ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL SCHEMATIC DESIGN PRESENTATION
23 MAY 2017
Project Milestones
Schematic Design ……………………………………………..…………….……………….. March – May 2017
SD Presentation to Board of Trustees ……………………………………………..….…….…….. 23 May, 2017
Design Development …………………………………………….………………….…….…. May – August 2017
Construction Documents…………………………..……..……………….….......… August – December 2017
Construction Begins …………………………….…………………..……………………………… February 2018
Construction Substantial Completion …………………………….……………………..………… March 2019
1. Project Scope
Bond Scope Diagram
• Culinary Addition • Health Science
Renovation • Security Vestibule • Ag Barn Renovation
• HVAC and Welding
• into Computer Labs Renovation of Classrooms
N
2. Site Plan
Site Diagram
TURNER HIGH SCHOOL CAMPUS
N
Site Use Diagram
ATHLETICS
PRA
CT. PARKING
PARKING
GRAZING
AG. H.S.
N
Site Use Diagram
PROPOSED AREA
ATHLETICS
H.S.
PRA
CT. PARKING
PARKING
GRAZING
AG.
N
Site Diagram
Storm Sewer
Concessions and Restroom access
Exit Stair
Athletics Access
Exit Stair
Athletics Access
Vet Med access
CTE entry
N
ite Plan
Practice Field
Grazing
Proposed S
Future Expansion
Service Yard
New Welding and HVAC Program
New Culinary Program Relocated Handicap Parking
Ag Barn Expansion
N
3 Design Proposals
Existing Overall Plan – First Floor Plan
Science
Kitchen Classrooms
Health ScienceClassrooms
Dining
Theatre
Athletics ClassroomsJUNIOR HIGH SOUTH
(Not In Scope) CTE Vet Clinic
CTE Dental Library
Gym Gym
Auditorium Assistant Principal
Counselor Stage Principal
Choir Reception
Band
N
Proposed Overall Plan – First Floor Plan
Science PROPOSED WELDING LAB
Kitchen RENOVATED HEALTH SCIENCE
Classrooms
Classrooms PROPOSED HVAC LAB
Dining Athletics Classrooms JUNIOR HIGH SOUTH
(Not In Scope) CTE Vet Clinic
CTE Dental
Library Theatre Gym Gym PROPOSED
CULINARY ARTS
Auditorium Assistant Principal
Counselor Stage Principal
Choir Reception
Band
N
Proposed Overall Plan – Second Floor Plan
Science
Mech
Mech Stair
Mech
Classroom
N
Existing Computer Labs
Classroom
Classroom
Existing Computer Labs
Proposed Overall Plan – Second Floor Plan
Science
Mech
Mech Stair
Mech
Classroom
Classroom
RENOVATED COMPUTER LABS (EXISTING CLASSROOMS)
RENOVATED COMPUTER LABS (MINOR UPGRADES)
Classroom
N
Existing Computer Labs
3.1 Culinary Arts
Adjacency Diagram
The Guthrie Center Spring Branch ISD
DINING
CLASSROOM
LAB
LAB LAB
SUPPORT
LAUNDRY 70 SF Proposed CTE Culinary Arts LINEN 80 SF
EXISTING VET CLINIC
EXISTING CORRIDOR
EXISTING DENTAL
MECH/ W MSUPPORT
1100 SF
CAFÉ 660 SF
OUTDOOR DINING
ENTRY
N
CLASSRM/ OFFICES 760 SF
CLASSRM/ OFFICES 760 SF
CLASSRM/ OFFICES 760 SF
DINING 1600 SF
(SEATS APPROX. 80-100 PEOPLE)
DRY STORAGE 400 SF
COOLER FREEZER 200 SF 206 SF
WASH. 450 SF
EQUIPMENT STOR. 360 SF
PASTRY STORAGE 125 SF
PASTRY LAB 875 SF
CULINARY LAB 1060 SF
CULINARY LAB 1100 SF
CULINARY LAB 1100 SF
STORAGE 168 SF
SERVING 375 SF
Proposed CTE Culinary Arts
DRY STORAGE 400 SF
EXISTING COOLER FREEZER VET CLINIC 200 SF 206 SF
WASH. EXISTING CORRIDOR 450 SF
EXISTING DENTAL
MECH/ W MSUPPORT
1100 SF
CAFÉ 660 SF DINING
1600 SF
OUTDOOR DINING (SEATS APPROX. 80-100 PEOPLE)
ENTRY
N
LAUNDRY 70 SF
LINEN 80 SF
EQUIPMENT STOR. 360 SF
PASTRY STORAGE 125 SF
PASTRY LAB 875 SF
CULINARY LAB 1060 SF
CULINARY LAB 1100 SF
CULINARY LAB 1100 SF
STORAGE 168 SF
SERVING 375 SF
Proposed CTE Culinary Arts
DRY STORAGE 400 SF
EXISTING COOLER FREEZER VET CLINIC 200 SF 206 SF
WASH. EXISTING CORRIDOR 450 SF
EXISTING DENTAL
MECH/ W MSUPPORT
1100 SF
CAFÉ 660 SF DINING
5000 SF
OUTDOOR DINING (SEATS APPROX. 300 PEOPLE)
ENTRY
N
LAUNDRY 70 SF
LINEN 80 SF
EQUIPMENT STOR. 360 SF
PASTRY STORAGE 125 SF
PASTRY LAB 875 SF
CULINARY LAB 1060 SF
CULINARY LAB 1100 SF
CULINARY LAB 1100 SF
STORAGE 168 SF
SERVING 375 SF
3.2 Welding & HVAC Labs
Proposed CTE Welding & HVAC Labs ENTRY
CLASSROOM WELDING 950 SF LAB DATA 170 SF EQUIP. 1130 SF GAS STORAGE
925 SF STOR
ELECTRICAL 170 SF
PPE 235 SF MAKER SPACE WELDING 4440 SF OFFICE 173 SF YARD
METAL
EXIS
TING
BUI
LDIN
G STORAGE
750 SF CLASSROOM
STO
RAG
E33
5 SF
STO
RAG
E54
5 SF
WELDING LAB 840 SF
1130 SF
BRAZING & SOLDERING 265 SF OFFICE 125 SF
HVAC LAB HVAC 3600 SF COMPUTER YARD
LAB 1090 SF
HVAC UNITS AREA
EXISTING BUILDING
N
3.3 Ag Barn
Existing Ag
EXISTING MECH
EXISTING CLASSROOMS
EXISTING MENS RESTROOM
EXISTING CONCESSION
EXISTING SHOP
EXISTING WOMENS RESTROOM
EXISTING CATTLE
EXISTING HVAC
EXISTING SEATING CAPACITY: 340 TOTAL SEATS
EXISTING STORAGE BUILDING
EXISTING SWINE
EXISTING LAMB & GOAT
N
Proposed Ag
EXISTING MECH
EXISTING CLASSROOMS
EXISTING MEN
EXISTING CONCESSION
EXISTING SHOP
EXISTING WOMEN
RENOVATED CATTLE WITH NEW LOCKERS AND WASH
STATIONS
PROPOSED NEW LAMB & GOAT WITH NEW LOCKERS
AND WASH STATIONS
N
PROPOSED SEATING CAPACITY: 560 TOTAL SEATS
EXISTING STORAGE PORTABLE
EXISTING STORAGE BUILDING
EXISTING PORTABLE
PROPOSED RENOVATED NORTH SWINE WITH NEW LOCKERS AND WASH STATIONS
PROPOSED RENOVATED EAST SWINE WITH NEW LOCKERS, WASH STATIONS AND COVERED EXERCISE AREA
3.4 Health Science
BUIL
DIN
SUPP
ORT
87 S
F
Existing Health Science
SHOWERS/ RESTROOMS
STOR. LOCKER ROOMS STORAGE 1000 SF
VEST VEST
OFFICE STORAGE CUST. 110 SF 100 SF
HEALTH SCIENCE 1400 SF
N
Proposed Health Science
LAUNDRY 72 SF
N
HEALTH SCIENCE 2300
CUST.
STORAGE 120 SF
OFFICE 110 SF
SCHOOL STORAGE 735 SF
BUIL
DIN
SUPP
ORT
87 S
F
INSTRUCTIONAL ADA TOILET & SHOWER 120 SF
OBSERVATION WINDOW
(3) LARGE BASINS WITH (2) TAPS EACH
3.5 Security Vestibule
Existing Security Vestibule
Atte
ndan
ce Stair
CounsCounsSecurity APCouns Waiting Waiting
Couns Couns
AP
Reception Mail Conference AP
Sec Kitchen Copy AP
Supply APPrincipal
Stor
Bookkeeper DataConference
IT/Rec/ Stor
Elec
N
Proposed Security Vestibule
Stair CounsCounsSecurity APCouns
Waiting WaitingCouns Couns
AP Waiting
Mail Conference AP Rec
TRANSACTION WINDOW Sec Kitchen Copy AP
Security Supply APvestibule Principal
Stor
Bookkeeper DataConference
IT/Rec/ Stor
Elec
Atte
ndan
ce
N
4 Exterior Development
Existing Exterior
Proposed Exterior at Culinary Arts
Proposed Exterior at Culinary Arts
Existing Exterior
Proposed Exterior at Welding & HVAC Labs
Questions?