Download - Sikkerhetsforums årskonferanse 3. juni 2010 - ptil.no · PDF fileGlobal Manufacturing Training 2008. ... SP Steam Turbine Safety. GP steam Turbine Safety. HE Tube Plugging. ... 10.

Transcript

Sikkerhetsforums årskonferanse 3. juni 2010

”Med verden og landanleggene som lærearena”

Bensintank ble tatt ut for vedlikehold - Slagen 1981

R&S:3 sites with multiple instances

Singapore (3 – fall, OPE, electrical-related) Torrance (3 – electrical-related, fall, OPE) Sakai (2 – fall, fall)

Nagoya (’03) and Singapore (’07) had multiple-fatality incident

Mandatory global practices address historical high-consequence incidents

Working At Heights Tank CleaningOpening Process EquipmentEnergy Isolation and Electrical Safety-Related Work PracticesInert EntryConfined SpaceAsbestos Management (OHGP)

Downstream Fatal Incident Distribution 2000 - 2009

R&S26

L&S4

FM38

R&S Fatal Incidents By Activity

TankCleaning

6

Electrical-Related

3

Fall From Height

6

Other3

Opening Process

Equipment5

OI Asbestos-Related

3

MIT Major Incident Team

2004

Hazops og Transient Hazops

2007/8

HLVIHigh Learning Value Incidents

>10 år

Sikkerhetsbulletiner>10 år

Ptil-rapporter & eksterne hendelser

BP TEXAS2005 GMT

Global Manufacturing Training

2008

Raffineriets ramme-betingelser og ledelses-Systemer (1994)

Tool Box’er>10år

Agenda

Bestnets10 år

“OPERATING” SYSTEMS GLOBAL MANUFACTURING OI PRACTICES (GMOP’s)

2.1 Risk Management- delayed coker risks

BBS/ LPS -- SWP’s – Tier III BP’sOH Global PracticesGlobal Manufacturing Training

6.1 Alarm Management6.3 Critical Equipment6.4 Mechanical Integrity

(GRS, IMSA, etc)

7.1 Management of change

9.1 Incident Investigation and Analysis

11.Assessment & Improvement

GMOPs , OHGP’s, SWP’s, LPS, GMT for consistent definition & execution of System Requirements

Tier I’s, GP’s and DP’s for consistent mitigation of high risks

1. ManagementLeadership,

Commitment,& Accountability

Tier I BP’s

Tank Cleaning Working at Heights

Opening Process EquipmentConfined Space Entry

Inert Entry Energy Isolation

Safe Electrical WorkCrane & Lifting Operations

Portable Building SitingShort Service Workers

Global Common Basic PPE

CT Microbiological ControlAnalyzer Shelters SafetySP Steam Turbine SafetyGP steam Turbine Safety

HE Tube PluggingTest Intervals of SCD

OIMS – 11 ELEMENTS64 EXPECTATIONS- 21 SYSTEMS

200 REQUIREMENTS

2. Risk Assessment and Management

3. Facilities Design and Construction

4. Information/Documentation5. Personnel and Training

5.1 Personnel Safety5.2 Occupational Health5.3 Personnel5.4 Training

6. Operations and Maintenance6.1 Opn’s & Maint. Procedures6.2 Work Permits6.3 Critical Equipment 6.4 Mechanical Integrity6.5 Environmental Protection6.6 Regulatory Compliance6.7 Operations Interface Mgt

7. Management of Change8. Third Party Services9. Incident Investigation & Analysis10. Community Awareness &

Emergency Preparedness10.1 Emergency Preparedness10.2 Community Awareness

API RP 751 HF Alky Safe Ops

EMRE DP’s & GP’s

Safe Operating Index

While each component mitigates personnel safety risks, highlighted blue items provide direct focus on personnel safety

Over the next several weeks Safety Bulletins will be distributed for each of these

incidents that describe the incident in more detail and provide incident learnings.

2010 status hittil i år: