SAVANNAH RIVER SITE F AND H AREA TANK FARMSNRC ONSITE OBSERVATION VISITJULY 28-29, 2015
Waste Disposal Authority
SRR-CWDA-2015-00095, Revision 1
S AVA N N A H R I V E R S I T E • A I K E N , S C • W W W. S R Re m e d i a t i o n . c o m 2
We do the right thing.
SRR-CWDA-2015-00095, Revision 1
Savannah River Site F and H Area Tank Farms
NRC Onsite Observation Visit
July 28, 2015
3S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Agenda: 7/28/2015
(#) - Activity number from NRC Observation Guidance[ML15162B071]
Start End Topic Location
8:00 8:45 Badging/Travel Meet 703-46A
8:45 9:00 Opening Remarks & Inbrief 705-1C, Room 34 A-B
9:00 9:30Status Update
-H and F Tank Farm-Tank Closure Documentation
705-1C, Room 34 A-B
9:30 11:00Technical Discussions [2, 3, 4]
-Status: Real Waste Testing-Status: Other Research/Analysis-Radiation Protection Program
705-1C, Room 34 A-B
11:00 12:00 Lunch 766-H
12:00 2:30Technical Discussions [1, 6]-Tanks 5/6 Closure Documentation
-Tank 16/12 Closure Documentation705-1C, Room 34 A-B
2:30 3:30 Technical Discussions [5]-Environmental Monitoring
705-1C, Room 34 A-B
3:30 4:15 NRC Internal Review 705-1C, Room 34 A-B
4:15 4:45 NRC Outbrief 705-1C, Room 34 A-B
4:45 5:00 Travel/NRC Depart 703-46A
NRC F-Tank Farm and H-Tank Farm Onsite Observation
Tuesday, July 28, 2015
4S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Agenda: 7/29/2015
(#) - Activity number from NRC Observation Guidance[ML15162B071]
Start End Topic Location
8:00 8:30 Badging/Travel Meet 703-46A
8:30 8:45 Inbrief 705-1C, Room 34 A-B
8:45 9:30 Tank 16 Grouting Overview 705-1C, Room 34 A-B
9:30 11:00 H-Tank Farm Field Observation (Tanks 16 & 12) H-Tank Farm
11:00 12:00 Lunch 766-H
12:00 1:30
Technical Discussions [7]-Site Stability
-NRC Tank Farm Monitoring Plan-Follow-up Discussions
705-1C, Room 34 A-B
1:30 2:00 NRC Internal Review 705-1C, Room 34 A-B
2:00 2:45 NRC Outbrief 705-1C, Room 34 A-B
2:45 3:00 Travel/NRC Depart 703-46A
NRC F-Tank Farm and H-Tank Farm Onsite Observation
Wednesday, July 29, 2015
5S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
NRC Observation Guidance
Activities1. Discuss documentation for closing FTF Tanks 5/6 including NRC staff’s
Technical Review of Grout Documentation for FTF Tanks 5/6.
2. Observe implementation of radiation protection program, including ALARA, air monitoring, final radiological data for Tanks 5/6 grouting, and Tank 12 and 16 sampling and grout preparations.
3. Discuss the status of the high-level waste tank residual solids sample leaching experiments.
4. Discuss other ongoing (DOE) research or analyses relevant to MFs listed in NRC staff’s monitoring plan.
5. Discuss Technical Review of Environmental Monitoring and Distribution Coefficient Reports.
6. Discuss Technical Review of Tanks 16 (and, as applicable, Tank 12) Closure Documentation. (In preparation)
7. Discuss questions related to site stability.Onsite Observation Guidance for July 28-29, 2015, Monitoring Visit to the Savannah River Site, F and H Area Tank Farms, ML15162B071.
6S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
NRC Observation Guidance
Follow-On Activities DOE to provide response in writing or another teleconference
call to NRC main points about water segregation and previously provided observations.
NRC arrange teleconference call with DOE regarding on-going residual waste testing.
NRC arrange teleconference call with DOE regarding on-going NRC waste tank structural analysis calculations.
Onsite Observation Guidance for July 28-29, 2015, Monitoring Visit to the Savannah River Site, F and H Area Tank Farms, ML15162B071.
