7/30/2019 Senior Capstone Project - Bancroft Entrance
1/45
Bancroft Entrance
Joe BrownMarty Farkas
Danielle JacobyHannah Renzhofer
Demar Watkins
7/30/2019 Senior Capstone Project - Bancroft Entrance
2/45
Background
The North entrance to
the University of Toledo
campus has poor traffic
flow and congestion
Lack of direct accessibilityfrom Lot 2 to Bancroft St.sidewalks
7/30/2019 Senior Capstone Project - Bancroft Entrance
3/45
Objectives
Reduce congestion at
intersection of N.
Towerview Blvd. and
Bancroft St.o School rush hours
o Game day traffic
Create ADA compliant ramp
connecting Lot 2 to sidewalk
along Bancroft St.
7/30/2019 Senior Capstone Project - Bancroft Entrance
4/45
Constraints
AASHTO Guidelines
ADA Compliance
City of Toledo Rehabilitation Plan
Maintenance of Traffic
Space
Timing
University of Toledo Campus Aesthetics
7/30/2019 Senior Capstone Project - Bancroft Entrance
5/45
Components
1. Intersection
1. Pedestrian Ramp
1. East Ramp Drive - One Lane
1. East Ramp Drive - Two Lanes
7/30/2019 Senior Capstone Project - Bancroft Entrance
6/45
Site Map
7/30/2019 Senior Capstone Project - Bancroft Entrance
7/45
Intersection
Projected 20 year Design hourly volumes
**1% per year - growth factor
175
772
37639
7
252
180
181
1220
127
114
248
288
7/30/2019 Senior Capstone Project - Bancroft Entrance
8/45
Intersection
** Highway Capacity Manual 2000 - Level of Service
Letters A to F. (A is best and F is the worst) Most design or planning efforts use service flow rates
at LOS C or D
LOS E is a common standard in larger urban areas,
where some roadway congestion is inevitable
7/30/2019 Senior Capstone Project - Bancroft Entrance
9/45
Intersection
7/30/2019 Senior Capstone Project - Bancroft Entrance
10/45
Intersection
Current Striping Striping - Build
7/30/2019 Senior Capstone Project - Bancroft Entrance
11/45
Intersection
Current Phasing
2033 Build Phasing
7/30/2019 Senior Capstone Project - Bancroft Entrance
12/45
Intersection
Timing - 2013 Current (120 sec)
Timing - 2033 Build (120 sec)
7/30/2019 Senior Capstone Project - Bancroft Entrance
13/45
Current Crosswalk
7/30/2019 Senior Capstone Project - Bancroft Entrance
14/45
Crosswalk
Concrete Crosswalk - Cross-sectional Area
7/30/2019 Senior Capstone Project - Bancroft Entrance
15/45
Crosswalk
Pavement Resurfacing
7/30/2019 Senior Capstone Project - Bancroft Entrance
16/45
Future Crosswalk
7/30/2019 Senior Capstone Project - Bancroft Entrance
17/45
Intersection
Components
Resignal
Resurface
Striping
Crosswalk
Mobilization
Total
Cost
$5,200
$18,100
$2,900
$19,700
$8,000
$53,900
7/30/2019 Senior Capstone Project - Bancroft Entrance
18/45
Pedestrian Ramp
7/30/2019 Senior Capstone Project - Bancroft Entrance
19/45
Existing Conditions
7/30/2019 Senior Capstone Project - Bancroft Entrance
20/45
Existing Gateway
7/30/2019 Senior Capstone Project - Bancroft Entrance
21/45
'Goat Path'
7/30/2019 Senior Capstone Project - Bancroft Entrance
22/45
Pedestrian Ramp
7/30/2019 Senior Capstone Project - Bancroft Entrance
23/45
Pedestrian Ramp
7/30/2019 Senior Capstone Project - Bancroft Entrance
24/45
Pedestrian Ramp
Advantages
Provides access toBancroft from
Parking Lot 2
ADA compliantramp (1:12 slope)
Stairs provided asan alternativeroute to the ramp
Disadvantages
Cost
Relocation ofexisting light pole
Loss of 7 parkingspaces
7/30/2019 Senior Capstone Project - Bancroft Entrance
25/45
Pedestrian Ramp
Components
Removal
Ramp Wall
Decorative Wall
Sidewalk
Landscaping
Relocate Light
Miscellaneous
Total
Cost
$12,500
$42,500
$13,500
$9,000
$15,000
$2,500
$9,500
$104,500
7/30/2019 Senior Capstone Project - Bancroft Entrance
26/45
East Ramp Drive - One & Two Lane
7/30/2019 Senior Capstone Project - Bancroft Entrance
27/45
Current View from Bancroft
7/30/2019 Senior Capstone Project - Bancroft Entrance
28/45
Existing Snow Gate
7/30/2019 Senior Capstone Project - Bancroft Entrance
29/45
East Ramp Drive - One Lane
Right Turn Exit Only
7/30/2019 Senior Capstone Project - Bancroft Entrance
30/45
East Ramp Drive - One Lane
7/30/2019 Senior Capstone Project - Bancroft Entrance
31/45
East Ramp Drive - One Lane
7/30/2019 Senior Capstone Project - Bancroft Entrance
32/45
7/30/2019 Senior Capstone Project - Bancroft Entrance
33/45
East Ramp Drive - One Lane
Advantages
No retaining wall
Lower cost
Reduces exitingcongestion
Disadvantages
Single direction
Loss of 4 parkingspaces
7/30/2019 Senior Capstone Project - Bancroft Entrance
34/45
7/30/2019 Senior Capstone Project - Bancroft Entrance
35/45
East Ramp Drive - Two Lanes
Entrance & Right Turn Exit Only
7/30/2019 Senior Capstone Project - Bancroft Entrance
36/45
East Ramp Drive - Two Lanes
jjjjjjjj
Design Alternative I Alternative II
7/30/2019 Senior Capstone Project - Bancroft Entrance
37/45
East Ramp Drive - Two Lanes
Entrance & Right Turn Exit Only
7/30/2019 Senior Capstone Project - Bancroft Entrance
38/45
East Ramp Drive - Two Lanes
Entrance & Right Turn Exit Only
7/30/2019 Senior Capstone Project - Bancroft Entrance
39/45
East Ramp Drive - Two Lanes
Entrance & Right Turn Exit Only
7/30/2019 Senior Capstone Project - Bancroft Entrance
40/45
East Ramp Drive - Two Lanes
Advantages
Both entrance &exit
Reduces congestionfrom otherentrance/exit
Disadvantages
Retaining wallneeded
Higher cost
Loss of 6 parkingspaces
7/30/2019 Senior Capstone Project - Bancroft Entrance
41/45
East Ramp Drive - Retaining Wall
Factor of Safety - Sliding: 7.11
Factor of Safety - O.T.: 3.06
7/30/2019 Senior Capstone Project - Bancroft Entrance
42/45
East Ramp Drive - Two Lanes
Components
Demolition
Pavement
Drainage
Pavement Marking
Structures
Miscellaneous
Total
Cost
$24,500
$71,000
$13,100
$1,100
$44,200
$32,800
$186,700
7/30/2019 Senior Capstone Project - Bancroft Entrance
43/45
Cost Estimates Overview
Component
1. Intersection
2. Pedestrian Ramp
3. Drive - One Lane
4. Drive - Two Lanes
Package (1,2,& 3)
Package (1,2, & 4)
Cost
$53,900
$39,000*
$144,800
$186,700
$237,700*
$279,600*
7/30/2019 Senior Capstone Project - Bancroft Entrance
44/45
Conclusion/Recommendations
Based on extensive modeling, the bestcomponents and options have beenprovided
All provided components meet the initialguidelines set by the University of Toledo
Components can be packaged together inany configuration desired or separately
7/30/2019 Senior Capstone Project - Bancroft Entrance
45/45
Acknowledgements
Daniel P. KlettUniversity Architect
Douglas CollinsDirector, Grounds and Off-Site Facilities
Richard S. Martinko, P.E.Director, Intermodal Transportation Institute
UT University Transportation Center
Donald O'Connor, P.E.City of Toledo, Division of Transportation
Gary A. Stookey, P.E.
City of Toledo, Division of Transportation
Karl Huss, P.E.City of Toledo, Division of Transportation
Nicholas A . Taylor, P.E.DGL Consulting Engineers
Mike LivingstonRudolph/Libbe Inc
Christian SimpsonRudolph/Libbe Inc
Bryan Ellis, P.E., P.S.University of Toledo
Dr. Douglas Nims, P.E., Ph.D.University of Toledo
Dr. Nicholas KissoffUniversity of Toledo