Plain
Rice Mill at Industrial Estate, Bela, Muzaffarpur
10.4663 36 13-Aug-12 - -
55 M/s Mahaganpati Food and Agro Products Pvt. Ltd.
Muzaffarpur
14,880 MT per year capacity Modern Para
Boiled Rice Mill unit at Muzaffarpur
6.9267 18 13-Aug-12 - -
56 M/s Vaishali Enterprises Pvt. Ltd, Muzaffarpur. 40320 MT per year capacity para Boiled Rice
Mill unit at Bela Industrial Area, Muzaffarpur.
7.5477 34 18-Sep-12 - -
57 M/S Kanti Nagendra Rice Mill Pvt. Ltd., Muzaffarpur. 17280 MT per year capacity Rice Mill unit at
Jarang Tekuna, Muzaffarpur.
8.3604 42 18-Sep-12 - -
58 M/s Hentech Agrovet Pvt. Ltd., Muzaffarpur. 42240 MT per year capacity Para Boiled Rice
and Plain Rice Mill unit at Bela Industrial Area,
Muzaffarpur
10.4645 47 18-Sep-12 - -
59 M/s Kanchan Jangha Food Products Pvt. Ltd., Muzaffarpur 19200 MT per year capacity Raw Rice Mill unit
at Industrial Area, Bela, Muzaffarpur.
4.257 20 28-Nov-12 - -
60 M/s Akash Agro Developers Pvt. Ltd. Muzaffarpur 36000 MT Per year capacity para Boiled
Modern Rice Mill unit at Silaut, Baijnath
Kudhani, Muzaffarpur
11.4287 54 28-Nov-12 - -
61 M/s Kalawati Manas Rice Mill Pvt. Ltd. Muzaffarpur Proposal for establishment of 30,240 MT per
year capacity Para Boiled Rice Mill unit at
Chandua Tola, Barkurwa, Kurhani, Turki,
Muzaffarpur.
5.885 29 08-Feb-13 - -
62 M/s Chandan Agro Foods Pvt. Ltd., Patna. Proposal for establishment of 10 MT per hour
Modern Rice Mill (Para Boiled and Arwa) unit
at Kanti, Muzaffarpur
13.59 69 13-Mar-13 - -
63 M/S Pawan Rice Industries, Gopalganj Proposal for establishment of 6 MT per hour
Modern Rice Mill and 1000 MT Warehouse at
Madhomath, Kuchaikot, Gopalganj in
partnership.
0.9892 21 11-Aug-10 04-Feb-11
19
64 M/S Dev Rice Mills Pvt. Ltd., Siwan. Proposal for establishment of 04 MT per hour
capacity Modern Rice Mill unit at Siswa Kala,
Siwan.
4.696 12 26-Mar-12 - -
65 M/S Rakesh Eatables and General Products Pvt. Ltd., B-4,
Industrial Area, Hajipur, Vaishali,-844101 (Canceling earlier
name of the company M/S Rakesh Masala Pvt. Ltd, the new
name as " M/S Rakesh Eata
Setting up a Food Processing Unit at Hajipur
Industrial Area/Export Zone
1.37 16 14-Aug-08 - -
66 M/S River Valley Flour Mills Pvt. Ltd, Hajipur, Vaishali. Proposal for capacity expansion from 49,500
MT per year capacity to 75,000 MT per year
capacity in the existing unit of Flour Mill at
Industrial Area, Hajipur.
6.2 17 27-Jul-11 19-Apr-12
67 M/S Bhabishya Rice Mill Ltd., Howrah. Proposal for establishment of 08 MT per hour
capacity Para Boiled Modern Rice Mill unit at
Kishanpura, Vaishali.
29.465 28 23-Feb-12 - -
68 M/S Loma Rice Mills(Proprietorship unit of M/S Blue Bird e
Solutions Pvt. Ltd.), Kolkata.
Proposal for establishment of 43,200 MT per
year capacity Para Boiled and Plain Rice Mill
unit in proprietorship at Loma, Jandaha,
Vaishali.
8.0359 38 11-Jun-12 - -
69 M/s Om Shri Laxminarain Warehouse Shoppers Ltd. Patna 8 MT per hour Boiled Rice Mill unit at Hajipur 18.6678 60 13-Aug-12 - -
70 M/s Swadeshi Rice Mills Pvt. Ltd. Vaishali 64,000 MT per year capacity Rice Mill unit at
E.P.I.P., Hajipur
21.0311 72 18-Sep-12 - -
71 M/s Sarvoday Rice Mill Pvt. Ltd., Vaishali 48000 MT per year capacity Modern Para
Boiled Rice Mill unit at Balnathpur, Kudi,
Patepur, mahua, Vaishali
20.057 75 28-Nov-12 - -
72 M/s Panna Lal Agro Products Pvt. Ltd., Hajipur Proposal for establishment of 18,000 MT per
year capacity Dal Mill unit at Industrial Area,
Hajipur
2.6434 40 02-Jan-13 - -
73 M/s Dayal Products Pvt. Ltd. Hajipur. Proposal for establishment of 18000 MT Per
year capacity Dal Mill unit at Industrial Area,
Hajipur, Vaishali
2.438 40 08-Feb-13 - -
74 M/s Vaishali Rice Mill Pvt. Ltd., Hajipur. Proposal for establishment of 24,000 MT per
year capacity Modern Rice Mill unit at
Industrial Area, Hajipur.
5 15 13-Mar-13 - -
75 M/S Kritika Rice Mill Pvt. Ltd, Samastipur Proposal for establishment of 14400 MT per
year capacity Modern Rice Mill and Warehouse
at Basudeopur, Kalyanpur, Samastipur.
4.48 35 26-May-11 02-Dec-11
76 M/S Vindhyawasini Rice Mill, Samastipur. Proposal for establishment of 2 MT per hour
capacity Rice Mill unit in proprietorship at
Bargaon, Hasanpur, Samastipur.
0.955 11 23-Feb-12 - -
77 M/S Ambey Mata Agro Industries Pvt. Ltd., Samastipur. Proposal for establishment of 05 MT per hour
capacity Modern Rice Mill unit at Dadhiya
Belar, Karpurigram, Samastipur.
3.2468 22 23-Feb-12 - -
78 M/S Lakshmi Wheat Products Pvt. Ltd., Samastipur. Proposal for capacity expansion in the existing
Flour Mill unit from 15000 MT per year
capacity to 54000 MT per year capacity at
Samastipur.
3.42 28 11-Jun-12 - -
79 M/s Maa Chhinmastika Enterprises Pvt. Ltd., Samastipur. Proposal for establishment of 28,800 MT per
year capacity Rice Mill unit at Industrial Area,
Samastipur.
9.0756 40 13-Mar-13 - -
80 M/S Kumar Commodity and Food Management Pvt. Ltd.,
Beguasarai.
Proposal for establishment of 04 MT per hour
Rice Mill unit at Deona Industrial Area,
Barauni.
2.65 81 11-Jun-12 - -
81 M/s Universal Agro Corporation Ltd., Begusarai Proposal for establishment of 38,400 MT per
year capacity Rice Mill unit at Bagrahadih,
Barauni, Begusarai.
17.7941 18 08-Feb-13 - -
82 M/s Veena Edibles Pvt. Ltd. Begusarai. Proposal for establishment of14,400 MT per
yera capacity Arwa Rice Mill at Daulatpur
Kothi, Khodawandpur, Begusarai.
2.511 28 13-Mar-13 - -
83 M/s Pristine Mega Food Park Pvt. Ltd. New Delhi. Proposal for establishment of Mega Food Park
at Mansi, Khagaria.
146 10790 08-Feb-13 - -
84 M/S Bihar Agro Projects Ltd, 19, R.N. Mukherjee Road,
Kolkata-1
Proposal for establishment of Food Park at
Bhagalpur
75 0 25-Feb-08 - -
85 M/S Ambo Exports Ltd, Kolkata Proposal for establishment of 200 MT per day
capacity Modern Rice Mill unit at Kahalgaon
Industrial Area, Bhagalpur.
17.5 114 21-Jul-10 - -
86 M/S Keventer Food Park Infra Ltd, Kolkata. Proposal for establishment of Food Park at
Kahalgaon Industrial Area, Bhagalpur.
75.33 425 21-Jul-10 - -
87 M/s V N Vdyog Pvt. Ltd., Bhagalpur. Proposal for establishment of 15,360 MT Per
year capacity Rice Mill unit at Barari Industrial
Area, Bhagalpur
3.9609 48 08-Feb-13 - -
88 M/S Kamla Agro Pvt. Ltd, Banka Establishment of 6 MT per hour capacity Rice
Mill, Husk Based Power Plant and 5000 MT
capacity Warehouse at Amarpur, Banka.
11.47 100 16-Nov-09 11-Feb-10
20
89 M/S Comprehensive Consultancy Pvt. Ltd, Kolkata. Establishment of 5 MT per hour capacity Rice
Mill, 3 MT per hour capacity Sorting/
Packaging, Warehouse of 4500 MT and Husk
Processing Gasifier unit at Banka, Bhagalpur.
6.1 14 22-Feb-10 23-Jul-10
90 M/S S.K. Gupta Rice Mill, Banka. Proposal for establishment of 3 MT pre hour
Rice Mill, 500 MT Warehouse, Husk Based
Gasifier D.G. Set at Rajbandh, Dhoraiya, Banka
in partnership.
0.73 5 13-Aug-10 - -
91 M/s Natraj Rice Mill Pvt. Ltd, Lakhisarai. 96000 MT per year capacity Rice Mill and 1.2
MW captive Power Plant unit at Dakra,
Lakhisarai.
34.6938 68 18-Sep-12 - -
92 M/S Chaman Rice Mill Pvt. Ltd., Shekhpura. Proposal for establishment of 70 MT per day
capacity Modern Rice Mill unit at Andauli ,
Chewara, Shekhpura.
2.5633 41 26-Mar-12 - -
93 M/s Arena Food and Agro Industries Pvt. Ltd., Sheikhpura. Proposal for establishment of 14,400 MT per
year capacity Arwa Rice Mill unit at Maharath,
Sheikhpura.
1.509 21 08-Feb-13 - -
94 M/s Sharma Rice Mill Sheikhpura. Proposal for establishment of 14,400 MT per
year capacity Rice Mill unit in Proprietorship at
mafo, Fhatkushumbha, Barbhigha, Sheikhpur.
2.355 30 13-Mar-13 - -
95 M/S Shivsagar Rice Mill Pvt. Ltd, Nalanda Establishment of 14400 MT per year capacity
Rice Mill at Deep Nagar, Maniyama Road,
Nalanda.
2.05 33 22-Feb-10 08-Jun-10
96 M/S Pawapuri Rice Mills, Nalanda. Proposal for establishment of 4 MT per hour
capacity of Para Boiled Rice Mill unit in
proprietorship at Chausa, Pokharpur,
Pawapuri, Nalanda.
4.7887 31 28-Sep-11 - -
97 M/S Radhika Rice Mills, Silao, Nalanda. Proposal for establishment of 03 MT per hour
capacity Modern Rice Mill in partnership at
Nirpur, Silao, Nalanda.
0.7871 15 23-Feb-12 - -
98 M/s Kisan Rice Insustries Pvt. Ltd. Nalanda 15,000 MT Per year Capacity Modern Rice Mill
unit at Narsanda, Chandi, Nalanda.
3.902 24 18-Sep-12 - -
99 M/s Budh Bihar Rice Mill Pvt. Ltd., Nalanda 19200 MT Per year capacity Arwa Ricr Mill unit
at Deep Nagar, Nalanda
3.852 32 28-Nov-12 - -
100 M/s Dhanuka Pesticides Ltd. , New Delhi. Establishment of Agri Malls and Multiplex
Complex.
0 0 09-Oct-06 - -
101 M/S Era Agritech(I) Pvt. Ltd., 153 Okhla Industrial Area,
Phase-III, New Delhi.
Establishment of Agro Business Centre and
Primary Processing Centre in Bihar
84.7 300 17-Mar-08 - -
102 M/S Om Shri Laxminarayan Warehouse Shoppers Ltd, Patna. Establishment of Modern Rice Mill with the
capacity of 24 MT per hour at Nasriganj,
Danapur, Patna.
13.62 101 19-Oct-09 11-Feb-10
103 M/S Om Shri Gramin Fodder Food Process Ltd, Patna
(Company's proposal approved on 07.12.09 for
establishment of 1,53,600 MT per year capacity Modern Rice
Mill at Phulwarisharif, Patna has been amended
Establishment of 1,53,600 MT per year capacity
Modern Rice Mill at Danapur, Patna.
10.14 101 12-Jan-11 - -
104 M/S Rainbow Products Pvt. Ltd, Patna. (Company's proposal
approved by SIPB on 19.04.10 for establishment of 28,800
MT per year capacity Rice Mill at Mahuli Road, Karmalichak,
Patna City, Patna has bee
Proposal for establishment of 14,400 MT per
year Capacity Rice Mill Unit at Mahuli Road,
Karmalichak, Patna City.
3.11 23 27-Aug-10 04-Feb-11
105 M/S Sonamoti Agrotech Pvt. Ltd, Patna. (Earlier, in the SIPB
meeting held on 03.05.10 consent was given for
establishment of 28,800 MT per year capacity Rice Mill at
Karmalichak, Patna City. Again on
Proposal for establishment of 62592 MT per
year capacity Modern Rice Mill in place of
28,800 MT per year capacity at, Karmalichak,
Patna City. Patna.
22.4394 103 28-Sep-11 04-Feb-11
106 M/S Aarna Foods Pvt. Ltd, Patna City. Proposal for capacity expansion from 4500 MT
to 9600 MT per year capacity in the existing
Rice Mill at Deedarganj, Patna City.
2.95 7 24-May-10 04-Feb-11
107 M/S Maa Sarswati Modern Rice Mill Pvt. Ltd, Patna. Proposal for establishment of 6 MT per hour
capacity Rice Mill and 1000 MT Warehouse at
Bhagwatipur More, Bihta, Patna.
1.55 45 21-Jul-10 06-Jan-11
108 M/S Om Shree Gramodyog Food Process Co-operative
Society Ltd, Patna.
Proposal for establishment of 24 MT per hour
capacity Modern Rice Mill at Danapur Biscuit
Factory Road, Nasriganj, Patna.
7.54 101 29-Nov-10 - -
109 M/S Krrish Rice Mills Pvt. Ltd, Patna. Proposal for establishment of 08 MT per hour
capacity Modern Rice Mill at Industrial Area,
Fatuha, Patna.
10.3269 50 12-Jan-11 11-Jul-11
110 M/S Asra Agro Industries, Patna Proposal for establishment of 7200 MT per
year capacity Rice Polishing and Milling unit in
proprietorship at Industrial Area, Fatuha,
Patna.
2.3743 25 26-May-11 - -
111 M/S Anjali Rice Mill Pvt. Ltd, Patna. Proposal for expansion of 3 MT per hour
capacity of Modern Rice Mill, 14000 Sq. Ft.
Warehouse and Gasifier unit in the existing
unit at Sadallichak, Patna.
2.6624 49 28-Sep-11 - -
21
112 M/S Kalpana Foods Pvt. Ltd, Patna. Proposal for establishment of 3 MT per hour
capacity Modern Rice Mill and 1000 MT
Warehouse unit at Fatuha Industrial Area,
Fatuha.
2.2548 12 28-Sep-11 - -
113 M/S Jai Jawan Food Processing Pvt. Ltd., Bokaro. Proposal for establishment of 03 MT per hour
Para Boiled Rice Mill unit at Chowk Kharwan,
Dulhin Bazar, Danapur, Patna.
3.355 25 23-Feb-12 - -
114 M/S Danara Agro and Packaging Pvt. Ltd., Patna. Proposal for establishment of 06 MT per hour
capacity Modern Rice Mill unit at Danara,
Bikram, Patna.
3.7406 25 23-Feb-12 - -
115 M/s Kusum Agro Endeavor Pvt. Ltd. Patna 04 MT per hour Modern Rice Mill unit at Simra,
Phulwarisharif, Patna
5.3145 48 13-Aug-12 - -
116 M/s Khatu Shyam Foods Pvt. Ltd. Patna 08 MT per hour Modern Rice Mill Unit at
Mohiuddinpur, Fatuha, Patna
15.8586 57 13-Aug-12 - -
117 M/s A.R. Mills Patna 9600 MT per year Capacity Rice Mill and Dal
Mill unit in proprietorship at Fatuha, Patna
1.7647 38 13-Aug-12 - -
118 M/s L.K. Rice Mill, Patna. 96 MT per day capacity Arwa Rice Mill unit in
proprietorship at Indusstrial Area, Fatuha,
Patna.
1.4391 39 18-Sep-12 - -
119 M/s Radha Krishna Hi-Tech Agro Industries Pvt. Ltd., Patna 19200 MT Per year Capacity Rice Mill unit at
Bihta.
5.4956 12 18-Sep-12 - -
120 M/s Aaryapoorna Food Processing Pvt. Ltd. Navi Mumbai,
Maharastra.
6375 MT per year capacity Dal Mill unit at
Selgarh, Saidabad, Patna
3.4818 17 28-Nov-12 - -
121 M/s Tridev Rice Mill, East Champaran. 9600 MT Per year capacity Arwa Rice Mill Unit
in proprietorship at Mathkolasi, Chiraiya, East
Champaran.
1.1835 26 28-Nov-12 - -
122 M/s Sai Kamal Agro Pvt. Ltd., Panta 14400 MT per year capacity Arwa Rice Mill unit
at patna
2.817 30 28-Nov-12 - -
123 M/s Maa Ambika Bhawani Industries, Patna. Proposal for establishment of 6000 MT per
year capacity Modern Rice Mill unit in
partnership at Industrial Area, Fatuha, Patna.
2.4074 24 08-Feb-13 - -
124 M/s Santosh Kumar Gupta Rice Mill Pvt. Ltd. Fatuha, Patna. Proposal for establishment of 4 Ton per hour
Rice Mill unit at Industrial Area, Fatuha, Patna.
4.8361 12 08-Feb-13 - -
125 M/s Harsh Fresh Agro Foods Pvt. Ltd., Patna. Proposal for establishment of 14,400 MT per
year capacityRice Mill Unit at Lakhna Balipur,
Patna.
2.3348 12 08-Feb-13 - -
126 M/s Sinha Rice and Agro Pvt. Ltd., Patna. Proposal for establishment of 19,200 MT Per
year capacity Rice Mill unit at Verni, Masaurhi,
Patna.
2.7438 12 08-Feb-13 - -
127 M/s Manju Modern Rice Mills Pvt. Ltd. Patna. Proposal for establishment of 6000 MT per
year capacity Modern Rice Mill at Lalbagh,
Dhanarua, Patna.
1.7805 21 13-Mar-13 - -
128 M/S Bhojpur Rice Mill Pvt. Ltd, Bhojpur Establishment of 9600 MT per year capacity
Rice Mill at Baradparva, District.- Bhojpur
1.54 30 01-Feb-10 06-Apr-10
129 M/S Ruby Rahul Rice Mills Pvt. Ltd, Patna City. Proposal for establishment of 3 MT per hour
capacity Rice Mill and 1000 MT capacity
Warehouse at Giddha Industrial Area, Ara.
0.72 9 24-May-10 - -
130 M/S Alok Harsh Rice Mill Pvt. Ltd, Danapur, Patna. Proposal for establishment of 4 MT per hour
Modern Rice Mill at Giddha Industrial Area,
Koilwar, Ara.
2.097 42 13-Aug-10 - -
131 M/S Bhojpur High Tech Agro Products Pvt. Ltd, Ara. Proposal for establishment of 05 MT per hour
capacity Modern Rice Mill, 1000 MT capacity
Warehouse and 200 KW Gasifier unit at
Sakhua, Udwantnagar, Ara.
1.2155 30 29-Nov-10 - -
132 M/S Ananya Agro Tech Pvt. Ltd, Patna Proposal for establishment of 2.5 MT per hour
Modern Rice Mill and 1000 MT Warehouse at
Giddha Growth Centre, Ara(Bhojpur).
2.3275 60 26-May-11 - -
133 M/S Laxmi Narayan Enterprises Pvt. Ltd, Patna. Proposal for establishment of 08 MT per hour
Modern Rice Mill, 1000 MT Warehouse at Rani,
Bhojpur.
9.126 68 27-Jul-11 19-Apr-12
134 M/S A 2 Z Powercom Ltd., Gurgaon, Haryana. Proposal for establishment of 05-05 MT per
hour capacity of Modern Rice Mill and 02-02
MW Biomass Based Power Plant in each
district of Buxar and East Champaran.
37.84 150 28-Sep-11 - -
135 M/S Mansi Bijlee & Rice Mills Pvt. Ltd., Gurgaon, Haryana. Proposal for establishment of 05-05 MT per
hour capacity of Modern Rice Mill and 02-02
MW Biomass Based Power Plant in each
district of Bhojpur, Rohtas and Kaimur.
56.76 225 28-Sep-11 - -
136 M/S Alok Harsh Rice Mill Pvt. Ltd., Danapur, Patna. Proposal for establishment of 70 MT per day
capacity of Modern Para Boiled Rice Mill unit
at Giddha Industrial Growth Centre, Ara.
7.36 42 28-Sep-11 27-Feb-12
22
137 M/S Shahabad Agro Pvt. Ltd., Bhojpur, Ara. Proposal for establishment of 04 MT per hour
capacity Modern Para Boiled Rice Mill, 2000
MT Warehouse and Captive Power Plant at
Bihta, Bhojpur.
6.7095 50 23-Feb-12 - -
138 M/S Kakan Rice Mill Pvt. Ltd., Patna. Proposal for establishment of 8 MT per hour
capacity Para Boiled and Raw Rice Mill unit at
Giddha, Ara, Bhojpur.
14.8213 12 09-Apr-12 - -
139 M/S Nawneet Raj Rice Mill Pvt. Ltd., Ara. Proposal for establishment of 04 MT per hour
capacity Rice Mill at Baligaon, Garhani,
Bhojpur.
4.0951 15 09-Apr-12 - -
140 M/S Captain Ramesh Rice Mills Pvt. Ltd., Ara. Proposal for establishment of 04 MT per hour
capacity Boiled Rice Mill at Demha, Bagwa,
Udwantnagar, Bhojpur.
6.426 38 09-Apr-12 - -
141 M/S Lal Chinta Rice Mills Pvt. Ltd., Ara(Bhojpur). Proposal for establishment of 05 MT per hour
Para Boiled and Raw Rice Mill unit at Industrial
Growth Centre, Giddha, Bhojpur.
5.2853 12 11-Jun-12 - -
142 M/s Sri Shivam Rice Mill Bhojpur 7200 MT per year capacity Modern Rice Mill
unit in partnership at Giddha Industrial Area
Giddha, Bhojpur
1.53 26 18-Sep-12 - -
143 M/s Jai Maa Sharda Rice Mill, Danapur Cantt., Patna 14400 MT per year capacity Modern Rice Mill
unit im proprietorship at Giddha Industrial
Area, Bhojpur
2.097 7 18-Sep-12 - -
144 M/s Maa Laxmijee Rice Mill Bhojpur 3 MT per hour Modern Rice Mill unit in
proprietorship at Piro, Bhojpur
1.0584 25 28-Nov-12 - -
145 M/s Nand Rice Mill Pvt. Ltd., patna 38400 MT per year capacity Arwa Rice Mill Unit
at Babhinav, Jagdinspur, Bhojpur.
7.4493 47 28-Nov-12 - -
146 M/s Maa Agro Food Industries Pvt. Ltd., Patna 19200 MT per year Capacity Para Boiled Rice
Mill unit at Majhion, Hasanbazar, Piro,
Bhojpur.
8.514 43 28-Nov-12 - -
147 M/s Babajee Rice mill Bhojpur. Proposal for capacity expansion of 02 MT per
hour in the existing Rice Mill in partnership at
Besiyan Jamua, Bhojpur.
3.798 44 13-Mar-13 - -
148 M/s S.S. Agro Projects Pvt. Ltd., Bhojpur. Proposal for establishment of 14,400 MT per
year capacity Rice Mill unit at Gyanpura,
Bhojpur.
3.8592 17 13-Mar-13 - -
149 M/S Siddhashram Rice Mills Cluster Pvt. Ltd., Rambag, Buxar. Proposal for establishment of Rice Mill and 2
MW Rice Husk based Power Plant at Chausa,
Buxar
14.3 250 18-Nov-08 04-Jun-09
150 M/S Dumraon Textiles Ltd, Dumraon Establishment of 10 MT per hour capacity
Modern Rice Mill and 2 MW Captive Power
Plant at Dumraon, Buxar.
19.68 175 17-Aug-09 - -
151 M/S Nawneet Raj Rice Mills Pvt. Ltd, Ara. Proposal for establishment of 2.5 MT per hour
capacity Rice Mill and 1000 MT Warehouse at
Ariaon, Dumraon, Buxar.
1.54 20 29-Jun-10 - -
152 M/S Shri Sita Rice Mill, Buxar. Proposal for capacity expansion of the existing
Rice Mill from 2 MT per hour to 06 MT per
hour in partnership at Mohanpurwa, Chausa,
Buxar.
1.5984 40 23-Feb-12 - -
153 M/S Lakho Agriculture and Food Products Pvt. Ltd., Bhojpur. Proposal for establishment of 04 MT per hour
capacity Boiled Rice Mill unit at Raghunathpur,
Brahampur, Buxar.
7.785 42 23-Feb-12 - -
154 M/S Dumraon Agro Industries Pvt. Ltd., Buxar. Proposal for establishment of 6 MT per hour
Modern Rice Mill unit at Garatha Khurd, Buxar.
11.8609 86 26-Mar-12 - -
155 M/S Mums Mega Food Park Pvt. Ltd., Delhi. Proposal for establishment of Food Park
(Central Processing Centre, Common Facilities
Cold Warehouse, Dry Warehouse, C.A. Storage,
Sorting Grading Washing) unit at Nawa Nagar,
Buxar.
75.3354 100 26-Mar-12 - -
156 M/s Kusum Rice Mill Pvt. Ltd. Buxar 04 MT per hour modern Arwa Rice Mill Unit at
Tiyara, Manoharpur, Buxar
3.544 12 13-Aug-12 - -
157 M/s Kaveri Food Industry, Buxar 5222 MT per year capacity Modern Rice Mill
(Arwa) unit in proprietorship at Ahirauli Buxar.
1.03 15 13-Aug-12 - -
158 M/s Ma Vindhya Devi Rice Mills Pvt. Ltd. Buxar 38400 MT per year Capacity Modern Rice Mill
unit at Rajpur, Buxar
11.5128 12 28-Nov-12 - -
159 M/s Sri Rakhakrishna Rice Mill, Buxar 3 MT per hour Modern Rice Mill unit in
Proprietorship at Sarenja, Rajpur, Buxar
1.0355 22 28-Nov-12 - -
160 M/s Amrapli Biotech India Pvt. Ltd., Gaziabad, Uttar Pradesh 32000 MT per year capcity Corn Grit, Rice Grit
and Wheat Grit production unit at Navanagar,
Dumaraon, Buxar.
18.3493 175 28-Nov-12 - -
161 M/s Raveena Rice Mills India Pvt. Ltd., Buxar Proposal for estaablishment of 19,200 MT per
year capacity Modern Rice Mill Unit at
Dehariya, Basudhar, Buxar.
6.8487 15 08-Feb-13 - -
162 M/s Rajkishori Flour & Rice Mills Pvt. Ltd. Buxar Proposal for establishment of 19,200 MT Rice
Mill unit at Chhotka Naun, Buxar.
4.3813 12 08-Feb-13 - -
163 M/S Sri Durga Agro Energy Ltd, Station Road, Buxar. Proposal for establishment of Rice Mill, Solvent
Extraction Plant and 15 MW Co-generation
Plant at Bhagra Kudra, Kaimur.
141 265 18-Nov-08 - -
23
164 M/S Shobhnath Rice Mill Pvt. Ltd, Bhabhua. Establishment of 2 MT per hour capacity Rice
Mill and 1000 MT capacity Warehouse at
Kulhariya, Kaimur, Dist.-Bhabhua.
1.15 16 01-Feb-10 28-Mar-10
165 M/S Kaimur Kohinur Rice Mill Pvt. Ltd, Kaimur. Establishment of 9600 MT per year capacity
Rice Mill at Chand, Dist.- Kaimur.
1.53 14 01-Feb-10 23-Apr-10
166 M/S Krishna Rice & Polisher Mills, Kaimur. Proposal for Modernisation after
establishment of 3 MT per hour capacity
Modern Rice Mill in proprietorship in place of
existing 1 MT per hour capacity Rice Mill at
Bhopatpur, Mohania, Kaimur.
1.15 20 27-Aug-10 19-Apr-12
167 M/S Jhunjhunwala Oil Mills Ltd, Varanasi. Proposal for establishment of 8 MT per hour
capacity Rice Mill at Bangra, Kudra, Kaimur,
Bhabhua.
19 125 27-Aug-10 04-Feb-11
168 M/S Vina Paras Modern Rice Mill Pvt. Ltd, Kaimur, Bhabhua. Proposal for establishment of 12 MT per hour
capacity Modern Rice Mill unit at Bhabhua,
Kaimur.
14.2378 83 29-Nov-10 18-Jul-11
169 M/S Sri Hari Rice Mills Pvt. Ltd, Kaimur, Bhabhua. Proposal for establishment of 03 MT per hour
capacity Modern Rice Mill at Dadava, Mohania,
Kaimur, Bhabhua.
1.5661 42 27-Jul-11 - -
170 M/S Kudra Rice Mill Pvt. Ltd, Kaimur, Bhabhua. Proposal for establishment of 19,200 MT per
year capacity Modern Rice Mill and 150 KVA
Gasifier unit at Kudra, Kaimur, Bhabhua.
1.8871 44 27-Jul-11 - -
171 M/S Rameshwaram Rice Mills Pvt. Ltd., Patna. Proposal for establishment of 4 MT per hour
capacity of Boiled Rice Mill unit at Kaimur,
Bhabhua.
7.6236 40 28-Sep-11 - -
172 M/S Veer Hanuman Foods Processing Pvt. Ltd., Kaimur,
Bihar.
Proposal for establishment of 05-05 MT per
hour capacity Modern Para Boiled Rice Mill
and Modern Raw Rice Mill unit at Raziabandh,
Mohania, Kaimur.
6.13 30 23-Feb-12 - -
173 M/S Saroj Ranjan Foods Pvt. Ltd., Kaimur, Bhabhua. Proposal for establishment of 64 MT per day
capacity Rice Mill unit at Salthua, Kaimur,
Bhabhua.
6.9588 38 23-Feb-12 - -
174 M/s Shari Ji Enterprises, Bhabhua. 3 MT per hour Modern Rice Mill unit in
partnership at Ratwar Bhabhua
3.4766 15 13-Aug-12 - -
175 M/s Om Shanti Rice Mills Pvt. Ltd. Mohania, Kaimur
(Bhabhua)
05 MT per hour Modern Para Boiled and Raw
Rice Mill Unit at Usri, Mohania, Kaimur,
Bhabhua
7.4281 35 13-Aug-12 - -
176 M/s Jhunjhunwala Oil Mills Ltd. Varanasi. 28,800 MT per year capacity to 72,000 MT per
year capacity in the existing Modern Rice Mill
unit at Bangra, Kudra, Mohania, Kaimur,
Bhabhua.
21 180 18-Sep-12 - -
177 M/s Om Aastha Indo Energy Pvt. Ltd. Sasaram. 16,000 MT per year capacity Modern Rice Mill
Unit at Belaon, Kharonda, Kaimur
5.1759 40 18-Sep-12 - -
178 M/s Anamika Hitech Agro Industries Pvt. Ltd., Kaimur,
Bhabhua.
19200 MT per year Capacity Modern Rice Mill
unit at Kaimur, Bhabua.
5.7518 12 18-Sep-12 - -
179 M/s Manjusha Mini Rice Plant Kaimur, Bhabhua 4 MT per hour of existing Rice Mill of 1 MT Per
hour in proprietorship at Sakri Kudra.
1.65 13 28-Nov-12 - -
180 M/s Shristi Rice Mill Pvt. Ltd, 4 MT per hour Rice Mill unit at Dumraitha,
Kaimur.
3.625 42 28-Nov-12 - -
181 M/s Shiv Shakti Mini Rice Mill Kaimur Proposal for 2 MT Per day capacity expansion
of existing Rice Mill unit in proprietorship at
Chakiya, Durgawati, Kaimur
1.32 9 08-Feb-13 - -
182 M/s Shri Hanuman Mini Rice Mill, Kaimur Proposal for 2 MT per hour capacity expansion
Rice Mill in proprietorship
1.38 9 08-Feb-13 - -
183 M/s Jai Mata Rani Rice Mill, Mohania, Kaimur Proposal for establishment of 02 MT per hour
capacity Arwa Rice Mill Unit in proprietorship
at Bharkhar Mohania, Kaimur.
1.25 9 08-Feb-13 - -
184 M/s Pushpanjali Mini Rice Mill, Kaimur Proposal for capacity expansion of 02 MT per
hour in the existing Arwa Rice Mill unit in
proprietorship at Bharkhar, Patelnagar,
Mohania, Kaimur.
1.25 9 08-Feb-13 - -
185 M/s Jhandu Mini Rice Mill, Kaimur Proposal for capacity expansion of 02 MT per
hour in the existing Rice Mill unit in
proprietorship at Bharkhar, Mohania, Kaimur
1.25 9 08-Feb-13 - -
186 M/s Abhyodya Agro and Infrastructue Pvt. Ltd., Kaimur,
Bhabhua.
Proposal for establishment of 12,000 MT per
year capacity Seeds Processing unit-cum-Seed
Research Centre at Araiya, Chand, Kaimur.
2.0305 8 08-Feb-13 - -
187 M/s Kalpshrijan Rice Mill Pvt. Ltd., Kaimur, Bhabhua Proposal for establishment of 24,000 MT per
year capacity Modern Rice Mill unit at Rewra,
Mohania Kaimur, Bhabhua.
5.2907 58 08-Feb-13 - -
188 M/s Jai Malikaarjun Rice Mill Pvt. Ltd., Kaimur, Bhabhua. Proposal fro establishment of 15,360 MT per
year capacity Rice Mill unit at Bhundi, Tekari,
Mohania, Kaimur.
5.0337 12 08-Feb-13 - -
24
189 M/s Rajput Agro Food Products, Mohania, Kaimur, Bhabhua Proposal for establishment of 02 MT per hour
Rice Mill unit in Proprietnership at Piparia,
Mohania, Kaimur
1.3843 15 13-Mar-13 - -
190 M/s Gauri Shankar Rice Mill Kaimur, Bhabhua. Proposal for establishment of 9600 MT per
year capacity Rice Mill in Proprietorship at
Jagariya, Chinpur, Kaimur.
1.9669 23 13-Mar-13 - -
191 M/s Chintamaniaditya International Pvt. Ltd., Ramgarh,
Mohania, Kaimur.
Proposal for establishment of 15,300 MT per
year capacity Rice Mill unit at Sahuka,
Ramghar, Kaimur, Mohania.
6.3 10 13-Mar-13 - -
192 M/s Sona Valley International Pvt. Ltd., Ramgarh, Kaimur,
Bhabhua.
Proposal for establishment of 45,300 MT. per
year capacity Rice Mill unit at Sahuka,
Ramgarh, Kaimur.
8 15 13-Mar-13 - -
193 M/S Jay Shri Ram Annapurna Rice Mill Pvt. Ltd, Rohtas Establishment of Rice Mill at Kailani, Rohtas 1.7325 10 11-Jul-08 14-Aug-08
194 M/S Jai Kisan Food Products Pvt Ltd, Sasaram Proposal for establishment of Modern Rice Mill
with proposed capacity of 4 MT per hour,
Warehousing with proposed capacity of 5000
MT and Packaging project with proposed
capacity of 4 MT per hour at C
5.3851 150 16-Dec-08 04-Jun-09
195 M/S Vindhyabasini Rice Mills Cluster Pvt Ltd, Nokha, Rohtas
(Change of name of the company from M/S Sunil Kumar
Singh to M/S Vindhyabasini Rice Mills Cluster Pvt Ltd has
been approved in SIPB meeting
Proposal for establishment of Modern Rice Mill
with proposed capacity of 7 MT per hour,
Warehouse with proposed capacity of 10,000
MT and Packaging Project with proposed
capacity of 4 MT per hour at N
10.38 200 18-May-09 11-Jul-09
196 M/S Shivjee Modern Rice Mill Pvt Ltd, Konar, Sasaram Proposal for establishment of Modern Rice Mill
with proposed capacity of 4 MT per hour,
Warehouse with proposed capacity of 5000 MT
and Packaging Project with proposed capacity
of 4 MT per hour at Kon
4.715 150 16-Dec-08 04-Jun-09
197 M/S Bhagwan Agro Pvt Ltd, Rohtas Establishment of 4 MT per hour Modern Rice
Mill and 2000 MT Capacity Warehouse at
Nokha,Rohtas.
3.46 90 17-Aug-09 13-Dec-09
198 M/S Shanti Modern Rice Mill, Sasaram Establishment of 4 MT per hour Modern Rice
Mill and 1000 MT capacity Warehouse at Kaua
Dehri, Block-Shivsagar, Rohtas.
1.45 40 17-Aug-09 13-Dec-09
199 M/S Shree Hanumanjee Modern Rice Mill Pvt Ltd, Sasaram.
(Company's proposal approved by SIPB on 17.08.09 for
establishment of 4 MT per hour Modern Rice Mill and 4000
MT Capacity Warehouse at Vaijala,
Establishment of 12 MT per hour Modern Rice
Mill and 3000 MT Warehouse at Baijala,
Mokar, Rohtas
9.75 50 21-Jul-10 21-Dec-10
200 M/S Om Shivam Modern Rice Mill Pvt Ltd, Sasaram. Establishment of 11 MT per hour capacity
Modern Rice Mill and 5000 MT capacity
Warehouse at Konar, Shivsagar, Rohtas
5.79 55 17-Aug-09 13-Dec-09
201 M/S Hrideshwari Jee Modern Rice Mill, Rohtas Establishment of 2 MT Per hour capacity
Modern Rice Mill at Saleya, Akori Gola, Rohtas.
2.1283 15 23-Nov-09 11-Feb-10
202 M/S Sadafal Dev Agro Mills Pvt. Ltd, Dehri, Sasaram Establishment of 96 MT per day capacity Rice
Mill at Kauwa, Dehri, Sasaram.
3.9618 45 30-Nov-09 11-Mar-10
203 M/S Badrinarayanji Agromills Pvt. Ltd, Sasaram. Establishment of 7 MT per hour capacity
Modern Rice Mill, 3000 MT capacity
Warehouse at Usrawan, Cochas, Rohtas.
4.5 40 15-Feb-10 12-May-10
204 M/S Sri Dewanjee Rice Mill Pvt. Ltd, Rohtas. Proposal for establishment of 4 MT per hour
capacity Modern Rice Mill at Nokha, Rohtas.
1.4697 20 29-Nov-10 - -
205 M/S Maa Urmila Agro Pvt. Ltd, Rohtas Proposal for establishment of 05 MT per hour
Modern Rice Mill unit at Bikramganj, Rohtas.
4.2367 35 26-May-11 02-Dec-11
206 M/S Mahajan Rice Mills Pvt. Ltd, Patna. Proposal for capacity expansion of existing Rice
Mill from 02 MT per hour capacity to 07 MT
per hour capacity and modernization at Nokha,
Rohtas.
7.63 35 26-May-11 02-Dec-11
207 M/S Guptaji Brothers Rice Mills Pvt. Ltd, Rohtas. Proposal for establishment of 12 MT per hour
capacity Modern Rice Mill at Dalmia Nagar,
Rohtas
14.2378 83 27-Jul-11 - -
208 M/S Shree Hanumanjee Modern Rice Mill Pvt. Ltd, Sasaram. Proposal for establishment of 10 MT per hour
Modern Rice Mill unit at Godwar, Shivsagar,
Sasaram, Dist.-Rohtas.
10.0288 150 27-Jul-11 18-Dec-11
209 M/S Om Shakti Sitaram Rice Mill Pvt. Ltd, Rohtas. Proposal for establishment of 04 MT per hour
Rice Mill unit and 4000 MT Warehouse at
Ghausiankala, Bikramganj, Rohtas.
5.6961 44 27-Jul-11 27-Feb-12
210 M/S Lal Kesra Rice Mill Pvt. Ltd, Sasaram, Rohtas. Proposal for establishment of 14400 MT per
year capacity Rice Mill unit and 3000 MT
Warehouse at Karhgar, Rohtas.
4.464 36 27-Jul-11 - -
25
211 M/S Kisan Hi-Tech Agro Foods Pvt. Ltd, Kochas, Rohtas. Proposal for establishment of 05-05 MT per
hour capacity Modern Para Boiled Rice Mill
and Raw Rice Mill unit at Kochs, Rohtas.
10.28 40 23-Feb-12 - -
212 M/S Balaji Udyog, Rohtas. Proposal for establishment of 03 MT per hour
Rice Mill unit in proprietorship at Industrial
Area, Dehri, Rohtas.
1.0205 16 23-Feb-12 - -
213 M/S Pasupati Rice Mills Pvt. Ltd., Rohtas. Proposal for establishment of 04 MT per hour
capacity Boiled Rice Mill unit at Majhiaon,
Paruhar, Darihat, Rohtas.
7.3584 43 23-Feb-12 - -
214 M/S Raushan Agro Pvt. Ltd., Nokha, Rohtas. Proposal for establishment of 04 MT per hour
capacity Boiled Modern Rice Mill unit at
Kusumtola, Baraon, Nokha, Rohtas.
6.2793 38 23-Feb-12 - -
215 M/S Urmila Rice Mill Pvt. Ltd., Patna. Proposal for establishment of 04 MT per hour
capacity Boiled Modern Rice Mill unit at
Pararia, Dinara, Rohtas.
5.472 40 23-Feb-12 - -
216 M/S Pragana Danwar Food Processor Pvt. Ltd., Patna. Proposal for establishment of 04 MT per hour
capacity Modern Rice Mill unit at Danwar,
Rohtas.
5.8949 30 23-Feb-12 - -
217 M/S Maa Vindhyabasini Agro Product Pvt. Ltd., Rohtas. Proposal for establishment of 04 MT per hour
capacity Rice Mill at Khairahin, Bahuara,
Dawath, Rohtas.
9.6154 25 09-Apr-12 - -
218 M/S Shree Hari Jee Agro Products Pvt. Ltd., Rohtas. Proposal for establishment of 10 MT per hour
Modern Para Boiled and Raw Rice Mill unit at
Bairi Karmaini Kala, Bikramganj, Rohtas.
11.7418 30 11-Jun-12 - -
219 M/S Sumedha Agro Products Pvt. Ltd., Sasaram. Proposal for establishment of 18000 MT per
year capacity Modern Rice Mill unit at Hurka
Tillauthu, Dehri-on-Sone, Rohtas.
8.8314 30 11-Jun-12 - -
220 M/s Sone Ganga Modern Rice Mill Pvt. Ltd. Patna 64 MT Per day capacity Modern Arwa Rice Mill
unit at Rohtas
4.5864 41 28-Nov-12 - -
221 M/s Sri Pawansut Food Industries Pvt. Ltd. Rohtas. 4 MT per hour Modern Rice Mill unit at Nokha,
Rohtas.
7.41 35 28-Nov-12 - -
222 M/s Maa Yakshini Food Processing Pvt. Ltd., Dinara, Rohtas. 30000 MT Per year capacity Modern Ricr Mill
unit at Dinara, Rohtas
6 21 28-Nov-12 - -
223 M/s Gajanan Siddhi Vinayak Foods Pvt. Ltd., Hajipur 16 MT per hour Modern Rice mill unit at Padri,
Chanari, Rohtas.
30.6523 50 28-Nov-12 - -
224 M/s Parampuri Rice Mills Pvt. Ltd. Raipurchor, Sasaram. 5 MT Per hour modern Rice mill unit at
Sasaram
4.835 69 28-Nov-12 - -
225 M/s Maa Bhawani Super Agro Products Pvt. Ltd. Rohtas. 19200 MT per year Capacity Rice Mill unit at
Paduhar, Rohtas
5.9577 12 28-Nov-12 - -
226 M/s Shiv Shakti Rice Mill, Dinara, Rohtas 7200 MT per year capacity Arwa Rice Mill unit
in propreitorship at chorpokhar English,
Rohtas.
1.05 30 28-Nov-12 - -
227 M/s Pashupati Modern Rice Mill Pvt. Ltd., Rohtas. Proposal for establishment of 19,200 MT per
year capacity Rice Mill unit at Sagarpur,
Ghordihan, Kargahar, Rohtas.
4.2726 20 02-Jan-13 - -
228 M/s Anirudhjee Modern Rice Mill Pvt. Ltd., Sasaram Proposal for establishment of 06 MT per hour
Para Boiled Rice Mill unit at Sukulpur, Barki
Mahuli, Kargahar, Rohtas.
8.9987 17 02-Jan-13 - -
229 M/s Arya Agrofood Pvt. Ltd., Sasaram. Proposal for establishment of 28,800 MT per
year capacity Modern Rice Mill unit at
Adampur, Sasaram, Rohtas.
5.9257 54 08-Feb-13 - -
230 M/s Laxmi Mini Rice Mill, Rohtas. Proposal for establishment of 6400 MT per
year capacity Arwa Rice Mill unit in
propretorship at Bilaspur, Kargahar, Rohtas.
1.3624 9 08-Feb-13 - -
231 M/s Sone Ganga Seeds, Rohtas. Proposal for establishment of 10,800 MT per
year capacity Seed Processing unit at in
partnership at Industrial Area, Bikramganj,
Rohtas.
1.2 30 13-Mar-13 - -
232 M/s Shri Sita Ram Jee Modern Rice Mill Pvt. Ltd., Rohtas. Proposal for establishment of 19,200 MT per
year capacity Rice Mill unit at Karup,
Bhabhuani, Kargahar, Rohtas.
5.6765 20 13-Mar-13 - -
233 M/s Maa kali Super Agro Products Pvt. Ltd., Dehri-on-Sone,
Rohtas.
Proposal for establishment of 19,200 MT per
year Capacity Rice Mill unti at Akorigola,
Rajapur Road, Rohtas.
8.3535 18 13-Mar-13 - -
234 M/s Maa Parvati Agrotech & Food Pvt. Ltd. Natwar Rohtas. Proposal for establishment of 9,600 MT per
year capacity Arwa Rice Mill at Natwar, Rohtas.
2.5 30 13-Jan-13 - -
235 M/S Mega Rice Mill Pvt. Ltd, Jehanabad Proposal for establishment of 3 MT per hour
capacity Rice Mill at Algana, Jehanabad.
1.17 10 23-Mar-10 02-Jan-12
236 M/S Satbhani Agro Pvt. Ltd, Aurangabad. Establishment of 10 MT per hour capacity
Modern Rice Mill, 4 MT per hour capacity
Sortex and Packaging unit, 7000 MT capacity
Warehouse and 1.2 MW Husk based Power
Plant at Aurangabad.
10.77 36 01-Feb-10 - -
26
237 M/S Maa Mundeshwari Agro Mills Pvt. Ltd., Aurangabad. Proposal for establishment of 4 MT per hour
capacity Modern Rice Mill and 1000 MT
Warehouse at Growth Centre, Aurangabad.
2.59 30 23-Mar-10 02-Jan-12
238 M/S Bhaskar Rice Mill Pvt. Ltd, Aurangabad. Proposal for establishment of 04 MT per hour
capacity Rice Mill, 1000 MT Warehouse and
125 KVA Gasifier at Biratpur, Malitola,
Aurangabad.
1.5392 35 12-Jan-11 - -
239 M/S Unique Food Industries, Aurangabad. Proposal for establishment of 05 MT per hour
Rice Mill, 2000 MT Warehouse and 250 KVA
Gasifier unit in proprietorship at Aurangabad
Industrial Area, Aurangabad.
1.3862 35 27-Jul-11 16-Feb-12
240 M/S Maa Mundeshwari Agro Mills Pvt. Ltd, Aurangabad. Proposal for establishment of 12000 MT per
year capacity Roller Flour Mill unit at Industrial
Area, Aurangabad.
3.7519 30 27-Jul-11 - -
241 M/S Narmedeshwar Rice Mills Pvt. Ltd, Howrah, West
Bengal.
Proposal for establishment of 08 MT per hour
Modern Rice Mill unit and 4 Warehouse of
5000 Square Feet at Industrial Growth Centre,
Aurangabad.
9.629 60 27-Jul-11 08-Jan-12
242 M/S Nutrilite Agro Products Pvt. Ltd., Delhi. Proposal for establishment of 08 MT per hour
capacity Modern Para Boiled Rice Mill and 1
MW Husk Based Power Generation unit at
Sinduria, Barun, Aurangabad.
18.55 160 23-Feb-12 - -
243 M/S Jay Mata Rani Food and Grains Pvt. Ltd., Aurangabad. Proposal for establishment of 08 MT per hour
Para Boiled and Raw Rice Mill at Kaithi Siro,
Goh, Aurangabad.
7.2634 25 09-Apr-12 - -
244 M/s K.K. Rice Mill, Aurangabad. 03 MT per hour Modern Rice Mill (Arwa and
Usna) unit in proprietorship at Industrial
Growth Centre Aurangabad
2.356 15 18-Sep-12 - -
245 M/s Ayush Rice Mill Aurangabad 36000 MT per year capacity Arwa Rice Mill and
Boiled rice Mill unit in proprietorship at
Industrial Growth Centr, Jasoiya More
Aurangabad
2.71 9 18-Sep-12 - -
246 M/s Imperial Agrotech Pvt. Ltd. Patna 36,000 MT per year capacity Modern Rice Mill
unit at Industrial Growth Centre, Aurangabad
2.9316 9 18-Sep-12 - -
247 M/s Swastik Rice Mill Aurangabad 19200 MT per year capacity Arwa Rice Mill unit
in proprietorship at Industrial Area, Barun
1.926 51 18-Sep-12 - -
248 M/s Maa Padmawati Agro Foods Pvt. Ltd, Aurangabad. 76800 MT Rice Mill unit at-Vill-Radhua, Post-
Siris, Dist-Aurangabad.
17.4476 48 18-Sep-12 - -
249 M/s Raj Mani Agro Pvt. Ltd. Daudnagar, Aurangabad 50 MT per hour Modern Rice Mill unit under
R.A.B.C at Daudnagar, Aurangabad
9.6913 50 28-Nov-12 - -
250 M/s GSR Agro Mills Pvt. Ltd. Aurangabad Proposal for establishment of 4.5 MT per hour
capacity Modern Rice Mill Unit at Growth
Center, Aurangabad
6.045 48 08-Feb-13 - -
251 M/s Baba Baijnath Agro Pvt. Ltd., Aurangabad. Proposal for establishment of 12,000 MT per
year capacity Rice Mill unit at Tengra Barun,
Aurangabad.
8.2283 20 13-Mar-13 - -
252 M/s Kanhaiya Jee Rice Mill Pvt. Ltd. Aurangabad. Proposal for establishment of 06 MT per hour
Modern Rice Mill unit at Industrial Growth
Centre, Aurangabad.
3.903 128 13-Mar-13 - -
253 M/S Sivaani Agribusiness Pvt. Ltd, Gaya Establishment of 30 MT per day capacity Dal
Mill at Dhanua, Dovi Road, Gaya.
3 20 30-Nov-09 - -
254 M/S Nilkanth Chawal Mills Pvt. Ltd, Kolkata. (Approval was
given for Modernisation of the existing Rice Mill with the
capacity of 10,692 MT per year at Conch, Gaya. Again on
request of the company, ap
Proposal for Modernisation of the existing unit
of Rice Mill of 10,692 MT per year capacity at
Ahiyapur, Konch, Gaya. Proposal for capacity
expansion from 54 MT per day to 90 MT per
day in the existin
3.3634 19 26-May-11 25-May-10
255 M/S Kolhaura Rice Mill Pvt. Ltd., Gaya. Proposal for establishment of 48 MT per day
capacity Modern Arwa Rice Mill unit at
Kolhaura, Bodh Gaya.
2.63 41 26-Mar-12 - -
256 M/s Vishnu Industries, Gaya 4800 MT per year capacity Dal Mill unit in
partnership at Industrial Area, Gaya
1.703 34 18-Sep-12 - -
257 M/S Natraj Agro and Herbs Pvt. Ltd, Nawada Establishment of 4 MT per hour capacity
Modern Rice Mill and 1200 MT Warehouse at
Konchgaon, Warsaliganj, Nawada.
1.48 20 08-Mar-10 25-May-10
258 M/S Ganesh Laxmi Rice Mills Pvt. Ltd, Rajauli, Nawada. Proposal for establishment of 1,20,000 MT per
year capacity Rice Mill at Chautha, Nawada.
2.0203 24 27-Jul-11 - -
259 M/s Shalimar Pellet Feeds Pvt. Ltd., Kolkata. 133.12 Lac pieces per year capcity Day-old
Chicks production unit at Pandaul Industrial
Area, Madhubani.
4.66 24 28-Sep-12 - -
260 M/s Shikha Breeding Farm & Hatchery, Muzaffarpur 48 Lakh pieces per year capacity Day-Old
Chicks (Hatchery) unit in proprietorship at
Industrial Area, Donar, Darbhanag.
1.4938 23 18-Sep-12 - -
27
261 M/s Sony Air Gases Industries, Begusarai 900 Cubic Meter per year capacity Medical and
Industrial Oxygen, Lequid Nitrogen and
Nitrogen Gas production unit in partnership at
Industrial Area, Barauni, Begusarai
3.1146 38 13-Aug-12 - -
262 M/s New Patliputra Gas Manufacturers Ramgarh (Jharkhand) Industrial and Medical Oxygen, Carbondioxide
Gas, Nitrogen Gas, Argon Gas, Dry Ice Mixed
Gas production unit in partnership at Barari
Industrial Area, Bhagalpur
5.1185 40 18-Sep-12 - -
2490.1202 23425
1 M/s Ankur Business Pvt. Ltd. Kolkata. 30,000 MT per year capacity Packaging of
lodised Salt unit at Fatuha Industrial Area,
Fatuha, Patna.
2.575 141 18-Sep-12 - -
2.575 141
1 M/S R.M. Industries, Ara, Bhojpur. Proposal for establishment of manufacturing
unit of 600 MT per year capacity of Brass
utensils in proprietorship at Industrial Area,
Growth Centre, Giddha.
1.3293 29 28-Sep-11 - -
1.3293 29
1 M/s Tegh Bahadur Carbons Pvt. Ltd. Begusarai 19,800 MT per year capacity Calcined
Petroleum Coke procuction unit at Barauni
Industrial Area, Begusarai
4.8 31 18-Sep-12 - -
2 M/s Mahabir Petroleum Products, Begusarai 100 MT per day Calcined Petroleum Coke
Production unit in proprietorship at Barauni
Industrial Area, Barauni
3.05 31 18-Sep-12 - -
3 M/S Titagarh Biotech Pvt. Ltd., Kolkata Establishment of Jatropha based Bio-diesel
Plant at Banka
51 40 25-Feb-08 - -
58.85 102
1 M/S Harinagar Sugar Mills Ltd, Harinagar. Proposal for establishment of 14.5 MW new
Power Project at Bagaha, Harinagar.
77.5 29 19-Apr-10 10-Apr-11
2 M/S I.L. & F.S, 4 B, 1st Floor, S.K. Puri, Patna Proposal for establishment of 500 MW Power
Plant in Muzaffarpur District
2223.4 500 25-Feb-08 - -
3 M/S Vikash Metal & Power Ltd., Kolkata Establishment of 2x250 MW Power Plant at
Begusarai
1350 1000 12-Mar-07 - -
4 M/S India Power Corporation Ltd., Vishwakarma, 86 C,
Topsia Road(South), Kolkata-700046 (Company's proposal
approved by SIPB on 02.01.08 for establishment of 1650 MW
Coal Based Thermal Power Plant in
Establishment of 1320 (2x660) MW Coal Based
Thermal Power Plant at Indragachi,
Sangrampur (Areraj), East Champaran
7280 650 21-Jul-10 05-Apr-11
5 M/s Riga Sugar Comany Ltd. Kolkata. 03 MW New Co-generation Power Plant in
addition to the existing 8 MW Co-generation
Power Plant in sugar Mill at Riga, Sitamarhi
3.5 666 28-Nov-12 - -
6 M/S Kandla Energy and Chemicals Ltd., Ahmedabad, Gujarat. Proposal for establishment of 2 X 250 MW coal
based Thermal Power Plant in two phase at
Sahebpur Kamal, Begusarai.
2750 250 11-Jun-12 - -
7 M/s Cement Manufacturing Co. Ltd., Kolkata. Proposal for establishment of 2x250 MW
Thermal Power Plant at Kahalgaon
1650 225 26-Mar-07 - -
8 M/S Ganga Power & Natural Resources Ltd., 14 th
Netaji Subhas Road, 2nd Floor, Kolkata-700001 (Name has
been changed form M/S Neepaz Thermal Energy Ltd to
Adhunik Power & Natural Resources Ltd
Proposal for establishment of 2640 MW Coal
based Thermal Power Plant in two phases at
Pirpainti, Bhagalpur (Approval has been given
for establishment of 1320 MW in place of 1000
MW in SIPB meeting hel
15079 1450 12-Jan-11 23-Sep-08
9 M/S Nalanda Power Company Limited, R.P.G. Group, C.E.S.C
House, Chaurangi Square, Kolkata- 700001 (Name has been
changed form M/S C.E.S.C. Limited to M/S Nalanda Power
Company Limited)
Setting up of 1800 MW Coal based Thermal
Power Plant at Pirpainti or other suitable
place.
7290 0 09-Jun-08 12-Aug-08
10 M/S Essar Power (Jharkhand) Limited, Next to Tirath
Mansion, Near Over Bridge, Main Road, Ranchi
Establishment of Thermal Power Plant of
3x600 MW capacity at Pirpainti, Bhagalpur.
8130 2200 29-Sep-08 - -
11 M/S Usha Martin Ltd, New Delhi. Establishment of 1200-1320 MW Coal based
Thermal Power Plant at Kahalgaon/ Pirpainti,
Bhagalpur.
6000 500 29-Jun-09 - -
12 M/S Sarvottam Infrastructure Pvt. Ltd, Kolkata. Establishment of 540 MW coal based Thermal
Power Plant at Kahalgaon
2250 610 17-Aug-09 - -
13 M/S AES Patliputra Energy Pvt. Ltd, Gurgaon, Haryana.
(Approved proposal of M/S AES India Pvt. Ltd on 11.08.10 for
establishment of 1320 MW (2x660 MW) coal based Thermal
Power Plant at Jagdishpur, Bha
Proposal for establishment of 1320 MW (2x660
MW) coal based Thermal Power Plant at
Jagdishpur, Bhagalpur.
8120 300 25-Feb-11 - -
14 M/S Era Infra Engineering Ltd, New Delhi. Proposal for establishment of 2640(4x660) MW
coal based Thermal Power Plant at Rajauli,
Nawada and 1320(2x660) MW coal based
Thermal Power Plant at Pirpainti, Bhagalpur.
22174 1050 25-Feb-11 - -
TOTAL :-
Salts, Sulpher, Plastering materials, Lime & Cement
TOTAL :-
Ores (Base metal), Slag Ash
TOTAL :-
Mineral Fuels; oils, products & by- products
TOTAL :-
Electrical Energy
28
15 M/s Keventer Food Park Infra Ltd. Bhagalpur 20 MW Coal based Captive Power Plant unit at
Kahalgaon Industrial Area, Bhagalpur
130 100 13-Aug-12 - -
16 M/S Jas Infrastructure and Power Ltd, Mahabir Tower, Main
Road, Ranchi (Amending the earlier proposal approved on
11.07.08 and approval has been given on change of
Company's name from M/S Jas Infrastr
Establishment of 2640 MW coal based Thermal
Power Plant in two phases (each phase 2x660
MW) at Banka. (Proposal for 2640 MW
Thermal Power Plant in place of
1215(9x135MW) MW Thermal Power Plant)
11120 5000 26-May-11 11-Mar-08
17 M/S Arisson Power Ltd, Kolkata Proposal for establishment of 1320 MW Coal
Based Thermal Power Plant at Prabhawati
Nagar, Banka.
7260 145 24-May-10 - -
18 M/S Dalmia Power Ltd, New Delhi. (Amending the proposal
approved on 25.02.11 for establishment of 1320(2x660) MW
coal based Thermal Power Plant at Dona, Banka, approval
has been given for establishmen
Proposal for establishment of 2640 (4x660)
MW Coal based Thermal Power Plant at Dona,
Banka
14600 1500 23-Feb-12 - -
19 M/S Subhas Projects and Marketing Ltd., 22 Camac Street,
Block-A, 3rd Floor, Kolkata-700016
Setting up of 1200 MW Thermal Power Plant at
Rampur, Dist.- Lakhisarai, Bihar
5000 400 02-Jan-08 - -
20 M/S Lakhisarai Bijlee Company Pvt. Ltd., New Delhi Establishment of 1320(660x2) MW Coal based
Thermal Power Project at Kajra, Lakhisarai
6810 600 09-Feb-09 10-May-11
21 M/S Mirach Power Ltd, Gurgaon, Haryana. (Amending the
earlier proposal approved on 11.08.10, approval has been
given on change of Company's name from M/S Mirach
Power Pvt. Ltd. to M/S Mirach Power Ltd
Proposal for establishment of 1320 MW
(2x660MW) coal based Thermal Power Plant at
Lakhisarai.
7359.6 600 27-Jul-11 - -
22 M/S Casecade Power Ltd, Lakhisarai. Proposal for establishment of 1320 (2x660)
MW coal based Thermal Power Plant at
Lakhisarai District in Bihar.
8343.5 400 25-Feb-11 - -
23 M/S Moser Baer Power and Infrastructures Ltd, New Delhi. Proposal for establishment of 1980 MW Coal
based Thermal Power Plant at Morma,
Lakhisarai.
11000 2000 26-May-11 - -
24 M/S Adani Power Ltd., Ahmedabad, Gujarat. Proposal for establishment of 1320 MW coal
based Super Critical Thermal Power Plant at
Lakhisarai.
7707.57 600 28-Sep-11 - -
25 M/S Krishak Bharti Cooperative Ltd., A-10, Sector-1, Noida-
201301, Dist. Gautambudh Nagar(U.P.)
Proposal for establishment of 1320 MW coal
based Power Project at Bihta/
Lakhisarai/Banka/Dehri
6200 800 17-Mar-08 - -
26 M/S ATN Agro Products Ltd., Patna. Proposal for establishment of 2000 MW
Thermal Power Plant at Babura, Bhojpur.
11500 160 23-Feb-12 - -
27 M/S Buxar Bijlee Company Pvt. Ltd., New Delhi Establishment of 1320 MW Coal based Thermal
Power Project at Chausa, Buxar
6795 600 09-Feb-09 10-May-11
28 M/S Sone Ojas Ltd.(Pro.- M/S Kalyanpur Cements Ltd.),
Patna.
Proposal for establishment of 15 MW Co-
generation Captive Power Plant (based on Coal
and Waste Heat of Cement Plant) at Banjari,
Kalyanpur, Rohtas.
100 54 11-Jun-12 - -
29 M/S Triton Energy Limited, "Indiabulls House" 448-451,
Udyog Vihar, Phase-V, Gurgaon-122001
Establishment of 1320 MW coal based mega
thermal power plant at vill Kochar, Tehsil-
Barun, Dist.-Aurangabad. (Change of place
from Navinagar, Aurangabad to vill- Kochar,
Tehsil-Barun, Dist.-Aurangabad
6573.5 400 19-Oct-09 29-Dec-09
30 M/S East West Power Generation Company Ltd., Maharastra Proposal for establishment of 1000 MW coal
based Thermal Power Plant at
Kahalgaon/Aurangabad
5000 700 18-Nov-08 - -
31 M/S Global Powmin Ltd., Kolkata (Amending the proposal
approved on 08.06.10 for establishment of 2640 MW coal
based Therma Power Plant at Sirdala(Nawada), approval has
been given for establishment of
Proposal for establishment of 2640(4x660) MW
Coal Based Thermal Power Plant at Sirdala
(Nawada)-Fatehpur(Gaya).
14908.4 400 26-May-11 - -
32 M/S Diwakar Solar Projects Pvt. Ltd, Hyderabad. Proposal for establishment of 15 MW Solar
Photo Voltaic Power Plant at Kumarbagh
Industrial Estate, Bettiah.
253.5 15 08-Jun-10 - -
33 M/S Sri Avantika Contractors (I) Ltd., Hyderabad. Proposal for establishment of 05 MW Grid
Connected Solar PV Power Project at
Rampurwa, Gaunaha, West Champaran.
76.9 31 23-Feb-12 - -
34 M/s SAR capital Pvt. Ltd., New Delhi Proposal for establishment of 10 MW Solar
Photo Voltaic Power Plant unit at Sangrampur
Block Indragachi, East Champaran.
100 120 13-Mar-13 - -
35 M/S Sandeep Sijol Infrastructure Pvt. Ltd, Mumbai Proposal for Generation of Electricity from 3
MW Solar Photo Voltaic Modules at
Madhubani / Samastipur / Vaishali.
57 23 24-May-10 - -
36 M/s Claro Energy Pvt. Ltd., New Delhi 60 MW Solar Power Plant unit at Basantpur,
Supaul.
660 170 18-Sep-12 - -
37 M/S Stef Energy India Pvt. Ltd., New Delhi. Proposal for establishment of 03 MW Solar
Photo Voltaic Power Project unit at
Udakishanganj, Madhepura.
50.7 40 09-Apr-12 - -
29
38 M/s Birla Urja Ltd. Mumbai 10 MW Solar Photo Voltaic Solar Power Plant
unit at
Darbhanga/Bhagalpur/Munger/Gaya/Muzaffar
pur
114.31 250 18-Sep-12 - -
39 M/S Abacus Holdings Pvt. Ltd, Kolkata. Establishment of 05-05 MW Grid Connected
Solar Photo Voltaic Power Project at
Muzaffarpur, Gaya, Bhagalpur and Purnea.
392.48 96 11-Jan-10 - -
40 M/S Bhilwara Energy Ltd, Noida, Uttar Pradesh. Proposal for establishment of 10 MW Solar
Energy Power Generation Plant at
Muzaffarpur.
169 20 28-Sep-11 - -
41 M/S P & R Infraprojects Ltd., Chandigarh, Punjab. Proposal for establishment of 10 MW PV Solar
Power Plant at Muzaffarpur.
130 100 16-Apr-12 - -
42 M/s Agritech Engineering Pvt. Ltd. Bangalore. Proposal for establishment of 05 MW Solar
Power Plant at Muzaffarpur.
69.9715 10 13-Mar-13 - -
43 M/S Alex Green Energy Pvt. Ltd., Kolkata. Proposal for establishment of 25 MW Solar
Energy Power Plant at Goryakothi, Siwan.
312.5 1875 09-Apr-12 - -
44 M/S Kaushalya Infrastructure Development Corporation Ltd.
Kolkata.
Proposal for establishment of 25 MW Solar PV
Power Plant unit at Khulasa, Siwan.
312 0 09-Apr-12 - -
45 M/S Claro Energy Pvt. Ltd, New Delhi. Proposal for establishment of 20 MW Solar
Power Plant at Sahjadpur, Sarairanjan,
Samastipur.
240 100 11-Jun-12 - -
46 M/S Claro Energy Pvt. Ltd, New Delhi. Proposal for establishment of 2x5 MW Solar PV
Power Project at Gopalganj and Khagaria.
160 500 27-Jul-11 - -
47 M/S Moser Baer Clean Energy Ltd., New Delhi. Proposal for establishment of Solar Power
Project of 25 MW at Chakia, East Champaran,
20 MW at Ramnagar, East Champaran and 40
MW at Katoria, Banka.
1318 4200 28-Sep-11 - -
48 M/S Alex Green Energy Pvt. Ltd., Kolkata. Proposal for establishment of 50 MW Solar
Energy Power Plant at Katoria, Banka.
640 3750 09-Apr-12 - -
49 M/s Orion Solar Products Pvt,Ltd, Pro-Lanco Group, Gurgaon,
Haryana.
15 MW P.V. Solar Power Project unit each at
three Places in Phulli Dumar Block, Banka.
450 60 18-Sep-12 - -
50 M/s Renew Power Ventures Pvt. Ltd. Gurgaon, Haryana Proposal for establishment of 10 MW Solar
Photo Voltaic Plant unit at
Banka/Lakhisarai/East Chmaparan
100 0 08-Feb-13 - -
51 M/s Renew Power Ventures Pvt. Ltd. Haryana. Proposal for establishment of 50 MW Solar
Voltaic Plant unit at Banka/Lakhisarai/East
Champaran
500 0 08-Feb-13 - -
52 M/S SREI Infrastructure Finance Limited, 'Vishwakarma' 86 C,
Topsia Road(South), Kolkata.
Establishment of 5 MW Grid Interactive Solar
Power Plant at Jamalpur
116 30 09-Feb-09 - -
53 M/s Simplex Infrastructures Ltd., Kolkata. 25 MW Solar Power Project unit at Khaira,
Suryagadha, Kakhisaria.
276.6027 1200 18-Sep-12 - -
54 M/s Chandrika Infra Pvt. Ltd. New Delhi 02 MW Solar P.V. Power Plant unit at Fatehli
Deepnagar, Nalanda
20 12 18-Sep-12 - -
55 M/S Reliance Industries Ltd. Establishment of 5 MW Solar Power Plant at
Patna
0 0 25-Feb-08 - -
56 M/s Roha Dye Chem Pvt Ltd., Mumbai Proposal for establishment of 25 MW Solar
Photo Voltaic power plant unit at
Patna/Jahanabad/Nalanda.
225 50 08-Feb-13 - -
57 M/s Telesolar Solutions Pvt. Ltd. Chennai. Proposal for establishment of 1200 KW Solar
Power Generation unit at 200 different places
in addition to the existing Solar Power unit of
120 KW capacity at 200 different places in
Bihar for Telecom Tower.
20 40 13-Mar-13 - -
58 M/S Avant Garde Re-Energy Ltd, Kolkata. Proposal for establishment of 10 MW Solar PV
Power Plant unit at Bhojpur/Saran/Bhabhua.
160 31 27-Aug-10 - -
59 M/s Intech Infrastructure Pvt. Ltd., Gurgaon, Haryana. 25 MW Solar Plant unit at Bihiya, Ara. 312.5 0 18-Sep-12 - -
60 M/S Schanti Partners LLC, New York. Proposal for establishment of 10 MW Solar
Energy generation unit at Kaimur.
153 210 28-Sep-11 - -
61 M/s Ruchi Soya Industries Ltd., Kaimur, bhabhua. Proposal for establishment of 10 MW Solar
Power Plant at Karnpura, Durgawati, Kaimur.
85.24 10 13-Mar-13 - -
62 M/S Indsolar Renewables Pvt. Ltd., Harihar Singh Road,
Morabadi, Ranchi. (Canceling the company's earlier
approved proposal to set up 5 MW Solar Thermal Power
Project with earlier name(Indsolar India)
Establishment of 2 MW Power Plant based on
Solar Photo Voltaic Technology and 3 MW
Solar Thermal Power Generation Plant at
Aurangabad
26.74 20 19-Oct-09 - -
63 M/S Astonfield Renewable Resources Ltd, New Delhi Establishment of 300 MW Solar Power Plant(5-
25 MW size) in first phase at Dist.-Gaya,
Sasaram, etc and in second phase at Dist.-
Muzaffarpur, Madhubani, West Champaran,
Bhojpur and Patna, etc
4500 5000 30-Nov-09 - -
30
64 M/S Chaucer Capital, London. Proposal for establishment of 20 MW Solar
Power Project unit at Dobhi, Barachatti, Gaya.
328.5 125 27-Jul-11 - -
65 M/S Electronic Equipment Company Pvt. Ltd., Kolkata. Proposal for establishment of 03 MW Grid
connected Solar PVC Power Project at
Gaya/Buxar or Chhapra.
57 50 23-Feb-12 - -
66 M/s Acme Tele Power Ltd Gurgaon, Haryana 30 MW Solar Photo Voltaic Power Plant unit at
Gaya
350 280 18-Sep-12 - -
67 M/s Simplex Infrastructures Ltd., Kolkata. 25MW Solar Power Project unit at Mahuli,
Guraru, Gaya
276.6027 1200 18-Sep-12 - -
68 M/s Solar Field Energy Four Pvt. Ltd. and L & T, Mumbai Proposal for establishment of 100 MW Solar
Power Project unit at Gaya/Hajipur
1050 2875 08-Feb-13 - -
69 M/S Glatt Solutions Pvt. Ltd, Kolkata (Approval was given on
11.01.10 in SIPB meeting for establishment of 03 MW Grid
connected Solar Photo Voltaic Power Project at
Muzaffarpur/Purnea. Again on reques
Establishment of 3 MW Grid Connected Solar
Photo Voltaic Power Project at Nawada
57 22 26-May-11 - -
70 M/S Responce Renewable Energy Ltd, Kolkata. (Earlier on
27.07.11 approval was given for establishment of Power
Generation unit with the help of 25 MW Solar PV Modules at
Madhubani, Buxar or Chapra. Ag
Proposal for establishment of Power
Generation unit with the help of 25 MW Solar
PV Modules at Nawada.
425 150 26-Mar-12 - -
71 M/s Weispun Renewables Energy Ltd. Delhi Proposal for establishment of 100 MW Solar
Power Project unit at Nawada.
1000 200 08-Feb-13 - -
72 M/S KKK Biomass Power Pvt. Ltd, Faridabad, Haryana. Proposal for establishment of 02 MW Biomass
based Power Plant at Industrial Area, Purnea.
11 50 12-Jan-11 - -
73 M/S Yugal Green Urja Solutions Pvt. Ltd., New Delhi. Establishment of 750 KW Biomass based Power
Plant at Goriakothi, Siwan.
3.55 20 19-Oct-09 - -
74 M/S Saran Renewable Energy Pvt. Ltd., Chapra Generation of 240 K.W Electricity from Biomass
based Gasification System at Garkha, Saran.
1.45 14 19-Mar-07 - -
75 M/S Saran Renewable Energy Pvt. Ltd., Chapra Generation of 10 MW Electricity from Biomass
based Gasification System at Garkha, Saran.
50.8 20 24-Sep-07 - -
76 M/s Udhyam Vihar Industrial Infrastructure Corporation Ltd.,
Patna
3500 KW Biomass Based (Rice Husk) Power
Plant unit in the name of Technoculture
Building Centre Pvt. Ltd.at Sonpur, Chapra.
9.5219 25 18-Sep-12 - -
77 M/S MPOT Energy Ventures Pvt. Ltd., Hyderabad. Proposal for establishment of 500 MW Natural
Gas Based Combined Cycle Duel Fuel Thermal
Power Plant at Rupauli, Ujiarpur, Samastipur.
2250 240 23-Feb-12 - -
78 M/S Skand Agri Power Pvt. Ltd, Patna. Proposal for establishment of Biomass Based
Power Plant of 7.5 MW each at Dehri, Rohtas
and Industrial Area, Kahalgaon, Bhagalpur.
92.63 60 27-Aug-10 - -
79 M/S I L & FS Renewable Energy Ltd, Mumbai Establishment of 12 MW biomass based Power
Project at Banka.
50.17 92 17-Aug-09 - -
80 M/S Emergent Ventures India Pvt. Ltd, Gurgaon, Haryana
(On request of M/S Emergent Ventures India Pvt. Ltd for its
Gaya project, approval has been given to its new subsidiary
company namely M/S Tathag
Proposal for establishment of 12 MW biomass
based Power Plant in each district namely
Nalanda, Nawada, Jehanabad, Arwal, Bhojpur,
Patna and Banka.
358 90 26-May-11 - -
81 M/S Astonfield Renewable Resources Pvt. Ltd., 28, Naresh
Mitra Sarani, Kolkata.
Establishment of 100 MW (10x10 MW)
Biomass based Power Plant in 10 district
clusters in Bihar
598 45 29-Sep-08 - -
82 M/S Fox Petroleum Ltd, New Delhi Establishment of 30 MW Power Generation
Plant based on dual fuel (gas &
alternative fuel) technology in each 38 districts
of Bihar.
7899.83 695 19-Oct-09 - -
83 M/S Parijat Next Gen Energy Pvt. Ltd, Bangalore. Establishment of 15 MW (2x7.5 MW) Biomass
based Power Plant at Bihiya, Bhojpur.
73 30 29-Jun-09 - -
84 M/S Dumraon Power Pvt. Ltd., Dumraon. Proposal for establishment of Biomass based
02 MW Captive Power Plant at Gurahatha
Khurd, Buxar.
14.9386 55 11-Jun-12 - -
85 M/S Poorvanchal Urja Pvt. Ltd., R.Z.-1/57, Tuglakabad
Extension, New Delhi-110019
Establishment of 1 MW Renewable Energy
Power Plant (Biomass Based Power Plant in
Buxar Industrial Area)
4 22 23-Oct-06 - -
86 M/S Mundeshwari Bio Energy Pvt. Ltd, Gurgaon, Haryana.
(On request of M/S Emergent Ventures India Pvt. Ltd for its
Kaimur project approval has been given to new SPV
company namely M/S Mundeshwari Bio
Proposal for establishment of 12 MW Biomass
Based Power Plant at Kaimur, Bhabhua.
52 40 12-Jan-11 - -
87 M/s Kushaan Energy Services Pvt. Ltd, Gurgaon, Haryana. Biomass Based Power Project at 04 Places 1-12
MW Biomass Based Power Project at Kaimur, 2-
12 MW Biomass Based Power Project at
Kochase Block, Rohtas, 3-12 MW Biomass
Based Power Project at Dinara Block, Rohtas &
4-12 MW Biomass Based Proer Project Kaimur
288.2408 228 18-Sep-12 - -
31
88 M/S PTC Bermaco Green Energy Systems Ltd., D 73/1 TTC,
Industrial Area , Navi Mumbai (Company's name has been
changed from M/S Bermaco Energy Systems Ltd to M/S PTC
Bermaco Green Energy Systems Ltd on
Establishment of 12 MW Biomass Power Plant
at Sasaram- Rohtas.
56.7988 92 28-Sep-11 - -
89 M/S PTC Bermaco Green Energy Systems Ltd, Navi Mumbai,
Maharastra (Earlier, in the SIPB's 63rd meeting held on
16.12.08 consent was given for establishment of Biomass
based Power Plant for 300 MW(12x2
Proposal for establishment of 300 MW
Biomass Power Plant in 25 different places ( 12
MW in each place) - Bikramganj-Rohtas, Dinara-
Rohtas, Durgawati-Kaimur, Kudra-Kaimur,
Dumraon-Buxar, Jagdishpur-Bho
1254.25 2300 28-Sep-11 - -
90 M/S Orange Powergen Pvt. Ltd, New Delhi. (Earlier, in the
meeting of SIPB held on 29.11.10 consent was given for
establishment of Biomass based Power Plant of 7.5 MW in
Rohtas district, 7.5 MW in Nala
Proposal for establishment of Biomass based
Power Plant of 10 MW in Rohtas district in the
name of new SPV company M/S Rohtas
Biomass Pvt. Ltd., 10 MW in Nalanda district in
the name of new SPV compan
225 125 28-Sep-11 - -
91 M/S Sravanthi Rohtas Energy Pvt. Ltd, New Delhi. (Earlier, in
the SIPB's 95th meeting held on 25.02.11 consent was given
in the name of M/S Sravanthi Infratech Pvt. Ltd, Gurgaon,
Haryana for establish
Proposal for establishment of 450 MW gas
based Power Plant at Dehri-On-Sone, Rohtas.
1620 90 29-Sep-11 - -
92 M/S Sanmati Bio Energy Pvt. Ltd, (Prom.- M/S Emergent
Ventures India Pvt. Ltd), Gurgaon, Haryana (Approval was
given in principle on 18.11.08 in SIPB meeting for
establishment of 12 MW Biomass based P
Proposal for establishment of 12 MW Biomass
based Power Plant at Songwa, Rohtas.
52 40 26-May-11 - -
93 M/S Harit Bio Energy Pvt. Ltd, (Prom.- M/S Emergent
Ventures India Pvt. Ltd), Gurgaon, Haryana (Approval was
given on 18.11.08 in SIPB meeting for establishment of 12
MW Biomass based Power Plant at A
Proposal for establishment of 12 MW Biomass
based Power Plant at Vill-Barwa, Aurangabad.
52 40 26-May-11 - -
94 M/S Minerva Power Corporation Ltd., Secundrabad (A.P.) Proposal for establishment of 15 MW Biomass
Based Power Plant at Gautholi, Barun,
Aurangabad.
70.22 52 23-Feb-12 - -
95 M/S Tathagata Bio Energy Pvt. Ltd, Gurgaon, Haryana. (On
request of M/S Emergent Ventures India Pvt. Ltd for its Gaya
project approval has been given to its new subsidiary
company namely M/S Tathagata
Proposal for establishment of 12 MW Biomass
based Power Plant at Churi, Dist.- Gaya.
52 50 12-Jan-11 - -
96 M/S Howrah Mills Company Ltd., Howrah Proposal for establishment of 05 MW Rice
Husk Based Power Plant at Barsoni, Purnea.
28.5 25 08-Jun-10 - -
97 M/s Technoculture Building Centre Pvt. Ltd. Patna 3.5 MW Rice Husk Based power Plant unit at,
Hajipur, Vaishali
9.52 25 18-Sep-12 - -
98 M/S Millenium Infrastructures Pvt. Ltd., Delhi. Proposal for establishment of 10 MW Waste to
Energy Project(Build Own, Operate Basis) at
Patna.
80 50 23-Feb-12 - -
99 M/S Usher Agro Ltd., Buxar Proposal for additional capacity expansion of
100,000 MT per year and 01 MW Rice Husk
based Power Plant in the existing Rice Mill of
47,600 MT per year capacity.
48.88 100 28-Sep-11 - -
100 M/S Kumar Tech Bio Products Pvt. Ltd, Bangalore.
(Company's proposal for establishment of 30 MW Rice Husk
based Power Plant at Bodh Gaya, Gaya which was approved
in SIPB meeting on 8.03.10, has been a
Establishment of 30 MW Rice Husk based
Power Plant at Kizarsarai Road, Gaya.
306 300 29-Nov-10 20-Dec-11
245942.817 51769
1 M/s Siddhi Bricks, Buxar 75000 pieces per year capacity to 3,93,75,000
pieces per year capacity in the existing
Mechanised Bricks unit in partnership at
Navanagar, Buxar
1.1478 21 18-Sep-12 - -
2 M/S M. D International , NS-9 Industrial Area, Fatuha Establishment of Mineral Powder Production
Plant at Industrial Area, Fatuha
1.8666 22 17-Mar-08 - -
3.0144 43
1 M/S Hargauri Recycling Plant Pvt. Ltd., Siliguri, Darjeeling,
West Bengal.
Proposal for establishment of Recycling unit
for production of Carbon Black, Furnace Oil
and Steel Wire from Waste Tuyre at Kurlicot,
Kiashanganj.
2.0663 13 09-Apr-12 - -
2 M/s Indian Gasohol Ltd.,Tamilnadu. Proposal for setting up of Three Maize
Processing Clusters each with four
independent units to process 1,50,000 Tons
per year of Maize by each unit and 6,00,000
Tons per year of each Cluster.
7200 5000 11-Jul-08 - -
3 M/s Indian Potash Ltd. Chennai Proposal for establishment of 60,000 MT per
year capacity Sulphuric Acid production unit at
Industrial Area, Muzaffarpur.
29.0701 50 08-Feb-13 - -
4 M/S Shyam Industries, Gaziabad Proposal for establishment of 2400 MT per
year capacity Washing Powder unit in
proprietorship at Industrial Area, Fatuha,
Patna.
1.2063 25 26-May-11 - -
TOTAL :-
Non-metallic Mineral, Mineral products Refractories
TOTAL :-
Inorganic Chemical, Compound of precious materials etc
32
5 M/S Premier Cryogenics Ltd, Guwahati. Proposal for establishment of Liquid Oxygen-
10800000 Cubic Meter per year capacity,
Oxygen Gas- 2160000 Cubic Meter per year
capacity, Liquid Nitrogen- 2880000 Cubic
Meter per year capacity, Nitrogen
27 50 26-May-11 - -
7259.3427 5138
1 M/s Shanti Cotton Industries, Muzaffarpur. 123000 Kg. per year capacity Surgical Cotton,
Bandage and Gauze at Industrial Area,
Muzaffarpur
1.0942 22 28-Nov-12 - -
2 M/S Shiva Laboratories Pvt. Ltd., Patna. Proposal for establishment of 3000 MT per
year capacity Ethyl Acetate unit at Shakin-
Kharuara, Harnaut, Nalanda.
2.574 46 23-Feb-12 - -
3 M/S Maruti Meditech Pvt. Ltd., Patna. Proposal for establishment of 1560 MT per
year capacity Disposable Syringe and I.V. Set
production unit at Mirchi Bhavania,
Chowkkalan, Patna.
10.26 25 09-Apr-12 - -
4 M/s Hindustan Medicined Pvt. Ltd. Kolkata. Proposal for establishment of 95,730Litres per
year capacity Drugs and Pharmaceuticals
Formulation unit at Fulwaria, Barauni,
Begusarai.
3.35 27 08-Feb-13 - -
5 M/s Rikon Pharmaceuticals Pvt. Ltd. Patna Allopathic medicine (Tablets, Capsule, Liquid
Syrup, Eye Drop Ointment, Injection Ampoule
and Food Supplement) production unit at
Industrial Area, Fatuha, Patna.
4.716 55 18-Sep-12 - -
6 M/S Jacksons Homeo Patna Proposal for establishment of 48,000 Litres per
year capacity Homeopathic Medicine unit in
proprietorship at Industrial Area E.P.I.P.
Hajipur
1.0035 18 02-Jan-13 - -
7 M/S Maharshi Badri Pharmaceuticals, Jaipur. Proposal for establishment of Awala based
Food Products and Ayurvedic Medicine
(Murabba, Squash syrup) production unit
under proprietorship at Industrial Area,
Giddha, Bhojpur.
1.466 41 09-Apr-12 - -
8 M/S Gyani Distributors, Patna Proposal for establishment of Awala based
Food Products and Ayurvedic Medicine
(Murabba, Squash syrup, etc.) production unit
at Industrial Growth Centre, Giddha, Bhojpur.
1.4275 41 09-Apr-12 - -
9 M/s Dhiraj Herbs Pvt. Ltd., Patna. Proposal for establishment of 7,200 MT per
year capacity Processed Fruits, Vegetables and
Ayurvedic Medicine (Herbal Products)
production unit at Industrial Area, Bihiya,
Bhojpur
10.3798 0 02-Aug-03 - -
10 M/s Yog Badri Pharmaceuticals, Panapur, Patna. Proposal for establishment of 1,15,000 Kg per
year capacity Amla based Food products and
Ayurvedic Medicine Production unit in
proprietorship at Industrial Growth Centre,
Giddha, Bhojpur.
2.655 39 13-Mar-13 - -
38.926 314
1 M/S Leela Anand Fertilizer & Chemicals Pvt. Ltd, Patna Establishment of 60,000 MT per year capacity
N.P.K. Fertilizer unit at Ahiyapur, Turki,
Muzaffarpur.
7.9 67 08-Mar-10 - -
2 M/s Indo Gulf Fertilizers, Uttar Pradesh. 19,800 MT per year capacity Fertilizer and
4,15,800 pieces per year capacity bags
production unit at Bela Industrial Area,
Muzaffarpur
15.5 33 18-Sep-12 - -
3 M/s Shipra Agrotech Pvt. Ltd., Patna 3000 MT per year capacity organci Fertilizer
Bio Fertilizer, Bio Pesticid, Tissue Culture Plant
at Nariar, Panapur, Minapur, Muzaffarpur.
1.1398 12 28-Nov-12 - -
4 M/S Arihant Naturecrop Pvt. Ltd., Vadodara, Gujarat. Proposal for establishment of 2500 MT/Kilo
Litre per year capacity of Bio Fertilizer and Bio
Pesticides unit at Lodipur, Rajgir, Nalanda.
2.3649 46 28-Sep-11 - -
5 M/S Plant Insecticides Industries, Patna. Proposal for establishment of 1200 MT per
year capacity Insecticides and Pesticides
production unit at Industrial Area, Fatuha,
Patna in partnership.
1.5355 31 12-Jan-11 - -
28.4402 189
1 M/S Nandi Soaps Private Ltd., Raxaul Establishment of soap manufacturing plant at
Raxual
6.414 142 19-Mar-07 21-May-07
Essential oil, cosmetics/perfumes, Dental materials; Wash polishing/cleaning materials
TOTAL :-
Pharmaceutical and Medical products excl. dental mate excl. dental materials
TOTAL :-
Fertilizer/Pesticides/Plant protection materials
TOTAL :-
33
2 M/S Laxmivinayak Ventures Pvt. Ltd., Malsalami, Patna City Establishment of one Lakh Ton /Year Detergent
Powder production Plant at Hajipur. (Place has
been changed from Bihta to Hajipur)
20 20 24-Jan-08 14-Jun-08
3 M/S Laxmivinayak Ventures Pvt. Ltd., Patna. Proposal for capacity expansion from 01 Lakh
MT per year capacity to 1.5 Lakh MT per year
capacity in the existing unit of Detergent
powder at Hajipur(Vaishali).
16.94 150 28-Sep-11 - -
4 M/s D.R. Polymer, Patna 900 MT per year Capacity Agarbatti stick
production unit in proprietorship at Industrial
Area, Hajipur, Vaishali
1.0582 27 18-Sep-12 - -
5 M/S Rohit Surfactants Pvt. Ltd., Kanpur Proposal for establishment of 2,50,000 MT per
year capacity Detergent Cake, Detergent
powder, LABSA (Linear Alkaline Benzene
Sulforation, Acid Slurry for Soaps) unit at
Fatuha Industrial Area, Patna.
79 77 28-Sep-11 - -
123.4122 416
1 M/S Khushi Polypack Pvt. Ltd, Muzaffarpur. Proposal for establishment of 672 MT per year
capacity Disposable Glasses and Cup unit at
Industrial Area, Muzaffarpur.
3.1372 44 12-Jan-11 - -
2 M/S Khilani Agro Foods Pvt. Ltd, Hajipur. Proposal for establishment of 12.73 Crore
pieces per year capacity Preform Pet Bottle's
unit at E.P.I.P. Hajipur.
15.77 25 03-May-10 - -
3 M/S Lumbini Beverages Pvt. Ltd, Hajipur. Proposal for capacity expansion from
39971250 Liters per year capacity to 67971250
Liters per year capacity and Modernisation in
the existing unit of manufacturing of PET
Bottle, Aerated Water and Jui
31.89 220 27-Aug-10 07-Oct-11
4 M/s S.K. Plast, Chapra. 4,35,000 pieces per year capacity Pet jar
production unit in proprietorship at Industrial
Area, E.P.I.P., Hajipur
1.08 25 18-Sep-12 - -
5 M/s K.D. Liquor & Fertilizer Pvt. Ltd. Patna 750 Lakh pieces per year capacity pet Bottles
production unit at Fatuha Industrial Area,
Fatuha, Patna.
4.9373 23 18-Sep-12 - -
6 M/s Aricon Polymers, Araia 36000 Pieces per year capacity Water Storage
Tank production unit in proprietorship at
Patna city
1.16 9 28-Nov-12 - -
7 M/s Aastha Fine Packaging Pvt. Ltd, Patna 60 lac pieces per year capacity laminated
Packaging Bags unit at Patna.
1.0891 20 28-Nov-12 - -
8 M/s Guru Mahima Polytech Pvt. Ltd., Buxar 72 Lac liters per year capacity Water Storage
Tank and Plastic Container Production unit at
Industrial Area, Buxar.
1 25 28-Nov-12 - -
9 M/s B.R. Irringation System Katihar 1.20 Lakh pieces per year capacity H.D.P.E.
Pipe (High Density Polyethylene Pipe)
production unit in partnership at Industrial
Growth Centre Maranga Purnea.
1.737 39 18-Sep-12 - -
10 M/S Bihar Agrochem Pvt. Ltd., Patna. Proposal for establishment of 06 Lakh pieces
per year capacity HDPE Pipe(High Density
Polyethylene Pipe) and Sprinkler System
production unit at Nariyar, Panapur, Minapur,
Muzaffarpur.
3.492 34 09-Apr-12 - -
11 M/s Shree Sai Polymers, Muzaffarpur Proposal fro establishment of 300 MT per year
capacity Laminated Multi Colour Pouch unit in
Propretorship at Industrial Area, Muzaffarpur
1.4968 14 02-Jan-13 - -
12 M/s Mithila Polymers Pvt. Ltd., Darbhanga. Proposal for establishment of unit for
production of 480 MT per year capacity P.V.C.
Rigid Pipes at the New Industrial Estate, Bela,
Muzaffarpur
1.9306 20 08-Feb-13 - -
13 M/S Shree Saibaba Plasto Products Pvt. Ltd, Kolkata. Proposal for establishment of 1914 MT per
year capacity Plastic Molded unit at E.P.I.P. ,
Hajipur.
5.62 40 21-Jul-10 - -
14 M/S Shree Tel Fab Industries Pvt. Ltd, Hajipur. Proposal for capacity expansion from 5000 MT
per year capacity to 10,616 MT per year
capacity in the existing unit of P.V.C. Pipe and
P.V.C. Filter at Industrial Area, Vaishali,
Hajipur.
1.35 53 27-Aug-10 - -
15 M/S Sharda Duro Plastics Pvt. Ltd., Patna. Proposal for establishment of 511000 pieces
per year capacity Moulded Plastic Furniture
unit at Hajipur Industrial Area, Vaishali.
5.1606 34 23-Feb-12 - -
16 M/S Vaishali Industrial Products, Hajipur (Vaishali). Proposal for establishment of 100 pieces
Modular Furniture, 100 pieces Hospital
Furniture/Equipment and 100 pieces Office
Furniture per month production unit in
partnership at Hajipur Industrial Area,
1.001 16 11-Jun-12 - -
Plastic, PVC articles incl. Packaging products and footwear plastic or PVCTOTAL :-
34
17 M/s Swastik Plast, Bhagalpur 9000 Pieces per year capacity Rigid PVC Pipes
and Roto Moulded Plastic Storage Tank
Production unit in proprietorship at Industrial
Area, Bhagalpur.
2.484 60 28-Nov-12 - -
18 M/s Tirupati Iron Foundry, Lakhisarai 1224 MT per year capacity RPVC Pipes
Production unit in proprietorship in the
existing unit of Agriculture Implement at
Industrial Area, Lakhisarai
1.5659 15 28-Nov-12 - -
19 M/s Sharma Group of Industries, Aurangabad, Maharastra. Establishment of RPVC-pipes, SWR pipes &
fittings
7.5 0 09-Oct-06 - -
20 M/S National Plastic Industries Ltd, Mumbai. Proposal for production of 5100 MT per year
capacity Plastic Furniture, Plastic Mat and
other Plastic Products at Fatuha Industrial
Area, Patna.
5.75 100 26-May-11 - -
21 M/S Narayan Poly Tube, Siwan. Proposal for establishment of 360 MT per year
capacity PVC Rigid Pipe production unit in
partnership at Industrial Area, Fatuha, Patna.
2.0869 21 27-Jul-11 - -
22 M/S Unibell Polyplast Pvt. Ltd., Patna. Proposal for establishment of production unit
of 2220 MT per year capacity of PVC Rigid Pipe
and Fittings at Bhaghakole, Bikram, Patna.
3.0315 25 28-Sep-11 - -
23 M/S Sanwara Pet Industies, Patna. Proposal for establishment of 480 MT per year
capacity Pet Preform and Plastic Goods
production unit in proprietorship at Simli
Murarpur, Kotia, Malsalami, Patna City, Patna.
1.3562 6 23-Feb-12 - -
24 M/S Malhotra Poly Plast, Patna. Proposal for establishment of 1440 MT per
year capacity PVC Pipe production unit in
partnership at Industrial Area, Patliputra,
Patna.
1.1195 24 23-Feb-12 - -
25 M/S Baba lokenath Agrotech Industries Pvt. Ltd., Patna. Proposal for establishment of 2541 MT per
year capacity HDPE Pipe production unit in the
name of Mahashakti Pipe Industries at Saidpur
Tola, Karauta, Bakhtiyarpur, Patna.
5.4798 20 11-Jun-12 - -
26 M/s J.K. Plast, Patna. 480 MT per year capacity PVC Rigid Pipes
production unit in partnership at Industrial
Area, Fatuha.
2.9247 22 28-Nov-12 - -
27 M/S Takshak Engineering Pvt. Ltd., Patna. Proposal for establishment of 600 MT per year
capacity PVC Rigid Pipe and Pipe Fittings
production unit at Industrial Growth Centre,
Giddha, Bhojpur.
2.6009 21 23-Feb-12 - -
28 M/s Mohit Polytech Pvt. Ltd., Jaipur, Rajasthan 06 Lakh pieces per year capacity HDPE Pipes
(High Density Polyethylene Pipes) and Sprinkler
System Production unit at Industrial Growth
Centre Giddha, Ara.
11.97 86 18-Sep-12 - -
29 M/s B.K. Polytech, Danapur, Digha, Patna. Proposal for establishment of 300 Lac pieces
per year capacity HDPE/PP Bags production
unit in partnership at Industrial Area, Bihiya,
Bhojpur.
8.8191 54 13-Mar-13 - -
30 M/s Jai Mata Di Industries, Vaishali. Proposal for establishment of 5,49 pieces per
year capacity Plastic Moulded Chair production
unit in partnership at industrial Area,
Kumarbagh, Bettiah.
3.5942 27 08-Feb-13 - -
31 M/S National Plasto Products Pvt. Ltd., Kolkata. Proposal for establishment of 4443 MT per
year capacity Plastic Moulded Items
production unit at E.P.I.P., Hajipur.
14.389 41 26-Mar-12 - -
32 M/S Natural Thermo Pvt. Ltd., Gorakhpur, U.P. Proposal for establishment of 576 MT per year
capacity Plastic Disposable Glasses and Cups
production unit at E.P.I.P., Hajipur.
3.5566 39 11-Jun-12 - -
33 M/s Loard Buddha Food Products Pvt. Ltd., Hajipur. Proposal for establishment of 5.49 Lac pieces
per year capacity Moulded Plastic Chair
Production unit at Industrial Area, Hajipur,
Vaishali.
3.3092 43 13-Mar-13 - -
34 M/s Jai Mata Di Industries, Vaishali. Proposal for establishment of 5,49, 120 Pieces
per year capacity Plastic Moulded Chair
production unit in partnership at Industrial
Area, Samastpur.
3.2862 27 08-Feb-13 - -
35 M/s Meceka Graphite Pvt. Ltd., Maharashtra Proposal for establishment 75,000 pieces per
year capacity Graphite Products- Crucible, Dies
and Mould Production unit at Jamalpur
Industrial Area, Munger.
1.32 31 08-Feb-13 - -
36 M/s Jyoti Moulders Pvt. Ltd. Patna 200 MT per Year Capacity expansion in the
existing Plastic Chair and Furniture unit at
Mahul Road, Karmalichak, Patna City, Patna
3.43 8 13-Aug-12 - -
37 M/s Jindal Moulded Furniture Pvt. Ltd. Aligarh 450000 Pieces per year capacity Moulded
Plastic Chair production unit at Industrial Area,
Fatuha, Patna.
2.178 27 18-Sep-12 - -
35
38 M/S Raunak Trade & Agencies Pvt. Ltd, Farbisganj, Araria. Proposal for production of 600 MT per year
capacity PVC Rigid Pipe, 567.54 MT per year
capacity Ice-Cream Cone, Wafer Biscuit and
6000 MT per year capacity Laundry and Toilet
Soap at Industrial Area,
7.9576 141 29-Nov-10 - -
39 M/s SSF Industries Ltd. Hajipur (Vaishali) 600 MT Per Yera Capacity Flexible
Polyurethane Foam production unit at E.P.I.P.,
Hajipur
10.4387 39 13-Aug-12 - -
40 M/s Lord Buddha Food Products Pvt. Ltd. Patna 600 MT per year capacity Plastic Granules
Production unit at Industrial Area, Hajipur
1.4355 21 18-Sep-12 - -
41 M/s Shree Bajrang Foam, Patna 300 MT Per year capacity Polyurethane Foam
unit in Hajipur, Vaishali
2.0592 12 18-Sep-12 - -
42 M/S Maruti Nandan PU Foams Pvt. Ltd, Patna. Proposal for establishment of 300 MT per year
capacity PU Foam (Polyurethane Foam)
production unit at Industrial Area, Fatuha,
Patna.
1.4797 25 12-Jan-11 - -
43 M/s Swastik Poly Plast, Patna 450 K.G. per hour Plastic Granules Production
unit in proprietorship at Industrial Area,
Fatuha, Patna
1.368 28 18-Sep-12 - -
44 M/s Rameshwar Sinha Poly Industries Patna 792 MT per year capacity PVC Regid Pipe at
Industrail area Fatuha, Patna
1.278 27 18-Sep-12 - -
45 M/s J.P. Polyplasts, Patna 1920 MT per year capacity Plastic Granules and
1440 MT Per year capacity poly white
compound Production unit at patna city,
Patna.
1.9003 32 28-Nov-12 - -
201.5203 1663
1 M/s Ramond Ltd., Mumbai. 130200 pieces per year capacity customised
garment production unit in two phases at
Industrial Area, Bihta, Patna
5.2814 188 28-Nov-12 - -
5.2814 188
1 M/S Pack Care Industries, Patna. Proposal for establishment of 1200 MT per
year capacity Corrugated Paper and Boxes unit
in proprietorship at Industrial Area, Fatuha,
Patna.
1.2154 23 27-Jul-11 - -
2 M/S Buddha Packaging Industry, Patna. (Earlier, in the SIPB
meeting held on 27.07.11 consent was given in the name of
M/S Buddha Corrugated Industry for establishment of 120
MT per year capacity Corru
Proposal for establishment of 120 MT per year
capacity Corrugated Paper, Board and Boxes
production unit in proprietorship at Industrial
Area, Fatuha, Patna.
1 23 28-Sep-11 - -
3 M/S Tulsyan Cans & Cardboards Pvt. Ltd., Kolkata. Proposal for establishment of production unit
of 15000 MT per year capacity of Automatic
Corrugated Cardboard Boxes at Bihiya,
Bhojpur.
11.55 260 28-Sep-11 - -
4 M/S Nalanda Paper Mills Ltd., New Delhi. Proposal for establishment of 66,000 MT per
year capacity Craft Paper Production unit at
Bhawnathpur, Sultanganj, Bhagalpur.
204 83 11-Jun-12 - -
5 M/S Shree Vishnu Vishal Paper Mills Pvt. Ltd, Patna Establishment of 33,000 MT per year capacity
Craft Paper and Paper Board and 3 MW
Captive Power Plant at Industrial Area Growth
Centre, Giddha
32.11 182 08-Mar-10 - -
6 M/S The West Coast Paper Mills Ltd, Karnataka. Proposal for establishment of one Lakh MT per
year capacity Duplex Board unit in first phase
at Dalmia Nagar, Rohtas.
350 500 25-Feb-11 - -
599.8754 1071
1 M/S Neutral Publishing House Ltd.(Prabhat Khabar), Old By
Pass Road, Kankarbagh, Patna- 20
Proposal for establishment of Printing,
Publishing of News Papers and Publishing of
Periodical at Patna, Bhagalpur and
Muzaffarpur
38.62 502 25-Feb-08 25-Jul-08
2 M/s Raj Laxmi Udyog, C/O Jain Paper Agency , Rajan
Complex, Naya Tola , Patna.
Off-Set Paper Printing and Paper Conversion
(Place has been changed form Hajipur
Industrial Area to Industrial Area Fatuha in
SIPB meeting on 19.05.08)
1.645 70 19-May-08 25-Jul-08
40.265 572
1 M/S Narayani Packaging Pvt. Ltd, Patna City, Patna.
(Amending the proposal approved on 13.08.10 for 2400 MT
per year capacity corrugated Boxes production unit at
E.P.I.P., Hajipur, approval has been g
Proposal for establishment of 9000 MT per
year capacity Corrugated Boxes production
unit at E.P.I.P., Hajipur.
7.1483 40 23-Feb-12 - -
2 M/S G.M. Exim Pvt. Ltd., Patna. Proposal for establishment of 2400 MT per
year capacity Packing Materials and
Corrugated Boxes production unit at Hajipur
(Vaishali).
4.52 51 23-Feb-12 - -
TOTAL :-
TOTAL :-
Article of leather, Sadlary and harness, Travel goods, Hand bags and similar products of animal gut
TOTAL :-
Paper and Paper board
Printed books, Newspaper, Periodicals, Registers etc.
TOTAL :-
Packing materials and containers of Paper
36
3 M/S Excel Paper Packaging Pvt. Ltd., Patna. Proposal for establishment of 10,200 MT per
year capacity Corrugated Boxes production
unit at Hajipur Industrial Area, Vaishali.
12.05 86 09-Apr-12 - -
4 M/S Om Corrugated Pack Pvt. Ltd., Patna. Proposal for establishment of 7200 MT per
year capacity Corrugated Card Board Boxes
production unit at E.P.I.P., Hajipur.
8.5576 36 23-Feb-12 - -
5 M/s Anupam Dispo Cons, Muzaffarpur 440 MT per year capacity PP Glass and 318
Lakh pieces per year capacity Paper Cup
production unit in proprietorship at Industrial
Area, Bela, Muzaffarpur
2.5168 17 18-Sep-12 - -
34.7927 230
1 M/S Vaishali Thread Mills, Patna City, Patna. Proposal for establishment of 100 MT per year
capacity Sewing Thread production unit in
partnership at Industrial Area, Donar,
Darbhanga.
1.267 18 23-Feb-12 - -
2 M/S Vikramsheela Textile Park Ltd., 10 R.N. Mukherjee Road,
Kolkata- 700001
Establishment of Textile Park at Bhagalpur 120 65 28-May-07 06-Nov-07
121.267 83
1 M/S Dumraon Textiles Ltd., Dumraon, Buxar. Proposal for capacity expansion from 17,160
spindles per year to 17992 spindles per year
capacity in the existing unit of cotton yarn at
Dumraon.
6.7782 707 28-Sep-11 - -
2 M/S Angpradesh Handloom Park Pvt. Ltd., Bhagalpur. Establishment of Handloom Park under Cluster
Business Plan at Bhagalpur.
27.5 5000 16-Jul-07 - -
34.2782 5707
1 M/s I.P. Threads, Dumraon, Buxar 144 MT per year capacity twisted yarn unit in
proprietorship at Dumraon Textiles Residential
Colony, Dumraon.
1.1386 40 18-Sep-12 - -
1.1386 40
1 M/S Winsome International Ltd., Unit:-Rameshwara Jute
Mills, 301,Viashno Chambers(3rd.Floor) 6,Brabourne Road,
Kolkata-1
Proposal for establishment of new Jute Mill of
100 MT/day at Purnea/Kishanganj in Bihar
61 3121 15-Jan-07 - -
2 M/S Punrasar Jute Park Limited, 404, Vaishno Chamber, 6,
Brabourne Road, Kolkta.
Establishment of Jute Hessian Cloth/Sacking
Bags, Jute Yarn and Jute Twine industry at
Moranga Industrial Area, Purnea (Canceling
the above proposal, consent has been given
for Jute Park at Moranga In
40 10000 19-May-08 03-Aug-08
3 M/S Tirupati Commodities Pvt. Ltd., Kolkata. Proposal for establishment of 4870 MT per
year capacity of Jute goods unit at Purnea.
9.6008 660 28-Sep-11 - -
4 M/S Rego Chemicals (P) Limited, 187, Rabindra Sarani,
Kolkata-700007
Proposal for establishment of new Jute Mill of
30 T.P.D. with 2.5 MW Captive Power Plant at
Samastipur
29.65 1250 01-Feb-07 21-May-07
5 M/S Winsome International Ltd, Samastipur ( Unit of M/S
Rameshwara Jute Mills)
Proposal for establishment of 35 MT per day
capacity Jute Processing Unit, 40 MT per day
capacity Corn Flakes manufacturing unit and
establishment of Marketing Complex at
Dharmpur, Samastipur.
160 155 25-Feb-11 - -
6 M/s Ganga Bangali Jute Twine Mills, Begusarai. Establishment of 5840 MT/Annum Capacity of
Jute Yarn.
8.83 600 06-Sep-06 23-Feb-08
7 M/s Harsh Tejas Packaging Pvt. Ltd., Patna. Proposal for establishment of 7,60,800 Kg per
year capacity woven fabric bags production
unit at East Pahari, New Bypass Road Patna.
1.5818 16 13-Mar-13 - -
310.6626 15802
1 M/S Vikash Metal & Power Ltd., Kolkata. Integrated Steel Plant at Begusarai. Sponge
Iron -6.5 Lacs TPA, M.S. Billet- 8Lacs TPA, Blast
furnace- 2.5 Lacs TPA, Captive Power Plant-
100 MW
850 3100 07-Aug-06 24-Mar-07
2 M/S Adhunik Metaliks Ltd, Kolkata (Company's proposal
approved by SIPB on 01.02.10 for establishment of 2.2 MTA
Integrated Steel Plant at Industrial Growth Centre, Bhagalpur
has been amended and conse
Establishment of 2.2 MT PA capacity Integrated
Steel Plant at Kahalgaon, Pirpainti Block,
Bhagalpur.
5668.29 2187 03-May-10 - -
3 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro Establishment of Steel Processing Unit of TMT
Bar with the capacity of one lakh Ton per year
at Gaya
88.76 179 18-May-09 07-Aug-09
4 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro Establishment of 1.55 Lakh Ton Steel
Processing Unit at Kumarbagh, Bettiah.
160.63 293 24-Sep-07 11-Mar-08
5 M/s Pankaj Nirala Steel Pvt. Ltd., Patna. Proposal for establishment of 55.92 T.P.D.
Capacity Iron Ingot unit at Kathpul Chowk,
Kasba, Purnea.
4.1888 30 08-Feb-13 - -
TOTAL :-
Silk and Silk products [ This incl. Art. Silk
TOTAL :-
Cotton, Cotton yarn and Fabrics
TOTAL :-
Syntetic (Man-made) and Mixed textiles
TOTAL :-
Jute, Coir & other natural fiber yarn & textile
TOTAL :-
Iron & Steel (incl. Stainless steel) & Articles thereof
37
6 M/S Mahesh Engineering Works, Muzaffarpur. Proposal for establishment of 900 MT per yea
capacity Lead Ingot production unit under
proprietorship at Bela Industrial Area, Bela,
Muzaffarpur.
1.3799 19 09-Apr-12 - -
7 M/s Annapurna Industries, Muzaffarpur Proposal for establishment of 4320 MT per
year capacity Bilmass Briquette production
unit in partnership at Industrial Area, Bela,
Muzaffarpur.
1.2608 16 13-Mar-13 - -
8 M/S Steel Authority of India Ltd., Bokaro Steel Plant, Bokaro Establishment of 1.07 Lakh TPA Steel
Processing Unit at Sahdei, Vaishali
318.75 250 08-Oct-07 21-Feb-08
9 M/s Upendra Prasd Singh Hi-Tech Constructions Pvt. Ltd.,
Begusarai
Proposal for establishment of production unit
of 3,000 MT per year capacity Fabricated Steel
Product at Industrial Area, Barauni.
6.5831 281 02-Jan-13 - -
10 M/s Gangotri Iron & Steel Co Ltd., Exhibition Road,
Patna. Fax: 0612-2685959 Phone: 2665456 E-mail:
Proposal for capacity expansion of the Unit
and TMT and M.S. Twisted Bars production
33.8 0 29-Mar-06 22-Oct-06
11 M/s Balmukund Concast Ltd., Patna. Capacity expansion of MS Rod and Steel
Production from 28350 MTA to 52350 MTA in
the Bihta (Mahadeopur,Fulari)Unit.
13.96 175 06-Sep-06 22-Oct-06
12 M/S Patwari Steels Pvt. Ltd. , 6-M, Rajendra Nagar, Patna-16, Proposal for expansion of production capacity
of Steel Ingot, M.S. Bar and Rod and
production of Cast Grinding Media Ball.
5.08 0 15-Jan-07 - -
13 M/S Pinax Steel Industries Pvt. Ltd., VII/ 1&2 Industrial
Estate, Patliputra, Patna-13
Manufacturing of M.S Ingot by setting of
Induction Furnace at Devkuli , Bihta
8.67 69 07-May-07 10-May-08
14 M/s Gangotri Iron & Steel Co Ltd., 307 Ashiana Tower,
Exhibition Road, Patna. E-mail: [email protected]
Establishment of 15 MTx 2 Nos. Induction
Furnace, Concast unit, Oxygen Plant , Wire Rod
Plant & A Rerolling Mill of 300 TPD to
manufacture Thermax TMT Bars Plant at Bihta,
Patna
50 570 08-Oct-07 31-Jan-08
15 M/S Jagdamba Ispat (P) Ltd., Nasriganj, Danapur, Patna. Capacity expansion of 5400 MT/Year MS Ingot
at present established unit at Danapur
1.675 15 29-Oct-07 - -
16 M/S Triveni Smelters Pvt. Ltd., Patna. Proposal for 39,600 MT per year capacity Mild
Steel Ingot unit at Raipura, Fatuha, Patna.
9.6932 36 23-Feb-12 - -
17 M/S Dina Metals Ltd., Patna. Proposal for capacity expansion of the existing
unit of Mild Steel Ingot from 200 MT per day
capacity to 350 MT per day capacity at Abdul
Rahmanpur Road, Deedarganj, Patna City,
Patna.
42.84 200 23-Feb-12 - -
18 M/s Patil Steel Wires Pvt. Ltd. Hyderabad 10,800 MT per year capacity High Tension Steel
Wire production unit at Sabalpur, Patna City,
Patna
8.7913 65 13-Aug-12 - -
19 M/s Patna Iron Pvt. Ltd. Patna. 1224MT per year Capacity M.S. Square and
M/S. Angle, E.R.W Pipe unit at Phase-3,
Industrial Area, Fatuha, Patna.
11.1083 130 18-Sep-12 - -
20 M/s Dadiji Steels Ltd., Patna 28800 MT in the existing 62400 MT per year
capacity of MS Billet/Ingot unit and 30000 MT
per year capacity expansion in the existing
90000 MT per year capacity of TMT Tour at
Sabalpur, Patna City, Patna.
14.6903 6 28-Nov-12 - -
21 M/s Neelkamal Steels Pvt. Ltd. Patna. Proposal for capacity expansion of 30,000 MT
per year M.S. Billet and 30,000 MT per year
T.M.T. Tor in the existing unit of M.S Ingot and
T.M.T. Tor at Sabalpur, Patna
20.03 21 08-Feb-13 - -
22 M/s J.G. Goundry Ltd. Patna City, Patna. Proposal for capacity expansion of 21,600 MT
per year capacity in the existing unit of M.S
Ingot at Chimochak Kothia, Didarganj, Patna
City, Patna.
7.6912 12 13-Mar-13 - -
23 M/s Nampa Electricals Pvt. Ltd., Howrah. Proposal for capacity expansion of 30,000 MT
per year capacity in the existing unit of
Fabricated Structural Products of Iron and
Steel at Patna.
30 120 13-Mar-13 - -
24 M/S Vindhya Steel Pvt. Ltd, Patna Proposal for establishment of 6000 MT per
year capacity Clod Briquetted Iron production
unit at Giddha Growth Centre, Ara.
5 100 11-Aug-10 - -
25 M/s Manokamna Enterprises Pvt. Ltd. Panta 30,000 MT per year capacity M.S. Steel Bar and
Structural Products production unit at Fatuha
Industrial Area, Patna.
7.48 47 18-Sep-12 - -
26 M/s Maa Durgeshwari Metal Products Pvt. ltd., Patna 3000 MTA Capacity MS Wire and 360 MTPA
Capacity of Wire Nails in existing unit of 85
MTPA capacity Wire Nails at Industrial Area,
Fatuha, Patna.
1.0998 26 28-Nov-12 - -
27 M/s Nasco Metals Pvt. Ltd., Patna City, Patna. Proposal for establishment of 600 MT per year
capacity Hinges and Wire Nails production unit
at Didarganj, Patna City, Patna.
1.0762 16 08-Feb-13 - -
7372.5279 7963TOTAL :-
38
1 M/s Protech Packaging Pvt. Ltd. Patna 1200 Lakh pieces per year capacity Aluminum
Bottle Cap production unit at Industrial Area,
Fatuha, Patna.
1.3167 20 18-Sep-12 - -
2 M/S Ganesh Steel Impex Ltd., Muzaffarpur. Proposal for establishment of 21,900 MT per
year capacity of Aluminum Profiles and Lead
Ingot unit at Thuhwa, Kuddhani, Muzaffarpur.
8.9 150 28-Sep-11 - -
3 M/S Shivam Vincom Pvt. Ltd., Muzaffarpur. Proposal for establishment of production unit
of 42,000 MT per year capacity of Lead Ingot
and Lead Plate at Baidhyanathpur,
Muzaffarpur.
12 150 28-Sep-11 - -
4 M/S Bhagwati Metalloys Pvt. Ltd., Patna. Proposal for establishment of 2700 MT per
year capacity Lead Ingot and Plates production
unit at Fatuha, Patna.
2.5205 34 26-Mar-12 - -
5 M/s Shiv Sai Metal Products Pvt. Ltd., Patna. Proposal for establishment of 1.5 MT Per day
capacity Aluminium Wire Products production
unit at Maner, Patna.
1.7826 31 08-Feb-13 - -
6 M/S A Infrastructure Ltd, Rajasthan (Company's proposal for
change of place from Industrial Area, Kumarbagh, Bettiah to
Pandaul Industrial Area, Madhubani has been approved in
SIPB meeting held on 07.
Proposal for establishment of 1,25,000 MT per
year capacity A.C. Sheet and 1,00,000 MT per
year capacity A.C. Pressure Pipe at Pandaul
Industrial Area, Madhubani.
91.65 352 07-Sep-10 10-Apr-12
118.1698 737
1 M/S Bhagwati Cylinders Pvt. Ltd., Samastipur. Proposal for establishment of manufacturing
unit of 3,00,000 piece per year capacity of LPG
Cylinder at Rajajan, Mohiuddin Nagar,
Samastipur.
8.34 108 28-Sep-11 - -
8.34 108
1 M/S Sona Auto Agriculture Pvt. Ltd., Abhishek Plaza, 2nd
Floor, Exhibition Rd. Patna.
Proposal for manufacturing of Agriculture
Implements unit at Fatuha Industrial Area.
12.7 59 29-Sep-08 - -
2 M/S Sai Plastic Industries, Patna. Proposal for establishment of 40 Pieces per
day capacity Plastic Overhead Tank production
unit in Proprietorship at Gaganpura, Patna.