7S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status: Tank Closure Progression
Tanks 5, 6, 17, 18, 19 & 20 complete
Isolation, and grout preparation
Grouting In-progress
Tank 12
Tank 16
Tanks 10, 13, & 15
Tanks 4, 7, 8 & 11
Tanks 1, 2, 3, 9, 14, 21, 22, 23, 24
BWR (sludge) development
8S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status: Tank Closure
Figure is updated through March – Since March, FFA Dispute Resolution was reached on Tanks 16/12 and new dates (Oct-15 and May-16, respectively) will be updated on the FFA Closure Commitment Column
17 D/S/E N/A N/A D/S/E20 D/S/E N/A N/A D/S/E18 D/S/E N/A N/A D/S/E 2012 201219 D/S/E N/A N/A D/S/E 2012 20125 D/S/E D/S/E 2013 20156 D/S/E D/S/E 2013 2015
16 D/S/E D/S/E Jun-15 Sep-15 201512 D/S/E D/S/E Jul-15 Jun-15 Feb-16 May-16 201511 D/S/E Oct-21 2024 20174 D/S/E May-28 2031 20227 D/S/E Oct-28 2032 20228 D/S/E Oct-26 2030 2022
24 Apr-28 N/A 2032 202221 Nov-27 N/A N/A 2032 202222 Ongoing N/A N/A 2030 202213 Hub Tank 2029 20213 Mar-25 2029 2021
10 Nov-16 2025 201714 Feb-23 2028 201915 May 15 2028 20219 Oct-19 2028 20192 Jan-23 2029 2021
23 Oct-27 N/A N/A 2030 20221 Nov-22 2029 2021
Key:[1] Forecast dates per LWSP rev 19 (Tk 12 & 16 per Challenge Schedules) Mo-Yr Activity planned start or resume (mo/yr)[2] Ventilation and essential instrumentation may remain until final tank grouting Activity is complete
N/A Activity is not needed
Tran
sfer
Pre
p
Phase I
Clo
sure
Doc
s A
ppro
ved
(CM
/WR
D/T
r2)
Ana
lyze
Sam
ple
Bulk Waste RemovalRemaining Phases
Che
mic
al
Mec
hani
cal
Ann
ulus
Isolate Tank
[2]
Salt Batch PrepDWPF Recycle
Salt Batch Hub
Waste Removal & Tank Closure
Tank
DO
E, S
CD
HEC
, EPA
A
ppro
vals
Heel Removal
DO
E, S
CD
HEC
, EPA
C
oncu
rren
ce
Characterization
FFA
Clos
ure
Fore
cast
[1]
FFA
Clos
ure
Com
mitm
ent
(FY
)
Mix
Tran
sfer
Pre
p
Mix
9S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status Update: H and F Tank Farm NDAA 3116 Activities
March 2014: FTF Onsite Observation Visit• The U.S. Nuclear Regulatory Commission March 26-27, 2014 Onsite
Observation Visit Report for the Savannah River Site F-Tank Farm Facility (Docket No. PROJ0734) [ML14106A573]
June 2014: NRC Staff Technical Evaluation Report of the Draft HTF Section 3116 Basis Document• Technical Evaluation Report for H-Area Tank Farm Facility,
Savannah River Site, South Carolina [ML14094A514]
October 2014: Tank 5/6 Grouting Operations Telecon• Summary of Telephone Conference Call Held On October 29, 2014,
Between the U.S. Nuclear Regulatory Commission Staff and Department of Energy Representatives Concerning NRC Staff Questions Regarding Tanks 5 and 6 Grouting Operations [ML14330A037]
10S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status Update: H and F Tank Farm NDAA 3116 Activities
December 2014: NRC Technical Review of Tank 5/6 Grouting Documentation• Technical Review: U.S. Department of Energy Documentation
Related to Tanks 5F and 6F Final Configurations With an Emphasis on Grouting From Recommendations and Testing to Final Specifications and Procedures (Project No. PROJ0734) [ML14342A784]
December 2014: DOE HTF Section 3116 Determination and Basis Document • Section 3116 Determination For Closure of H-Tank Farm at the
Savannah River Site, DOE-WD-2014-001 [ML15051A352]• Basis for Section 3116 Determination for Closure of H-Tank Farm
at the Savannah River Site, DOE/SRS-WD-2014-001 [ML15051A353]
11S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status Update: H and F Tank Farm NDAA 3116 Activities
March 2015: NRC Technical Review of Environmental Monitoring and Distribution Coefficients• Technical Review of Environmental Monitoring and Site-Specific
Distribution Coefficient Reports [ML12272A124]
April 2015: Tank 16 Closure Module and Associated References • Industrial Wastewater Closure Module for Liquid Waste Tank 16H,
H-Area Tank Farm, Savannah River Site, SRR-CWDA-2013-00091 Rev. 1 [ML15140A519]
• NRC Staff provided comments to SCDHEC on Rev. 0. [ML15103A413]
• Tank 16 Special Analysis for the Performance Assessment for the H-Area Tank Farm at the Savannah River Site, SRR-CWDA-2014-00106 Rev. 1 [ML15058A394]
12S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status Update: H and F Tank Farm NDAA 3116 Activities
June 2015: Initiated Grouting of Tank 16
June 2015: Tank 12 Closure Module and Associated References • Industrial Wastewater Closure Module for Liquid Waste Tank 12H,
H-Area Tank Farm, Savannah River Site, SRR-CWDA-2014-00086 Rev. 0 [ML15153A375]
• NRC Staff comments provided to SCDHEC. [ML15181A389]
July 2015: First Joint F and H Tank Farm Onsite Observation Visit (Current Visit)• Site Stability questions provided prior to visit. • Draft of NRC combined F and H Tank Farm monitoring plan
provided prior to visit.
13S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Technical Discussion Topics
(3) – Discuss the status of the high-level waste tank residual solids sample leaching experiments. (4) - Discuss other ongoing (DOE) research or
analyses relevant to MFs listed in NRC staff’s FTF monitoring plan. (2) – Observe implementation of DOE’s radiation
protection program, including ALARA, air monitoring, and final radiological data for Tanks 5/6 grouting, and Tank 12 and 16 sampling and grout preparations.
7/28 am
Onsite Observation Guidance for July 28-29, 2015, Monitoring Visit to the Savannah River Site, F and H Area Tank Farms, ML15162B071.
14S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status: Tank Waste Residual Solids Testing
Date Activity Document Title SRS Document Number /NRC Accession Number
May2013
NRC Issued Technical Review Report
Technical Review: Waste Release and Solubility Related Documents Prepared by United States Department of Energy to Support Final Basis for Section 3116 Determination for The F-Area Tank Farm Facility at Savannah River Site. Project No. PROJ0734.
ML12272A082
June2013
DOE Issues Experimental Plan
Task Technical and Quality Assurance Plan forDetermining the Radionuclide Release from TankWaste Residual Solids.
SRNL-STI-2013-00203, Rev. 0(ML13253A221)
November 2013
NRC Staff Provides Comments
November 2013 NRC Staff Comments on SRNL-RP-2013-00203, Rev. 0.
ML15153A385 / ML15153A393
March 2014
DOE Provides Status Update during FTF Onsite Observation Visit
Radionuclide Release from Tank Waste Residuals Solids.
SRNL-STI-2014-00117(ML14101A111)
Visit Report-(ML14106A573) April2014
DOE Updates Experimental Plan
Task Technical and Quality Assurance Plan for Determining the Radionuclide Release from Tank Waste Residual Solids.
SRNL-RP-2013-00203, Rev. 1(ML14148A068)
September 2014
DOE Issues FY2014 Testing Summary Report
Determining the Release of Radionuclides from Tank Waste Residual Solids.
SRNL-STI-2014-00456(ML15147A543)
February 2015
DOE Updates Experimental Plan
Task Technical and Quality Assurance Plan for Determining the Radionuclide Release from Tank Waste Residual Solids.
SRNL-RP-2013-00203, Rev. 2(provided as pre-visit documentation)
7/28/2015 Status Update During July 2015 HTF & FTF Onsite Observation Visit
Release of Radionuclides from Tank Waste Residual Solids.
SRNL-MS-2015-00116(to be provided as follow-up Action Item)
Future DOE Issues FY2015 Testing Summary Report
TBD (to be provided as follow-up Action Item)
15S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status: Lysimeter Testing
Lysimeter Testing• Fiscal Year (FY) 2014 experimental work provided in Determination of
Constituent Concentrations in Field Lysimeter Effluents – FY14 Final Report [ML15030A136]
• On-going (FY 2015) experimental work will be summarized in an FY 2015 final report.
– Final report will be provided to NRC when available.
16S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status: Miscellaneous
FY2015 PA Maintenance Plan• Savannah River Site Liquid Waste Facilities Performance Assessment
Maintenance Program – FY2015 Implementation Plan, SRR-CWDA-2014-00108
[ML15036A131]
17S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Radiation Protection Program
FTF and HTF Air Monitoring• FARMS Report
– A Facility Annual Review of Monitoring Systems (FARMS) documents the review of the adequacy of a facility's sampling and monitoring system i.e., retrospective air samplers (RAS), Area Radiation Monitors (ARM), and Area Monitoring ThermoluminescentDosimeters (TLD).
– Individual reports issued for FTF and HTF.• 2013 FARMS Report for FTF previously provided as a follow-up to Action
Item 3 from March 2014 Visit. [ML14101A104] • 2014 reports are available, DOE can provide reports if desired by NRC.
• SRS 2013 Annual Environmental Report– Available at:
http://www.srs.gov/general/pubs/ERsum/er/index.html
18S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Radiation Protection Program
Final Tank 5/6 Grouting Data• Provided as follow-up to Action Item 2 from March 2014 Visit
– Action Item Follow-up in Support of U.S. Nuclear Regulatory Commission Onsite Observation Visit on March 26-27, 2014, SRR-CWDA-2014-00094 [ML14302A536]
Tank 12 & 16 Sampling and Grout Preps • Work performed under stand alone work orders and
radiation work permits.– As a follow-up to this visit, DOE can provide available work
order/ALARA Review documentation if desired by NRC.
Need to determine if additional documentation should be added to Table 1-1, Documents Prepared by DOE That Would Be Useful to NRC, of the draft NRC Monitoring Plan.
19S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Technical Discussion Topics
(1) - Discuss documentation for closing FTF Tanks 5/6 including NRC staff’s Technical Review of Grout Documentation for FTF Tanks 5/6. (6) - Discuss Technical Review of Tanks 16 (and, as
applicable, Tank 12) Closure Documentation. (5) – Discuss Technical Review of Environmental
Monitoring and Distribution Coefficient Reports.
7/28 pm
Onsite Observation Guidance for July 28-29, 2015, Monitoring Visit to the Savannah River Site, F and H Area Tank Farms, ML15162B071.
20S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Documentation for Closing Tanks 5/6
NRC Staff Technical Review of Tank 5/6 Grout Documentation• Technical Review: U.S. Department of Energy
Documentation Related to Tanks 5F and 6F Final Configurations with an Emphasis on Grouting from Recommendations and Testing to Final Specifications and Procedures (Project No. PROJ0734) [ML14342A784]
21S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Closure Documentation for Tanks 16 and 12
Tank 16 Special Analysis• Tank 16 Special Analysis for the Performance Assessment for the H-Area
Tank Farm at the Savannah River Site, SRR-CWDA-2014-00106 Rev. 1 [ML15058A394]
Tank 16 Closure Module & Associated References• Industrial Wastewater Closure Module for Liquid Waste Tank 16H, H-Area
Tank Farm, Savannah River Site, SRR-CWDA-2013-00091 Rev. 1 [ML15140A519]
• NRC Staff provided comments to SCDHEC on Rev. 0. [ML15103A413]
Tank 16 Removal Report• Documentation of Removal of Highly Radioactive Radionuclides in Waste
Tank 16, SRR-CWDA-2015-00010, Rev. 0 [ML15163A227]
Tank 12 Closure Module & Associated References• Industrial Wastewater Closure Module for Liquid Waste Tank 12H, H-Area
Tank Farm, Savannah River Site, SRR-CWDA-2014-00086 Rev. 0 [ML15153A375]
• NRC Staff comments provided to SCDHEC. [ML15181A389]
22S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Documentation for Tanks 16 Grouting
The following documents were provided just prior to the visit• Tank 16H Grout Strategy, SRR-LWE-2014-00013, Rev. 1
• Tank 16-H Closure Assurance Plan, SRR-LWE-2014-00150, Rev. 0
• SRR Subcontractor Surveillance Plan Furnishing and delivery of Tank Closure Grout (TK16) (P.O. No. SRRA-064184-1), SRR-LWP-2014-00049, Rev. 0
Need to determine if additional documentation should be added to Table 1-1, Documents Prepared by DOE That Would Be Useful to NRC, of the draft NRC Monitoring Plan.