1.4235 47 26-Mar-12 - -
3 M/S Ocean Elevator Pvt. Ltd., Patna. Proposal for establishment of 96 pieces per
year capacity Elevator/Lift production and
Fabrication unit at Industrial area, Fatuha,
Patna.
0.9037 22 11-Jun-12 - -
15.0272 128
1 M/s Anagha Energy and Infrastructure Pvt. Ltd. Patna 1000 Pieces per year capacity of 100 KVA
Transformer production unit at Fatuha/
Hajipur
1.5 33 13-Aug-12 - -
2 M/S Suresh Kumar and Company, Khagaria. Proposal for establishment of 12000 pieces per
year capacity Diesel Engine Pumpset
Assembling unit in proprietorship at Khagaria.
1.0442 15 11-Jun-12 - -
3 M/S Elegance Power and Infrastructure Pvt. Ltd, Patna. Proposal for establishment of 05 MW Biomass
based Power Plant at Pandaul Industrial Area,
Madhubani.
20 10 29-Nov-10 - -
22.5442 58
1 M/S Navran Advanced Nano Products Development
International Pvt. Ltd., 109, M.I.G, Kankarbagh Colony,
Patna.
Proposal for Production Polymerised Toner for
Business Network Laser Printer
32 0 17-Mar-08 - -
32 0
1 M/S Indian Tractors & Components Pvt. Ltd., New Delhi.
(Canceling the earlier name M/S International Tractors Ltd.,
new name as M/S Indian Tractors & Components Pvt.
Ltd. has been approved)
Proposal for production of Tractors and
Commercial Vehicle at Industrial Area, Fatuha
150 0 29-Sep-08 27-Jan-09
2 M/S Jagrity Motors Pvt. Ltd., Patna. Proposal for establishment of 1200 pieces per
year capacity Three Wheeler and Components,
Chassis of Three Wheeler, Gear Box and
Differential Box production unit at Bhusaula,
Phulwarisharif, Patna.
2.6907 27 23-Feb-12 - -
3 M/S Okpet Bicycles Pvt. Ltd., Patna. Proposal for establishment of 2,40,000 pieces
of Bicycles production unit at Simri,
Darbhanga.
4.5203 73 23-Feb-12 - -
4 M/S T I Cycles of India (M/S Tube Investments of India Ltd.),
Chennai, Tamil Nadu.
Proposal for establishment 20 Lac pieces per
year capacity Cycle, Cycle Parts and Accessories
manufacturing unit at E.P.I.P, Hajipur.
45.1 500 25-Feb-11 - -
Aluminium, Tin, Lead & other base metals & articles thereof
Electrical & Electronic machinery & Equipment incl. Parts
TOTAL :-
TOTAL :-
Electronics equipment & parts excl. bio-chemical equipment
TOTAL :-
Misc. manufacture of base metals, n.e.c.
TOTAL :-
Non-Electrical industry specific equipment/machineries incl. Parts thereof
TOTAL :-
Road surface vehicle excl. railways & parts n.e.c.
39
5 M/S Avon Cycles Ltd., Ludhiana, Punjab. Proposal for establishment of production unit
of 03 Lakh piece per year capacity of Bicycle
and Cycle Parts at Patna or Vaishali.
8 500 28-Sep-11 - -
6 M/s Hero Cycles Ltd. Punjab. Proposal for establishment of 09 Lac pieces per
year capacity cycle and Cycle Parts production
unit at Bihar
22 300 02-Jan-13 - -
7 M/S Maa Mundeshwari Cycle Udyog Pvt. Ltd., Aurangabad. .
(Earlier, in the SIPB's 96th meeting held on 26.05.11 consent
was given for establishment of 30,000 nos. of Bicycle
Assembling & Bicycle pa
Proposal for establishment of 1000 pieces per
day capacity Bicycle manufacturing and
assembling unit at Aurangabad.
6.687 77 23-Feb-12 - -
8 M/S Uttam Cycle Pvt. Ltd, Patna Establishment of Cycle Manufacturing Industry
at Gaya-Patna Road
50 75 20-Jul-09 - -
9 M/S Auto Matrix Pvt. Ltd, Patna. Proposal for capacity expansion and
Modernization of existing unit of Service
Centre and Auto Parts at Patliputra Industrial
Estate.
2.76 22 08-Mar-10 - -
291.758 1574
1 M/S Shrenuj & Co. Ltd.,Mumbai. Proposal for establishment of 2,88,000 Crates
per year capacity Diamond Manufacturing-
Cutting and Polishing unit at Industrial Area,
Patliputra, Patna.
47.81 1395 11-Jun-12 - -
47.81 1395
1 M/S Elegance Power and Infrastructure Pvt. Ltd, Patna. Proposal for production of 60 Lac CFL Bulb and
LED Lights at Giddha Industrial Area, Ara.
8 48 29-Nov-10 17-Sep-11
2 M/S M.B. Tiles & Constructions Pvt. Ltd, Bhubneshwar. Proposal for establishment of 22,50,000
number Pavers, Designers and Wall Tiles
production unit at Industrial Growth Centre,
Purnea.
1.2516 31 12-Jan-11 - -
3 M/s Om Sai Brick Industries, Purnea. 108 Lakh pieces per year capacity Fly Ash
Bricks Production unit in partnership at
Industrial Area, Maranga, Purnea
1.089 24 18-Sep-12 - -
4 M/s N.N. Sang Biotech Pvt. Ltd. Patna. Proposal for establishment of 86.40 Lac pieces
per year capacity Fly Ash Bricks production unit
at Sadatpur Kanti, Muzaffarpur.
1.85 15 13-Mar-13 - -
5 M/s Kavish Infrastructure Pvt. Ltd. Kolkata. 240 Lakh pieces per year capacity Fly Ash
Bricks production unit at Barauni, Begusarai
4.8 10 13-Aug-12 - -
6 M/S Hemkund Industries, Patna. Proposal for establishment of production unit
of 63.24 Lakh pieces per year capacity of Fly
Ash Bricks, Pavers Block and Tiles in
proprietorship at Industrial Area, Fatuha,
Patna.
1.6927 23 28-Sep-11 - -
7 M/s Shree Singhal Flyash Products, Patna 36.24 Lac Pieces per year capacity Flyash
Bricks, Pavers Blocks and Tiles Production unit
in proprietorship at Industrial Area, Fatuha,
Patna.
3.6937 34 28-Nov-12 - -
8 M/s ECO Pavers and Bricks Pvt. Ltd., Patna. Proposal for establishment of 72 Lac pieces per
year capacity of Fly Ash Bricks unit at Badipur,
Naubatpur, Patna.
1.0411 22 02-Jan-13 - -
9 M/s Goenka Bricks Pvt. Ltd., Patna. Proposal for establishment of 57.60 Lac pieces
per year capacity Fly Ash Bricks production unit
at Mahajpura, Bikaram, Patna.
2.57 45 13-Mar-13 - -
10 M/S Hyderabad Industries Ltd, Hyderabad. Proposal for establishment of 2,50,000 MT per
year capacity Asbestos Cement Sheeting Plant
in two Phases at Kumarbagh Industrial Area,
West Champaran.
80 600 19-Apr-10 - -
11 M/s Century Ply Wood Ltd., Kolkata. Cement Manufacturing
Company Ltd., Sajjan Bhajanka, Chairman, 281 Deepali
Pitampura, New Delhi-110034
Proposal for establishment of one Million
Ton/Year Cement Grinding Plant at Kahalgaon
119 300 17-Apr-06 08-Sep-06
12 M/S J. K. Lakshmi Cement Ltd., New Delhi. Proposal for establishment of 10 lakh MT per
year capacity Cement Plant at Industrial Area,
Kishanganj.
260 175 11-Jun-12 - -
13 M/S Jaiprakash Associates Ltd., New Delhi. Proposal for establishment of capacity of 1
Million Ton Flyash based Cement Grinding
Plant at Motipur, Muzaffarpur
0 0 18-Nov-08 - -
14 M/S Balmukund Cement & Roofings Ltd, Kolkata Proposal for establishment of 1.5 Lakh MT
capacity production unit of Asbestos Fiber
Cement Sheet (Corrugated/Flat) and
Accessories at Kanti, Muzaffarpur.
31 45 21-Dec-09 - -
TOTAL :-
Precious & semi-precious stone/jewellery; works of art and other decorative items, n.e.c.
TOTAL :-
Glass and Fiber glass, Ceramic, Porcelain, Asbestos and cement and articles thereof incl. Articles of stone
40
15 M/S UAL Industries Ltd, Kolkata. (Company's proposal
approved by SIPB on 01.02.10 for establishment of 1,20,000
MT per year capacity Asbestos Cement and corrugated
Sheets Plant at Bakhtiyarpur has bee
Establishment of 2,33,000 MT per year capacity
Asbestos Cement Sheet and Corrugated Sheets
Plant in two phases at Goraul, Vaishali in the
name of UAL-Bihar
54.67 210 21-Jul-10 - -
16 M/S B. K. Group of Companies, Park Street. Kolkata. Establishment of 1.5 Million TPA Cement
manufacturing Plant near Barauni Thermal
Power Station.
137.6 150 16-Jul-07 - -
17 M/S Amrit Cement Pvt. Ltd, Kolkata. Establishment of Cement Grinding unit of 6.60
Lakh MT per year capacity at Kahalgaon,
Bhagalpur.
111.28 140 08-Mar-10 - -
18 M/S Green Valliey Industries Ltd, Shillong Proposal for establishment of 1 Million Ton per
year capacity Cement Grinding unit at
Industrial Growth Centre, Kahalgaon,
Bhagalpur.
120 200 24-May-10 - -
19 M/S Balmukund Cement & Roofings Ltd., Patna. Proposal for establishment of 3,00,000 MT per
year capacity Asbestos Fibres Cement
Corrugated Flat Sheets and Accessories Plant in
two phases at Industrial Develpoment Area,
Kahalgaon, Bhagalpur.
81 147 23-Feb-12 - -
20 M/s Green Concretex Cements Pvt. Ltd. Kolkata 01 million MT per year capacity cement plant
unit at Kahalgaon
137.6 153 18-Sep-12 - -
21 M/s Emami Cement Ltd., Kolkata 1.5 MT Per year capacity Cement Grinding unit
and 10 MW Captive Power Plant unit at
Shivnarayanpur, Kahalgaon, Bhagalpur
418 166 18-Sep-12 - -
22 M/s Trikut Cement Works, Bhagalpur. Proposal for establishment of 34,500 MT per
year capacity Portland Cement, Fly Ash Bricks
and Pavers Blocks and Tiles Production unit in
partnership at Anadipur, Kahaigaon,
Bhagalpur.
5.0662 79 13-Mar-13 - -
23 M/S Ambuja Cements Ltd. at P.O- Ambuja Nagar, Taluka-
Kodinar, Dist.- Junagadh, Gujarat-362715
Establishment of Cement Grinding Plant of 1.5
Million Ton Capacity and 15 MW Co-
generation Plant at Barh
380 150 22-May-07 11-Sep-07
24 M/S Birla Corporation Ltd., Birla Building,9/1,RN Mukharji
Road, Kolkata,-700001
Setting up of 1 Million TPA Cement grinding
Unit at Barh, Patna.
155 350 25-Jun-07 17-Jun-08
25 M/S ABG Cement Ltd., Mumbai. Proposal for establishment of 1.5 MTPA
(Million Ton per year) Cement Grinding Plant
and 12 MW Coal Based Captive Power Plant at
Pandarak, Barh.
548.646 230 28-Sep-11 - -
26 M/S Ultra Tech Cement Ltd., Mumbai. Proposal for establishment of 02 Million Ton
per year capacity of Cement Grinding unit at
Fatuha, Patna.
326.1 246 28-Sep-11 - -
27 M/S Shree Balajee Industries, Patna. Proposal for establishment of 15,000 MT per
year capacity Cement Plant unit in
proprietorship at Industrial Area, Fatuha,
Patna.
2.3845 35 11-Jun-12 - -
28 M/s Shree Balajee Cement Industries Pvt. Ltd. Patna 15,000 MT per year Capacity Cement Plant unit
at Industrial Area, Fatuha, Patna
2.3845 35 18-Sep-12 - -
29 M/s Berger Coours (India) Pvt. Ltd., Patna 300 MT per year, Cement Paint 240 MT per
year and Wall Putty-150 MT per year capacity
production unit at industiral Area, Fatuha,
Patna
1.0262 16 18-Sep-12 - -
30 M/S Ramco Industries Ltd, Chennai (Canceling the earlier
approval given by SIPB in its meeting held on 16.12.08 on the
proposal for establishment of Asbestos Cement Sheet Plant,
Water Storage Plant an
Proposal for establishment of 1,20,000
MT/Annum Capacity of Asbestos Cement Sheet
Plant and 2 Lakh MT/Annum Capacity of
Cement Grinding Plant at Industrial Area,
Bihiya, Bhojpur.
60.2 200 16-Dec-08 - -
31 M/S Nibhi Industries Pvt. Ltd, Mylapore, Chennai Establishment of 1,00,000 (One Lakh) MT
Capacity Asbestos Fiber Cement Corrugated
Sheet, Flat Sheet and Accessories and Light
Weight Fly Ash Block Plant at Industrial Growth
Centre, Giddha, Ara (Chang
31 125 19-Oct-09 - -
32 M/S Bluestar Cement Ltd, Varanasi. Proposal for production of 3,00,000 MT per
year capacity Portland Pozzolana Cement unit
at Karamnasha, Kaimur, Bhabhua.
27.75 42 27-Aug-10 - -
33 M/S Eco Cements Ltd., Varanasi. Establishment of grinding unit of Portland
Cement, Portland Pozzolana Cement and
Portland Slag Cement with the capacity of
3000 TPD and 5 MVA Captive Power Plant at
Karamnasa, Bhabhua.
100 150 19-Oct-09 - -
34 M/S Shree Cement Ltd., New Delhi. (Cancelling the earlier
proposal approved on 27.07.11 for establishment of 10 Lakh
MT per year capacity Cement Plant and Captive Power
Generation at Aurangabad, appro
Proposal for establishment of 10 Lakh MT
capacity Cement Plant and 12 MW Biomass
based Captive Power Plant unit at Aurangabad.
294.2 372 27-Jul-11 - -
41
35 M/S J. K. Lakshmi Cement Ltd., New Delhi. Proposal for establishment of 05 lakh MT per
year capacity Cement Plant at Industrial Area,
Aurangabad.
120.4 130 11-Jun-12 - -
36 M/S Kanodia Infratech Ltd., Varanasi. Proposal for establishment of 06 lakh MT per
year capacity Cement Plant unit at Growth
Centre , Industrial Area, Aurangabad.
78.55 74 11-Jun-12 - -
3708.8455 4772
1 M/S Terai Ispat Ltd, Siliguri. Proposal for establishment of two Induction
Furnace of 15 MT,(Steel Melting Shop 1,05,000
MT per year) 99684 MT per year capacity Re-
rolling Mill and 12 MW Captive Power Plant at
Banka
149.88 697 19-Jan-10 - -
2 M/S Sai Iron India Ltd., Didarganj, Patna Establishment of second Rolling Mill in the
Campus of existing Rolling Mill at Sabalpur,
Didarganj, Patna.
42.39 367 24-Sep-07 15-Feb-08
3 M/S Balajee Mini Steels & Rerolling Pvt. Ltd, Patna Establishment of 63000 MTA capacity Re-
rolling Mill at Bihta-Maner Road, Patna
17.66 78 30-Nov-09 01-Feb-10
4 M/S Gokul Steels Pvt. Ltd, Patna. Establishment of Steel Re-rolling Mill for
production of 28,800 MT per year capacity
Steel Bar and Rod at Khusrupur, Patna.
9.2 46 08-Mar-10 - -
5 M/S City Rolling Mills Pvt. Ltd, Patna. (Company's proposal
approved by SIPB on 24.05.10 for establishment of 3000 MT
per year capacity Rolling Mill at Bihta, Patna has been
amended and consent has be
Proposal for establishment of 30,000 MT per
year capacity Rolling Mill at Bihta, Patna.
7.72 44 29-Jun-10 - -
6 M/S Jaikrishna Steel Pvt. Ltd, Rajendra Nagar, Patna. Proposal for establishment of 22,500 MT per
year capacity Rolling Mill at Industrial Area,
Fatuha, Patna.
5 60 12-Jan-11 - -
7 M/S Shree Ganpati Enterprises, Patna Proposal for establishment of Offset Printing,
Binding and Stitching unit in proprietorship at
Industrial Area, Fatuha, Patna.
2.3541 36 26-May-11 - -
8 M/S Pinax Steel Industries Pvt. Ltd., Patna. Proposal for expansion/diversification of
18,000 MT per year capacity Electroforged
Grating in the existing Rerolling Mill unit of
15,000 MT per year capacity at Devkuli, Bihta.
7.72 36 23-Feb-12 - -
9 M/S Piyush and Associates Pvt. Ltd., Patna. Proposal for establishment of 22,500 MT per
year capacity Rerolling Mill unit at Mahuli
Road, Patna City, Patna.
5 24 23-Feb-12 - -
246.9241 1388
1 M/S Adhish Enterprises Pvt. Ltd, Bettiah(West Champaran). Proposal for establishment of 20 rooms Hotel
and Motel at Ujjain Tola, Bettiah, West
Champaran.
1.7752 7 25-Feb-11 18-Jul-11
2 M/S JAK Hotel & Arcade LLP, Bettiah. Proposal for establishment of Hotel and
Restaurant Services unit at Nauranga Garden,
Bettiah.
16.8952 37 11-Jun-12 - -
3 M/s Thirteen Bulls infra Pvt. Ltd. Purnea Establishment of Hotal and Restaurant and
Resort unit at Industrial Growth Centre,
Purnea
9 89 18-Sep-12 - -
4 M/s Classic Hotel, Purnea. Proposal for establishment of two Star Hotel in
partnership at Industrial Growth Centre,
Purnea.
4.95 60 13-Mar-13 - -
5 M/S Jai Prakash Hotels and Resorts Pvt. Ltd., Gaya. Proposal for establishment of 49 Rooms Hotel
at Rajgir.
7.522 30 23-Feb-12 - -
6 M/S Signet Hotels Consortium, 15 B, Zaver Mahal, 66,
Marine Drive, Mumbai-400020 E-mail: [email protected];
Establishment of world class standard hotels at
Patna, Rajgir and Bodh-Gaya.
90 450 20-Dec-06 - -
7 M/S Maurya-Patna, Bihar Hotels Ltd, South Gandhi Maidan,
Patna
Proposal for establishment of New Maurya
Hotel Tower and expansion of existing Hotel
35.74 180 17-Mar-08 - -
8 M/S Amit metaliks Ltd, Durgapur, West Bengal. Establishment of Five Star Hotel at Patna Town 168.18 309 20-Jul-09 - -
9 M/S Kumar Infratrade Enterprises Pvt. Ltd, Patna. (Approval
has been given for 135 rooms Five Star Hotel in place of 84
rooms in SIPB meeting held on 25.02.11)
Proposal for establishment of 135 rooms Five
Star Hotel at Exhibition Road, Patna.
48.34 50 25-Feb-11 17-Sep-11
10 M/S Recon, Patna. Proposal for establishment of I.T. Park and Five-
Star Hotel-cum-Shopping Complex in
proprietorship at Industrial Area, Patliputra,
Patna.
190.03 161 28-Sep-11 - -
11 M/S Standard Properties Pvt. Ltd., Patna. Proposal for establishment of Hotel and
Business Centre at Kidwaipuri, Patna.
32.5 35 28-Sep-11 - -
12 M/S Krrish Engicon Pvt. Ltd., Patna. Proposal for establishment of Multiplex-cum-
Shopping Mall and Hotel at Sudarshan Path,
Patna City, Patna.
37.48 72 28-Sep-11 - -
TOTAL :-
Misc. non classified manufactured articles & parts
TOTAL :-
Service related items
42
13 M/S Gandiv Builder and Engineers Pvt. Ltd., Patna. Proposal for establishment of Hotel in the
name of Hotel Gargee Grand in two stages at
Exhibition Road, Patna.
14.1 49 28-Sep-11 10-Apr-12
14 M/S Meridian Budha Hotels Pvt. Ltd., Patna. Proposal for establishment of Five Star Hotel of
90 Rooms at Budh Marg, Patna.
8.81 160 28-Sep-11 - -
15 M/S Hotel Windsor, Patna (Unit of M/S Patliputra Fashion
Pvt. Ltd.)
Proposal for capacity expansion from 51
Rooms to 79 Rooms in the existing Hotel at
Umang Palace, Exhibition Road, Patna.
3.55 71 28-Sep-11 - -
16 M/S Muskan Event Management and Caterers Pvt. Ltd.,
Patna.
Proposal for establishment of Resort-cum-
Restaurant in the name of Ghar Aangan at
Industrial Estate Road, Patliputra Colony,
Patna.
1.25 53 28-Sep-11 - -
17 M/S MV Hotels & Projects Pvt. Ltd., Patna. Proposal for establishment of Five Star Hotel of
124 Rooms at Patliputra, Patna.
83.09 70 28-Sep-11 - -
18 M/S Parasnath Engicon Pvt. Ltd., Patna. Proposal for establishment of 120 Rooms Hotel
at Digha Road, Kurji, Patna.
41.04 119 23-Feb-12 - -
19 M/S Ashiana Heritage Hotels Pvt. Ltd., Patna. Proposal for establishment of Hotel at Fraser
Road, Patna.
3.18 45 26-Mar-12 - -
20 M/S Jaimatadi Incorporation Pvt. Ltd., Patna. Proposal for establishment of 72 Room Hotel
in the name of J.M.D International at Industrial
Area, Patliputra, Patna.
20.2158 119 11-Jun-12 - -
21 M/s Unique Properties Pvt. Ltd., Guwahati Establishment of Five Star Hotal at Patna 92 0 18-Sep-12 - -
22 M/s Bihar Trade Tower (Joint Venture of M.V. Hotels and
Projects Pvt. Ltd. And Ashwarya Foundation), Patna.
Proposal for establishment of I.T. Park in the
name of M/S Bihar Trade Tower in a joint
venture by M/S M.V. Hotels and Projects Pvt.
Ltd. And M/S Ashwarya Foundation at
Patliputra Industrial Area patna.
98.78 15 08-Feb-13 - -
23 M/s Sunny Star Hotels Pvt. Ltd., Patna Proposal for establishment of 4 Star Hotel and
restaurant at South Gandhi Maidan, Patna.
31.6768 33 08-Feb-13 - -
24 M/s Patliputra Infotech Park Pvt. Ltd., Patna. Proposal for establishment of I.T. Services. I.T.
Enabled Services and I.T. Industries at
Patliputra Colony, Patna.
9.79 1000 08-Feb-13 - -
25 M/s Uno Digital Pvt. Ltd., Patna. Proposal for capacity expansion of Software,
I.T. partk at Industrial Area, Patna
20.237 582 08-Feb-13 - -
26 M/S Bihar Hotels Ltd, Patna. (Company's earlier proposal
approved by SIPB on 01.02.10 for establishment of Budget
Hotel at Dehri-on-Sone has been amended and consent has
been given with condition for
Establishment of 2-Star Hotel at Dehri-on-
Sone.
4.79 49 19-Apr-10 - -
27 M/S Hotel Rohit International, Rohtas. Proposal for establishment of Hotel in
partnership at G.T. Road, Sasaram.
1.5744 61 23-Feb-12 - -
28 M/S Hotel U.S. Residency, Aurangabad. Proposal for establishment of 29 Rooms Hotel
Project in proprietorship at Aurangabad.
4.63 40 23-Feb-12 - -
29 M/s Hotel Pushkar, Aurangabad Three-Star Hotel in proprietorship at Indusrial
Growth Centre, Jasoiya, Aurangabad
1.305 16 18-Sep-12 - -
30 M/S Shristi Infrastructure Development Corporation Ltd.
Kolkata
Establishment of Five Star Hotel in Patna and
International Tourist Resort at Bodh Gaya in
PPP mode and Golf Course
0 0 18-May-09 - -
31 M/S Yatri Bihar Hospitality Pvt. Ltd., Patna. Proposal for establishment of Three Star Hotel -
cum- Resort of 80 Rooms at Bodh Gaya.
34.3 135 28-Sep-11 - -
32 M/S La'-Elixier Ashiyan Estate Developers Pvt. Ltd.,
Bhagalpur.
Proposal for establishment of 3-4 Star Hotel,
Marketing Complex and Amusement Park at
Barari Industrial Area, Bhagalpur.
18.82 400 28-Sep-11 - -
33 M/S Hotel Galaxy Intercontinental Pvt. Ltd., Bodh Gaya,
Gaya.
Proposal for establishment of Hotel and
Restaurant at Mastipur, Bodh Gaya, Gaya
4.9392 43 23-Feb-12 - -
34 M/S Gayan Buddha Regency Pvt. Ltd., Patna. Proposal for establishment of 50 Rooms Hotel
at Bodh Gaya, Gaya.
6.3976 30 23-Feb-12 - -
35 M/S J K M Infra Projects Ltd., New Delhi. Proposal for establishment of 4 Star Hotel at
Bodh Gaya, Gaya.
29.3 150 11-Jun-12 - -
36 M/s Bodhi Hotal and Resorts Pvt. Ltd., Haryana. Proposal for establishment of Three Star Hotal
at Bodhgaya, Gaya
32.5 16 08-Feb-13 - -
37 M/s Prakash Roller Flour Mills Pvt. Ltd., Gaya Proposal for establishment of Three Star Hotel
at Bodhgaya, Gaya.
40.8 350 08-Feb-13 - -
38 M/s Food Steps of Buddha Hotels Pvt. Ltd., Mumbai Proposal for establishment of International
Convention Centre and Star Category Hotel at
Bodhgaya, Gaya.
112.1 150 08-Feb-13 - -
39 M/S Gajanana Agronomy Pvt. Ltd, Bettiah. Establishment of Multipurpose Cold Storage
with the capacity of 6860 MTA at Chhawani,
Mehdia Bari, West Champaran.
4.49 13 19-Oct-09 01-Feb-10
43
40 M/S Meera Comtrade Pvt Ltd, Exhibition Road, Patna
(Change of name of the company from M/S Meera
Enterprises to M/S Meera Comtrade Pvt Ltd has been
approved in SIPB meeting on 18.05.09)
Proposal for establishment of Cold Storage
with proposed capacity of 40 MT, Agri
Marketing Yard and Dry Warehouse with
proposed capacity of 400 MT under Rural Agri
Business Centre at Narkatiabazar, Ea
3.861 100 18-May-09 11-Jul-09
41 M/S Bhartiya Agro Products Pvt Ltd, Bettiah Proposal for establishment of Cold Storage
with proposed capacity of 6150 MT, Dry
Warehouse with proposed capacity of 5000
MT, Agri Input Marketing and Agri Output
Marketing Project at Bettiah
9.319 280 16-Dec-08 - -
42 M/S Maurya Foods Pvt. Ltd, East Champaran Establishment of 8134 MT Capacity Cold
Storage under Rural Agri Business Centre at
Mehsi, East Champaran.
5.93 37 23-Nov-09 - -
43 M/S Thakur Modern Cold Storage Pvt. Ltd., East Champaran. Proposal for establishment of 6000 MT per
year capacity Cold Storage unit under R.A.B.C
at Mathiyavrit, Chhouradano, East Champaran.
5.8021 40 28-Sep-11 - -
44 M/S Keshiha Services Enterprises pvt. Ltd., Bettiah. Proposal for establishment of 20000 MT
Modern Dry Warehouse under R.A.B.C. at
Fursatpur, Motihari.
12.6302 165 23-Feb-12 - -
45 M/S Madhuraj Enterpries Pvt. Ltd., Patna. Proposal for establishment of 6000 MT Multi
Purpose Cold Storage unit under R.A.B.C. at
Mathbanwari, Chakia, East Champaran.
10.9812 50 23-Feb-12 - -
46 M/s Malahi Cold Storage Pvt. Ltd. East Champaran Proposal for 6000 MT Capacity expansion and
modernization of existing 4000 MT capacity
cold storage under R.A.B.C. at Malahahi,
Areraj, East Champaran
11.6912 15 08-Feb-13 - -
47 M/S Sharda Bhawani Cold Storage and Ware Housing Pvt.
Ltd., Supaul.
Proposal for establishment of 6000 MT
Multipurpose Cold Storage unit under R.A.B.C.
at Sukhanagar, Pratapganj, Supaul.
5.7557 10 16-Apr-12 - -
48 M/S Gupta and Sons Traders Pvt. Ltd., Araria Proposal for establishment of 5,300 MT
capacity Multi Purpose Cold Storage at
Industrial Area, Forbesganj, Araria.
3.483 49 23-Feb-12 - -
49 M/s SNSR Infra Ventures Pvt. Ltd., Araria. Proposal for establishment of 5000 MT
Capacity Grain Storage Unit under R.A.B.C.
Rajganj, Narpatganj, Araria.
7.9312 15 13-Mar-13 - -
50 M/S Babu Cold Storage, Pilkhan Road, Chura Patti,
Kishanganj
Establishment of 5200 MT/Year capacity Cold
Storage for Vegetable and Food Preservation
at Chura Patti, Kishanganj
1.81 7 29-Oct-07 - -
51 M/s A.B.Z. Agro Foods Pvt. Ltd., New Delhi Proposal for establishment of 27,000 MT per
year capacity Blast Freezer Storage and
Processing unit at Lodhabari and Rajpur,
Surajpur, Pothia, Kishanganj.
12.3 175 08-Feb-13 - -
52 M/S Taj Trading Company, Chhatia, Bhatgama, Purnea East,
Purnea
Establishment of Warehousing and Packaging
Facility for Makhana at Purnea.
0.936 55 09-Feb-09 - -
53 M/S Tarouna Cold Storage Pvt Ltd, Purnea Establishment of Cold Storage with the
capacity of 11,400 MT under R.A.B.C. at
Jalalgarh, Purnea.
7.29 60 17-Aug-09 13-Dec-09
54 M/S Shree Kalu Cold Storage Pvt. Ltd, Purnea. Establishment of 11000 MT Capacity Cold
Storage under Rural Agri Business Centre at
Moranga Growth Centre, Purnea.
6.043 51 23-Nov-09 23-Apr-10
55 M/S Pransukhka Cold Storage Pvt. Ltd, Purnea. Proposal for establishment of 6000 MT
Modern Multi Products Cold Storage unit
under R.A.B.C. at Gulab Bagh, Purnea.
6.73 138 27-Aug-10 - -
56 M/S Sri Sri Cold Storage, Purnea. Proposal for capacity expansion from 7000 MT
to 14,000 MT in the existing Multipurpose Cold
Storage unit in proprietorship at Industrial
Growth Centre, Maranga, Purnea.
9.95 60 28-Sep-11 - -
57 M/S Panna Agrotech Coldstorage Pvt. Ltd., Purnea. Proposal for establishment of 5000 MT
capacity Multi Purpose Cold Storage under
R.A.B.C. at Gangoli, K. Nagar, Purnea.
2.1848 20 23-Feb-12 - -
58 M/S Hestia & Hermes Realestate Pvt. Ltd., Kolkata. Proposal for establishment of 10,000 MT Dry
Warehouse under R.A.B.C. at Dalan, Katihar.
7.183 30 23-Feb-12 - -
59 M/s Frostberg Agritech Pvt. Ltd. Saharsa. 5000 MT Cold Storage under R.A.B.c. at
patuaha, Kahra, Saharsa.
3.2574 15 18-Sep-12 - -
60 M/S Nand R.A.B.C. Cold Storage, Darbhanga. Proposal for establishment of 500 MT
Multipurpose cold storage unit in
proprietorship under R.A.B.C. at Katsaha,
Bharwara, Singhwara, Darbhanga.
3.145 130 16-Apr-12 - -
61 M/S Darbhanga Agro Pvt. Ltd., Darbhanga. Proposal for establishment of 5500 MT
capacity Cold Storage unit under RABC at
Chanpatti, Saramohanpur, Darbhanga.
4.7443 20 11-Jun-12 - -
62 M/s Savitri Horticulture Pvt. Ltd. Samastipur. 8500 MT Cold Storage unit under R.A.B.C. at
Donar Industrial Area, Darbhanga.
8.36 10 13-Aug-12 - -
44
63 M/S Unique Foods, Muzaffarpur Establishment of I. Q. F. Plant-2 MT per hour
Frozen / Aseptic line 10 MT per hour, Canning
Line 15 MT per day, Cold Room 500 MT and
Modern Cold Chain at Muzaffarpur.
16.64 35 17-Aug-09 13-Dec-09
64 M/S Protech Cold Storage Pvt. Ltd, Muzaffarpur. Establishment of 10,000 MT per year capacity
Cold Storage at Paroo, Muzaffarpur.
4.82 26 16-Nov-09 11-Feb-10
65 M/S Phular Cold Storage Pvt. Ltd, Vaishali. Proposal for establishment of 11,000 MT
Multipurpose Cold Storage, Multiproduct
Grading Line and Agri Mall Warehouse under
R.A.B.C. at Mansoorpur, Kanti, Muzaffarpur.
8.545 40 27-Jul-11 30-Sep-11
66 M/S Mani Cold Storage Pvt. Ltd., Samastipur. Proposal for establishment of 15000 MT
capacity Multi Purpose Cold Storage under
R.A.B.C. at Nigopur, Saraisa, Sakra,
Muzaffarpur.
16.5012 50 23-Feb-12 - -
67 M/s Dev Shiva Agro Pvt. Ltd. Muzaffarpur. Proposal for establishment of 10,000 MT
capacity Cold Storage under R.A.B.C. at
Chandrahatti, Kurhani, Muzaffarpur.
15.8412 20 13-Mar-13 - -
68 M/S Royal Engineering and Cold Storage Pvt. Ltd., Siwan. Establishment of Cold Storage with the
Capacity of 5000 MT at Pakwaliya, Dhrundha,
Siwan.
1.5 15 18-May-09 16-Sep-09
69 M/S Laheji Freezing House, Siwan. Proposal for establishment of 6000 MT
capacity Multi Purpose Cold Storage unit under
R.A.B.C. at Laheji, Siwan.
9.6412 85 23-Feb-12 - -
70 M/S Ramadhar Singh Cold Storage Pvt. Ltd., Bharhopur,
Ganjpar, Ekma, Saran-841208
Establishment of Multi Purpose and Multi
Chambered Cold Storage at Ganjpar, Ekma,
Saran.
3.58 26 14-Aug-08 15-Nov-08
71 M/S Sri Moti Pvt. Ltd., Chapra Proposal for establishment of 6500 MT
capacity Cold Storage, 2 MT per hour Potato
Grading Line, Weighing Line-1, 500 MT Agri
Input Godown and 600 MT capacity
Warehouse unit under R.A.B.C at Khalpura,
5.61 20 23-Mar-10 - -
72 M/S Shashibhushan Cold Storage pvt. Ltd., Chhapra. Proposal for establishment of 9000 MT Cold
Storage unit under R.A.B.C. at Bhakura Bhitti,
Sahabuddin, Chhapra.
10.1412 50 23-Feb-12 - -
73 M/s Sundram Cold Storage Pvt. Ltd., Saran. 4200 MT Capacity Cold Storage unit under
R.A.B.C at Bhatoura, Gawandri, Marhaura,
Saran.
5.3438 15 28-Nov-12 - -
74 M/s Om Suryay Namah, Chapra. 6000 MT Multi Purpose Cold Storage unit
under R.A.B.C in partnership at
Mohammadpur, Garkha, Chapra.
9.9312 25 28-Nov-12 - -
75 M/S Tiger Warehousing Cold Chain Pvt. Ltd., 508, Dalamal
House, Nariman Point, J.B. Road, Mumbai, Maharastra
(Company's name has been changed form M/S Central
Warehousing Cold Chain Pvt. Ltd to M/S Ti
Establishment of Warehousing, Container
Freight and Cold Storage at Hajipur
49.75 105 17-Mar-08 04-Jun-09
76 M/S Lichchhwi Foods India Pvt Ltd, Hajipur (Vaishali). Establishment of 7000 MT per year Capacity
Multi Commodity Cold Storage, 2000 MT per
year Capacity Deep Freezer and 2 MT per hour
I.Q.F Line Freezer at Dighi Kala, Industrial
Estate Hajipur
8.72 7 09-Nov-09 11-Feb-10
77 M/S Milsha Agro Exports Pvt. Ltd, Kolkata. Establishment of 500 MT capacity Multi
Purpose Cold Storage, 10 MT Pre-cooling
Room, 5 MT Pulp Processing Unit in Phase-1
and 1 MT Individual Quick Freezer in Phase-2
at Hajipur Industrial Estate.
5.6 41 15-Feb-10 - -
78 M/S Shimla Horticulture Pvt. Ltd, Kolkata. Proposal for establishment of 1000 MT per
year capacity Multipurpose Cold Storage at
EPIP, Hajipur.
15.66 400 24-May-10 - -
79 M/S Minakshi Rural Agri Business Pvt. Ltd, Patna. Proposal for establishment of 10,000 MT
Modern Multi Purpose Cold Storage at
Chandpur, Baligaon, Patepur, Vaishali.
9.56 40 27-Aug-10 20-Feb-11
80 M/S Reshma Cold Storage Pvt. Ltd., Vaishali. Proposal for establishment of 9000 MT Multi
Purpose Cold Storage unit under R.A.B.C. at
Fulwaria, Mahua, Vaishali.
10.6225 50 23-Feb-12 - -
81 M/S Baba Baidhnath Agro Cold Storage Pvt. Ltd., Vaishali. Proposal for establishment of 10,000 MT
capacity Multi Purpose Cold Storage under
R.A.B.C. at Vaishali.
9.9312 50 23-Feb-12 - -
82 M/S Shushila Shankar Cold Storage Pvt. Ltd., Samastipur. Proposal for establishment of 8000 MT Cold
Storage unit under R.A.B.C. at Hasan Sarai,
Belgaon, Patepur, Vaishali.
9.8683 15 26-Mar-12 - -
83 M/S Jamuna Nursing Home Pvt. Ltd., Vaishali. Proposal for capacity Expansion and
Modernization from 5200 MT to 7900 MT in
the existing unit of Cold Storage under R.A.B.C
at Jandaha, Vaishali.
7.375 17 26-Mar-12 - -
45
84 M/s Ram Vilash Cold Storage Pvt. Ltd. Samastipur
C
Capacity expansion from 3000 MT capacity to
7000 MT capacity under R.A.B.C. in the existing
cold Storage unit at Kushar, Nijhma, Mahua,
Vaishali
2.8487 105 13-Aug-12 - -
85 M/s Sri Ram Praikshan Cold Storage Pvt. Ltd , jandaha,
Vaishali.
8000 MT Multi Purpose Cold Storage unit
under R.A.B.C at Jandaha, Vaishali
10.8305 50 28-Nov-12 - -
86 M/S Thakur Nikunj Cold Storage Pvt. Ltd., Samastipur. Establishment of Multipurpose Cold Storage
with the capacity of 6000 MT at Mathurapur,
Samastipur.
3.59 130 19-Oct-09 11-Feb-10
87 M/S Simri Cold Storage Pvt Ltd, Simri, Samastipur. Establishment of 6000 MT Capacity Cold
Storage, 3 MT per hour Sorting /Grading Unit
under R.A.B.C Scheme at Simri, Samastipur.
4.5055 8 09-Nov-09 01-Feb-10
88 M/S Mohan Cold Storage Pvt Ltd, Samastipur Establishment of 10,600 MT Capacity Cold
Storage under R.A.B.C. Scheme at Tajpur,
Samastipur.
7.44 0 09-Nov-09 11-Feb-10
89 M/S Ram Pukar Cold Storage Pvt. Ltd, Samastipur Establishment of 6500 MT capacity Cold
Storage at Mohiuddin Nagar, Samastipur
5.2288 23 23-Nov-09 11-Feb-10
90 M/S Bhagwan Veer Hanuman Cold Storage Pvt. Ltd,
Samastipur
Proposal for establishment of 5000 MT
capacity Cold Storage, 2 MT per hour capacity
Rice Mill and Warehouse under RABC at
Industrial Area, Harpur Alloth, Samastipur.
4.17 4 21-Dec-09 11-Jul-11
91 M/S Maa Bhagwati Kalyanpur Cold Storage Pvt. Ltd,
Samastipur.
Proposal for establishment of 6000 MT
Multipurpose Cold Storage under R.A.B.C at
Kalyanpur, Bibhutipur, Samastipur.
8.545 100 27-Jul-11 30-Sep-11
92 M/S B K Industries Ltd, Patna. Proposal for establishment of 12000 MT Cold
Storage and 6000 MT Warehouse under
R.A.B.C. at Ilmas Nagar, Samastipur.
14.93 50 27-Jul-11 18-Dec-11
93 M/S Om Sai Cold Storage Pvt. Ltd., Samastipur. Proposal for establishment of 6000 MT per
year capacity Multipurpose Cold Storage under
R.A.B.C. at Lohagir, Ujiarpur, Samastipur.
7.15 70 28-Sep-11 - -
94 M/S Kisan Seva Cold Storage Pvt. Ltd., Samastipur. Proposal for establishment of 10000 MT Multi
Purpose Cold Storage Unit under R.A.B.C. at
Lakhnipur, Maheshpatti, Samastipur.
8.3 50 23-Feb-12 - -
95 M/S Aparna Cold Storage Pvt. Ltd., Samastipur. Proposal for capacity expansion of the existing
Cold Storage from 3250 MT to 6500 MT under
R.A.B.C. at Patori, Samastipur.
3.2336 30 23-Feb-12 - -
96 M/s Ashok Raj Prewerve Pvt. Ltd. Samastipur 10000 MT Multi Purpose Cold Storage unit
under R.A.B.C. at Sadipur, Tajpur, Samastipur.
14.1212 30 28-Nov-12 - -
97 M/s Shahi Fresh Food India Pvt. Ltd., Patna. Proposal for establishment of 10,000 MT Cold
Chain, Pack House Ripening Chamber and
Logistic at Nayanagar, Hasanpur, Samastipur.
5.3987 30 13-Mar-13 - -
98 M/s Srijagannath Cold Storage Pvt. Ltd. Samastipur. Proposal for establishment of 10,000 MT
capacity Multi Purpose Cold Storage under
R.A.B.C. at Wajidpur, Samastipur.
12.6912 65 13-Mar-13 - -
99 M/S Binod Cold Storage Pvt. Ltd, Begusarai Establishment of 7000 MT capacity Cold
Storage, Sorting/Grading of Potato and Agri
Input Store under R.A.B.C. at Tilrath Devnath
Industrial Area, Barauni, Begusarai.
5.48 20 08-Mar-10 06-Jan-11
100 M/S Ambe Kamakhya Agronomy Pvt. Ltd, Begusarai Proposal for establishment of 5000 MT per
year capacity Cold Storage under Rural Agri
Business Centre at Bakhri Bazar, Begusarai.
3.91 20 19-Apr-10 06-Jan-11
101 M/S Meena Binay Nishant Bhawani Cold Storage Pvt. Ltd.
(M.B.N.B. Cold Storage Pvt. Ltd,), Patna.
Proposal for establishment of 9000 MT
capacity Cold Storage under R.A.B.C. at Teghra,
Begusarai.
9.3253 14 27-Jul-11 01-Feb-12
102 M/S Sunayana Cold Storage Pvt. Ltd., Begusarai. Proposal for establishment of 6000 MT Cold
Storage unit under R.A.B.C. at Fatehpur,
Begusarai.
4.0903 25 23-Feb-12 - -
103 M/S Bhusari Cold Storage Pvt. Ltd., Begusarai. Proposal for establishment of 7200 MT Cold
Storage unit under R.A.B.C. at Korjana, Cheria
Bariyarpur, Begusarai.
5.3843 15 23-Feb-12 - -
104 M/s Rajhans Cold Storage Pvt. Ltd. Begusarai 7690 MT to 11,890 MT under R.A.B.C. in
existing Cold Storage at Teghra Begusarai
2.7509 5 18-Sep-12 - -
105 M/S Sahu Agro Business Pvt. Ltd, Bhagalpur. Establishment of Cold Storage with capacity of
3000 MT, Warehouse with capacity of 1100 MT
and Pack House with the capacity of 200 MT
under R.A.B.C at Naugachia, Bhagalpur.
4.21 64 29-Jun-09 13-Dec-09
46
106 M/S Ashwini Jhunjhunwala, Tilkamanjhi, Bhagalpur. Establishment of 100 MT Cold Room, 500 MT
Pack House, Processing Hall, 1000 MT Agri
Input Warehouse and 5600 MT Grain Storage
Warehouse under R.A.B.C at Tilkamanjhi,
Bhagalpur.
5.9091 31 17-Aug-09 - -
107 M/S Hira Bharti Agro Pvt. Ltd, Bhagalpur. (Unit's proposal
approved by SIPB on 17.08.09 for establishment of 3000 MT
Cold Storage, 2800 MT Warehouse for grains and 600 MT
Pack House and Cold Room unde
Establishment of 3000 MT Cold Storage, 2800
MT Warehouse for grains and 600 MT Pack
House and Cold Room under R.A.B.C. at
Shivnarayanpur, Kahalgaon Bhagalpur.
4.77 38 08-Jun-10 - -
108 M/S Skill Foods Pvt. Ltd., Patna. Proposal for establishment of 1000 MT Multi
Purpose Cold Storage and 5000 MT Dry
Warehouse unit at Siljori, Chandan, Banka.
1.17 30 28-Sep-11 - -
109 M/s Jai Maa Kali Cold Storage Pvt. Ltd. Lakhisarai 6000 MT Multipurpose Cold Storage Under
R.A. B.C at Mohanpur, Lakhisarai
9.9352 30 13-Aug-12 - -
110 M/S Sukhjit Starch & Chemicals Limited, Phagwara, Punjab. Establishment of two Warehouse with the
capacity of 5000-5000 MT at
Naugachia(Bhagalpur) and Gulzarbagh
(Purnea).
12.62 50 29-Jun-09 13-Dec-09
111 M/S Ma Shitla Onion Storage Pvt. Ltd., Nalanda. Proposal for establishment of 4200 MT per
year capacity Onion Storage unit at Noorsarai,
Nalanda.
1.4756 14 28-Sep-11 - -
112 M/s Manju Cold Storage Pvt. Ltd. Nalanda 10,000 MT Cold Storage unit under R.A.B.C. at
Karampur Dharampur, Pawapuri, Nalanda
12.8912 50 13-Aug-12 - -
113 M/S Nutan Bhabya Rural Agro Solution Pvt. Ltd, Patna. Proposal for establishment of 3000 MT
Warehouse, 01 MT per hour Multi Grading Line
and Packing unit under R.A.B.C at Industrial
Area, Fatuha, Patna.
1.0057 20 29-Nov-10 - -
114 M/S Jira Devi Cold Storage Pvt. Ltd, Patna. Proposal for establishment of 6000 MT
capacity Cold Storage at Balipakar, Paliganj,
Patna.
4.6121 40 12-Jan-11 11-Jul-11
115 M/S Jest Liquors Pvt. Ltd., Patna. Proposal for establishment of 6000 MT
capacity Cold Storage unit at Nasriganj,
Danapur, Patna.
6.6908 8 23-Feb-12 - -
116 M/S Sushila Cold Storage Pvt Ltd, Ara (Cancelling the earlier
proposal approved on 17.8.09, present proposal as
establishment of 7000 MT capacity Cold Storage (5000 MT
capacity of Potato storage and 2
Establishment of 7000 MT capacity Cold
Storage (5000 MT capacity of Potato storage
and 2000 MT capacity of Fruit and Vegetable
storage), 2000 MT capacity Onion storage and
Primary Processing and Packa
7.05 85 21-Dec-09 11-Mar-10
117 M/S Vaishali Enterprises and Cold Storage Pvt. Ltd, Patna. Proposal for establishment of 11,000 MT Cold
Storage unit under R.A.B.C. at Giddha
Industrial Growth Centre, Ara, Bhojpur.
10 70 27-Jul-11 02-Dec-11
118 M/S Sakaldeep Cold Storage Pvt. Ltd., Bhojpur. Proposal for establishment of 5000 MT Multi
Purpose Cold Storage unit at Industrial Area,
Bihiya.
4.1061 9 26-Mar-12 - -
119 M/s Shakaldeep Cold Storage Pvt. Ltd., Bhojpur 10,000 MT Multipurpose Cold Storage unit
under R.A.B.C. at Industrial Area Bihiya,
Bhojpur
12.2123 60 13-Aug-12 - -
120 M/s Ram Janki Cold Storage Pvt. Ltd. Bhojpur 6000 MT cold Storage unit at Karisath, Bhojpur 4 13 18-Sep-12 - -
121 M/S Gauri Mangla Cold Storage Pvt. Ltd, Kaimur, Bhabhua. Proposal for establishment of 6000 MT Cold
Storage at Mukhrao, Kuchila, Kaimur,
Bhabhua.
3.6 13 29-Nov-10 16-Aug-11
122 M/S Protech Feed Pvt. Ltd., Patna Proposal for establishment of 2000 MT
capacity Frozen Cold Storage at E.P.I.P.,
Hajipur.
17.49 15 23-Feb-12 - -
123 M/S Protech Feed Pvt. Ltd., Patna Proposal for establishment of 6000 MT
capacity Cold Storage under R.A.B.C., at
E.P.I.P., Hajipur.
10.48 15 23-Feb-12 - -
124 M/S Keshri Cold Storage Agro Products and Construction Pvt.
Ltd, Rohtas.
Establishment of 7000 MT (5000 MT Potato
and 2000 MT Onion) capacity Cold Storage, 2
MT per hour Potato sorting/grading line, 2 MT
per hour capacity Modern Rice Mill and 4000
MT capacity Warehouse und
7.17 11 15-Feb-10 23-Apr-10
125 M/S Jai Kisan Food Products Pvt. Ltd, Sasaram, Rohtas. Proposal for establishment of 15,360 MT per
year capacity Grain Sorting and Grading unit
and 6000 MT Warehouse under R.A.B.C. at
Chandwa, Rohtas.
4.2977 30 27-Jul-11 - -
126 M/s Sarojani & Sarojani Cold Storage Pvt. Ltd., Hahanbad. 6000 MT Multi Purpose Cold Storage unit
under R.A.B.C at Neuru,Jahanabad.
9.7912 50 28-Nov-12 - -
127 M/s Aryan Agro Industries Aurangabad 10,000 MT Cold Storage unit in partnership at
Industrial Growth Centre, Jasoiya, Augangabad
6.2944 7 18-Sep-12 - -
128 M/s Maa Mndeshwari Auntomobiles, Aurangabad Tractor Servicing and Repairing unit in
Aurangabad
1.0526 25 18-Sep-12 - -
47
129 M/s Maa Mundewshwari Automobiles, Aurangabad 1400 Pieces per year capacity Agriculture
Equipment manufacturing unit and Mahindra
Tractor Workshop unit in proprietorship at
Industrial Growth Centre,Aurangabad.
3.5975 0 28-Nov-12 - -
130 M/s International Amusement Ltd., (APPU Ghar), New Delhi. Development of Mega Tourism City at LTC
Ghat, Patna.
1321.79 600 20-Sep-06 - -
131 M/S Prachin Bharat Tourism, Kalptaru Apartment, Bangalore Establishment of Multi Media Museum at
Nalanda
0.2 20 22-Oct-07 - -
132 M/s Patna Notre Dame Sister's Society, Patliputra, Patna. Establishment of Media arts and
Communication.
3.32 0 21-Aug-06 - -
133 M/S PI Systems Pvt. Ltd, Patna. Proposal for establishment of Information
Technology unit at Patliputra.
1.02 12 13-Aug-10 - -
134 M/s Brahmaputra Consortium Ltd., New Delhi Private Industrial Park,Bihta. 200 0 10-Jul-06 - -
135 M/S Essar Steel Limited, 11 K K Road, Mahalaxmi, Mumbai-
400034
Proposal for establishment of call center at
Bhagalpur and Patna
250 2000 09-Jun-08 - -
136 M/S Prachin Bharat Tourism, , Kalptaru Apartment,
Bangalore E-mail: [email protected]
Establishment of Integrated Tourist Park at
Nepura, Silao, Nalanda
5 100 08-Oct-07 14-Nov-07
137 M/S Prachin Bharat Tourism, Bangalore. Establishment of following proposals based on
outsourcing:- (a) Management of Tourist
Information Centre using new technology. (b)
Development and management of Website of
Bihar State Tourism Developm
0 0 18-Nov-08 - -
138 M/S Takshila Seas & Resorts Pvt. Ltd., Mumbai. Proposal for establishment of Water Park and
Pool Restaurant unit at Sona Gopalpur, Patna.
6.3 102 28-Sep-11 - -
139 M/S P & M Infrastructure Pvt. Ltd., 47, 47/B, Sahdeo Mahto
Marg, Sri Krishna Puri, Patna-1
Setting up of Bodh Gaya Resort at Bodh Gaya 18.41 250 02-Jan-08 - -
140 Prachin Bharat Tourism, Bangalore Establishment of Multimedia Museum at Bodh
Gaya
0.2471 0 09-Feb-09 - -
3869.2207 12619
1 M/S Cruinne Edulac Consultancy Services Pvt. Ltd, Patna. Proposal for establishment of Kautilya
International Business School in Bihta
Industrial Mega Park, Patna.
130.6 290 11-Aug-10 - -
2 M/S Moti Babu Institute of Technology, New Delhi. Proposal for establishment of Engineering
College at Forbesganj, Araria.
14.66 65 19-Apr-10 - -
3 M/S Netarhat Alumni Educational Trust (Vidya Vihar
Educational Trust), Purnea.
Proposal for Establishment of Engineering
College in Purnea
6.74 0 27-Feb-06 13-Jun-06
4 M/s Telecomand Software Pvt. Ltd., Katihar 3/4 Years Course on Computer Science 0 0 01-Aug-06 - -
5 M/S Madina Educational Welfare Trust, Swarnim, East Boring
Canal Road, Patna.
Establishment of Engineering College at
Darbhanga(Simri, P.O.-Birdipur, Dist.-
Darbhanga)
12.5 57 01-Feb-07 10-May-08
6 M/S Maharshi DAV Educational Trust, Haryana Establishment of College for Engineering &
Diploma Cma Course at Muzaffarpur
4.06 30 19-May-08 25-Jul-08
7 M/S Shahi Foundation, Gannipur, Muzaffarpur Proposal for establishment of Engineering
College at Dighra, Mushari, Muzaffarpur.
6.99 38 18-Nov-08 - -
8 M/s Association of Management Studies, 17, Mall Road ,
Meerut Cant(U.P).
Establishment of Engineering/ Management/
Medical College at Chapra and Patna.
17.5 0 01-Feb-07 - -
9 M/S Amrapali Foundation, New Delhi. (Approval has been
given for change of place from Motihari to
Kumarbagh(Bettiah) in SIPB meeting held on 20.07.09)
Establishment of Engineering College at
Foundation's Campus- Begusarai, Jamalpur and
Kumarbagh(Bettiah)and Management Institute
at Motipur.
18.952 247 29-Jun-09 - -
10 M/S Patliputra Educational and Welfare Foundation, Patna. Proposal for establishment of Educational
Institute of Engineering and Polytechnic
College in two phases at Islampur, Nalanda.
30 150 24-May-10 - -
11 M/S P. M. R. Educational Trust, 2036, 15 th Main Road, Anna
Nagar, West Chennai-600040
Setting up of Engineering College in Bihar 35 0 02-Jan-08 30-Mar-08
12 M/S All India Asian Educational Foundation, 3&4,
Industrial Area, Jasola (Sarita Vihar), New Delhi-110025
Proposal for opening of Technical Institute at
Patna.
51 19 29-Sep-08 - -
13 M/S Birsa Institute of Technology, Ratu Road, Ranchi Establishment of Engineering College in Bihar. 0 0 29-Sep-08 - -
14 M/S Oriental Group of Institutes, Bhopal Establishment of Engineering College at Patna 59.84 300 01-Feb-10 - -
15 M/s Social Welfare Organization of India, Patna. Proposal for establishment of Food Technology
Entrepreneurship and Testing Laboratory at
Mega Industrial Park, Bihta, Patna.
10.69 53 13-Mar-13 - -
16 M/s Alaknanda International Educational Society, Dehradun. Engineering College at Sahpur, Bhojpur 16.8 55 28-Nov-12 - -
17 M/S Vidyadaan, New Delhi. Proposal for establishment of Engineering
College in the name of ''Vidyadaan Institute of
Technology and Management'' at Ariaon,
Dumraon, Buxar.
11.3295 165 23-Feb-12 - -
Institution & HospitalTOTAL :-
48
18 M/S Sityog Educational & Welfare Society, Patna Establishment of Engineering and
Management College at Aurangabad.
3.2 56 16-Nov-09 - -
19 M/s Universal Empire Group, C-04/23, First Floor, Safdar
Ganj Development Area, Haujkhas, New Delhi.
Establishment of Medical College at Bettiah
District
0 0 20-Mar-06 - -
20 M/s Medi Contrivers India (P) Ltd.,Jogeshwari, Mumbai. Establishment of Medical College and
modernization of MJK
Hospital,Bettiah(W.Champara).
0 700 02-May-06 - -
21 M/s Lord Buddha Shiksha Prathisthan, Saharsa. Medical College Hospital 100 0 24-Jul-06 - -
22 M/s Shrinivas (G) Educational & Research Institute of
Medical Sciences. Patna
Super Speciality Hospital and Highar
Educational Institute Medical College at
Garkha, Chapra.
143 200 13-Aug-12 - -
23 M/s Adarsh Divya Vikash Hospital and Research Centre,
Patna.
Establishment of Multipurpose Medical
facilities and Research Centre in Hajipur.
275 622 02-May-06 - -
24 M/S Munger Medical College Trust, Munger Establishment of Medical College at Munger 22 300 24-Sep-07 - -
25 M/s Hai Medicare & Research Institute Pvt.Ltd.,Patna. Establishment of Minority Medical College at
Rajabazar,Patna.
8 0 02-May-06 - -
26 Dr. Ashok Kumar ,Medical World 4U Ltd., Sussex. U.K Establishment of Medical College and Super
Specialty Hospital at Patna.
148.87 0 02-May-06 08-Sep-06
27 Dr. Rajeshwar Thakur , Patna. (i) Proposal for Multi Super Specialty Hospital
in the Jay Prabha Hospital Complex K.Bagh,
Patna. (ii) Establishment of Medical College
(with training) of National repute.
800 0 02-May-06 - -
28 M/s Indo-American Medical Foundation ,USA , Dr.
Purshottam Madhu.
Establishment of Hospital and Medical College
within 30 KMs of Patna.
100 0 02-May-06 - -
29 M/s Suncancer Hospital and Research Institute,Patna. Establishment of Cancer Hospital and Research
Institute
0 0 10-Jul-06 - -
30 M/S Siddivinayak Trust for Nature, Education and Health,
101, Shanti Kunj Apartment, T.N. Benerjee Road,
Chhajjubagh, Patna-1. E-mail: lallsanjeev @yahoo.com
Setting up of Dental College and Hospital at
Patna
15.1 0 19-Feb-07 - -
31 M/S Medical World 4U Ltd., M.D- Dr. Ashok Kumar, 49
Truman Drive, High Beech, Saint Leonards-on-Sea, East
Sussex, TN- 377 TH , U.K.
Company's proposal for establishment of
Dental College and Para Medical College in the
name of Lord Buddha International Institute of
Medical Science
148.87 0 25-Feb-08 - -
32 M/S Apollo Hospitals Enterprise Limited, Ali Tower, 55,
Greams Road, Chennai
Establishment of state-of- art hospital,
accommodation, educational and training
infrastructure under Health Care
Infrastructure.
40 376 21-Apr-08 25-Jul-08
33 M/S All India Asian Educational Foundation, 3&4,
Industrial Area, Jasola (Sarita Vihar), New Delhi-110025
Establishment of Institute of Medical Sciences,
Dental Sciences and Nursing Sciences at Patna
150 0 09-Feb-09 - -
34 M/S Employees' State Insurance Corporation, Patna Establishment of Medical College and Hospital
at Patna
201 500 09-Feb-09 - -
35 M/s Sitwanto Devi Mahila Kalyan Sansthan, Jamshedpur. Proposal for establishment of Medical College
and Hospital in the name of Netaji Subhash
Medical College at Dumri, Bihta, Patna.
53.5 150 08-Feb-13 - -
36 Sri Vinod Kumar Chaudhry ,M/s Ambedkar Medical
&Technical Educational Development Trust, Lohiya
Nagar , Patna.
Establishment of Medical and Dental College at
Arrah (Bhojpur)
35.076 0 02-May-06 31-Jul-06
37 M/S Malti Holy health & Welfare Society, Arrah, Pakri,
Bhojpuojpur.
Establishment of Medical College and Hospital
at Arrah, Bhojpur.
0 0 29-Sep-08 - -
38 M/S Narayan Chikitsalay, Rohtas Establishment of Medical College at Sasaram
Road, Jamuar, Rohtas.
0 0 29-Sep-08 - -
39 M/s Savitri Memorial Trust, Aurangabad. Proposal for establishment of Para Medical
College in the name of M/S Surendra-Savitri
Memorial Institute of Para Medical and Allied
Sciences at Industrial Growth Centre,
Aurangabad.
1.9432 21 13-Mar-13 - -
40 M/s Devi Prasad Bhimseria Hospital Pvt. Ltd., Muzaffarpur Proposal for establishment of 112 bed Hospital
and Diagnostics Facility at Purani Gudri,
Muzaffarpur.
8.3568 97 08-Feb-13 - -
41 M/s Mooichand Healthcare Pvt. Ltd. New Delhi Multi Speciality Tertiary care Hospital and
Diagnostic Centre at E.P.I.P. Hajipur
503.5 2150 18-Sep-12 - -
42 M/S Jagat Developers Ltd., 'Ujwal', 2nd Floor, Bailey Road,
Opposite Patna Museum
Establishment of Super Specialty Hospital in
Bailey Road ,Patna.
45 700 23-Oct-06 - -
43 M/s SRS Multispecitality Hospital, Aurangabad 100 bed Super Multi Speciality Hospital in
Proprietorship at jaosiya, Aurangabad
14.8043 60 28-Nov-12 - -
44 M/s Jesuit Society Provincial Residence, Patna. Rural Management and Allied Institute(Near
Balmi Complex)
0 0 10-Jul-06 - -
45 M/S Vikramshila Educational and Welfare Society, Patna. Establishment of Management Institute in the
name of Indian School of Management at Vill-
Sarai, Khagaul, Patna.
15.13 44 19-Oct-09 01-Feb-10
46 M/S Netaji Subhas Institute of Technology, Patna. Proposal for establishment of new syllabus for
M.Tech., M.B.A. in Netaji Subhas Institute of
Technology, Amhara, Bihta, Patna.
25.12 0 11-Aug-10 - -
49
47 M/s Shilpee Educational Trust, Patna Nurses Training College at Maranga Industrial
Area, Maranga, Purnea
1.7187 23 18-Sep-12 - -
48 M/S Mother Teresa Nursing School,(Pro.- M/S Gandhi
Educational Trust), Katihar.
Proposal for establishment of Nursing Training
Institute in the name of Mother Teresa Nursing
School at Mongra Fatak, Dalan, Katihar.
5.256 29 11-Jun-12 - -
49 M/S XavierÆs Girls School, Muzaffarpur Establishment of 10+2 Level XavierÆs Girls
School at Industrial Area, Bela, Muzaffarpur.
2.2 46 30-Nov-09 - -
50 M/S Gokul Sericulture Production and Training Centre,
Gokul, Pilkhi, Muzaffarpur
Establishment of Sericulture Production and
Training Centre at Gokul, Pilkhi, Muzaffarpur in
the name of M/S Gokul Sericulture Production
and Training Centre by M/S Maha Lakshmi
Kripa Social and Educa
2.53 65 11-Jan-10 - -
51 M/S Ram Rati Devi Memorial Trust, Digha, Patna. Proposal for establishment of B.Ed. Training
College in the name of Magadh Teacher
Training Centre at Industrial Area,
Muzaffarpur.
1 20 26-Mar-12 - -
52 M/S Chaitanya Gurukul Trust, Gopalganj. Establishment of Educational Institution as-
Model School from class 1 to 12, Degree
Engineering College and Research and
Development at Chamanpura, Gopalganj
30 200 18-May-09 - -
53 M/s Bapuji Educational & Development Trust, Saran. Teacher Traing College in the name of
"Ramadhar Singh Teacher Trainging College"
At Amdhari, Ekma, Saran.
2.378 16 28-Nov-12 - -
54 M/S Licchavi Foundation, Hajipur( Vaishali) Establishment of B.Ed. Teacher's Training
Institute at Hajipur, Vaishali.
1.61 19 11-Jul-08 08-Sep-08
55 M/S R.N.Dwivedi Foundation, Patna Establishment of Composite Educational
Complex at Patliputra Industrial Estate
10.08 227 19-May-08 - -
56 M/S Institute of Chartered Accountant of India, Frazer Road,
Patna.
Proposal for establishment of a Branch of
Chartered Accountant of India at Patna
0 0 18-Nov-08 - -
57 M/S Bajaj Buildcon Pvt. Ltd, Patna. Establishment of Resort, Water Park and
Educational Development at Patna.
285 0 29-Jun-09 - -
58 M/S Kanika Buildcon Pvt. Ltd, Patna Establishment of Mall-cum- Multiplex, Health
and Medical, Educational Development and
Residential Complex at Patna.
365 0 29-Jun-09 - -
59 M/S Advantage Educational Society, New Delhi. Establishment of Advantage Media Academy at
off Bailey Road, Patna.
7 30 29-Jun-09 - -
60 M/S Jagran Institute of Management & Mass
Communication, PatnPatna.
Proposal for establishment of Jagaran Institute
of Management & Mass Communication
at Bihta, Patna of M/S Shri Puran Chandra
Gupta Smarak Trust, Kanpur
0 0 30-Nov-09 - -
61 M/S Raghunandan Teachers Training College, Promoter-Baba
Educational Trust, Danapur, Patna.
Establishment of B.Ed. Teachers Training
College at Mathiyapur(Kali Asthan), Danapur,
Patna.
1 30 04-Jan-10 - -
62 M/S Mother's Society for Education and Child Development,
Delhi.
Proposal for establishment of Engineering and
Management Institute by the Society at
Industrial Park, Bihta.
13.73 82 23-Feb-12 - -
63 M/S Ritnand Balved Education Foundation, New Delhi. Proposal for establishment of University in the
name of Amity University Bihar at Patna.
83.18 0 23-Feb-12 - -
64 M/s pentagon Maritime Training and Research Institute,
Navi Mumbai.
Proposal for establishment of Maritime
Institute nearby Patna.
15 80 13-Mar-13 - -
65 M/S Bihar College of Education, Promoter- Nav Bharti Trust,
Patna
Establishment of Training College in the name
and style of Bihar College of Education at
Giddha Industrial Area, Ara.
1.0704 17 16-Nov-09 - -
66 M/S Magadh Institute of Higher Education, Patna Proposal for establishment of B.Ed. Degree
College at Dehri on Sone, Rohtas.
1 20 26-Mar-12 - -
67 M/S Sri Hari Educational & Welfare Trust, Patna. Proposal for expansion of Industrial Training
Centre established by the trust in the name of
Sri Hari Industrial Training Centre at
Haridaspur, Khagaul Nahar Road,Rupaspur,
Patna.
0.87 17 11-Jun-12 - -
68 M/S Girja Devi Polytechnic College(Promoter- M/S Suchit
Singh Memorial Educational Trust), Patna.
Proposal for establishment of Polytechnic
Institute in the name of Girja Devi Polytechnic
College by the Trust at Bihiya, Bhojpur.
1.3593 52 27-Jul-11 - -
4115.1142 8418
1 M/s Jai Durga Print & Packaging, New Delhi 900 MT per year capacity Printed Cotton Box
production unit in proprietorship at
Muzaffarpur
1.3116 16 28-Nov-12 - -
2 M/s Ocean Filtration Pvt. Ltd., Delhi 5000 Pieces per year capacity Water Purifier
and R.O. System Production unit at Industrial
Area, Muzaffarpur
2.5635 25 28-Nov-12 - -
3 M/s Genial Polymers Pvt. Ltd., Vaishali. 750 MT per year capacity Pet Preform
Production unit at Hajipur Industrial Area,
Vaishali
1.1891 8 18-Sep-12 - -
TOTAL :-
Misc. Item n.e.c.
50
4 M/s Samrat Laboratories, Unit-2, Samastipur. Proposal for establishment of unit-2 for
production of 16,500 Ton per year capacity
Formaldehyde at Harpur Alloth, Industrial
Area, Samastipur
3.38 49 13-Mar-13 - -
5 M/s Siddhi Vinayak Petro Chemicals, Begusarai. Cationic Bitumen Emulsion (15,600 MT per
year capacity) production unit in
proprietorship at Industrial Area, Barauni
Begusarai
5.39 15 18-Sep-12 - -
6 M/s Jain Cotton Industies, Bhagalpur. 1200 MT per year capacity of "B" Grade Cotton
Layer Sheet Production unit in proprietorship
at Bhagalpur
1.044 30 28-Nov-12 - -
7 M/S Geneva Software Technologies Ltd, Bangalore Proposal for working in the field of Disaster
Information Management and Enterprise
Solution at Patna.
0 0 16-Dec-08 - -
8 M/S Pristine Magadh Infrastructure Pvt. Ltd, New Delhi Proposal for establishment of Rail Linked
Logistic-cum- Industrial Park at Bihta, Patna.
48.26 100 26-May-11 - -
9 M/s Lal Bhai Construction Equipments Pvt. Ltd. Patna. 580 pieces per year capacity Reversible Mixer,
Batching Plant, Disaster and Safety Equipment
and Machineries (Building Construction
Equipment) Production unit at Industrial Area,
Fatuha, Patna.
8.746 129 18-Sep-12 - -
10 M/s Lal Bhai Contruction Equipments Pvt. Lts. Patna. 1500 Pieces per year capacity Building
Construction Tools production unit at
Industrial Area, Fatuha, Patna.
2.0087 46 18-Sep-12 - -
11 M/s BMW Ventures Ltd. Patna. 25,000 MT per year capacity M.S.T.M.T.
(Thermo Mechanically Twisted) and Sheet
Cutting Processing unit at industrial Area,
Fatuha, Patna.
38.7 300 18-Sep-12 - -
12 M/s Marps Organics, Patna Formaldehyde Plant unit in proprietorship at
Fatuha Industrial Area, Fatuha,Patna
3 40 18-Sep-12 - -
13 M/s Satya Enterprises Pvt. Ltd., Patna 840 MT per year capacity Fuel Oil Production
in the existing unit at Industrial Area, Patlipura,
Patna.
1.0716 9 28-Nov-12 - -
14 M/s Tanya Enterprises, Aurangabad Air Separation unit for production of 150 Cubic
Newton Meter per hour capacity
Oxygen/Nitrogen Gas in proprietorship at
Aurangabad
3.2995 14 18-Sep-12 - -
15 M/s Progressive Emulsion Bitumen Manufacturer (India) Pvt.
Ltd., Patna.
96000 MT per year capacity Bitumen Emulsion,
Crum Rubber Modified Bitumen and Polymer
Modified Bitumen unit at Sarsu, Atri, Gaya.
1.485 50 18-Sep-12 - -
16 M/s Kalyanpur Building Materials Pvt. Ltd. Panta. 30,000 Cubic Meter Capacity Autoclaved
Aerated Concrete (AAC) Blocks production unit
in Aurangabad
78.17 64 13-Aug-12 - -
199.619 895