23S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Environmental Monitoring
Groundwater Reports• 2014 Annual Groundwater Monitoring Report For the F- and
H-Area Radioactive Liquid Waste Tank Farms (U), SRNS-RP-2015-00069 [ML15093A205]
• Scoping Summary For the General Separations Area Western Groundwater Operable Unit (U), ERD-EN-2005-0127 [ML15051A326]
• Scoping Summary For the General Separations Area Eastern Groundwater Operable Unit (U), WSRC-RP-2000-4134 [ML15051A322]
24S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Environmental Monitoring
NRC Staff Technical Review of Environmental Monitoring and Distribution Coefficient Reports• Technical Review of Environmental Monitoring and
Site-Specific Distribution Coefficient Reports [ML12272A124]
25S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Daily Outbrief: 7/28/2015
NRC Daily Outbrief
NRC Staff Outbrief Action Items captured
S AVA N N A H R I V E R S I T E • A I K E N , S C • W W W. S R Re m e d i a t i o n . c o m 26
We do the right thing.
Savannah River Site F and H Area Tank Farms
NRC Onsite Observation Visit
July 29, 2015
SRR-CWDA-2015-00095, Revision 1
27S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Agenda: 7/29/2015
(#) - Activity number from NRC Observation Guidance[ML15162B071]
Start End Topic Location
8:00 8:30 Badging/Travel Meet 703-46A
8:30 8:45 Inbrief 705-1C, Room 34 A-B
8:45 9:30 Tank 16 Grouting Overview 705-1C, Room 34 A-B
9:30 11:00 H-Tank Farm Field Observation (Tanks 16 & 12) H-Tank Farm
11:00 12:00 Lunch 766-H
12:00 1:30
Technical Discussions [7]-Site Stability
-NRC Tank Farm Monitoring Plan-Follow-up Discussions
705-1C, Room 34 A-B
1:30 2:00 NRC Internal Review 705-1C, Room 34 A-B
2:00 2:45 NRC Outbrief 705-1C, Room 34 A-B
2:45 3:00 Travel/NRC Depart 703-46A
NRC F-Tank Farm and H-Tank Farm Onsite Observation
Wednesday, July 29, 2015
28S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation
H-Tank Farm Field Observations Tank 16 Grouting Overview Status: Tanks 16 Tank 12 Grouting Equipment Field Observation Briefing
Field Observation (Tanks 16 & 12)
Depart for Lunch
29S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm
Testing and Accountability Entrance Station
30S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 Grouting
Typical Type II Tank
31S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 Grouting Strategy
Bulk Grout delivery option same as previous tanks• Vendor trucks from off-site.
Bulk fill grout formula same as Tanks 5/6 • Slump flow working range 26-30 inches.• Specification: Furnishing and Delivering of Tank Closure Grout,
C-SPP-F-00055 Rev. 4 [ML13238A090]
Equipment fill grout formula same as previous tanks• Formulation: Tanks 18 and 19-F Equipment Fill Grout Material
Evaluation and Recommendations, SRNL-STI-2011-00592 [ML13238A041]
Cooling coil fill grout formula same as previous tanks• Formulation: Closure of HLW Tanks – Formulation for a Cooling
Coil Grout, WSRC-STI-2008-00172 [ML13238A046]
32S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 Grouting Equipment
Slickline will be arranged to one primary tank riser or annulus riser at a time using fittings. Actual slickline routing per field instruction. Routing shown is for illustration only.
5” Slick Line
TK 16
Grout Pump
1-2” Hose
Grout Pump for In Tank Equipment
Manual Loading
Hopper
Grout Pump
Valve House
33S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 Grouting Strategy
GROUTLIFTS
Approximate Values per TankLIFT yd3 Trucks Gallons 1 936 117 189,0002 255 32 51,5003 2,911 364 588,0004 214 27 43,2505 1,768 221 357,0006 214 27 43,250
Total: 6,298 788 1,272,000
6
3
1
4
5
2
34S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 Grouting Strategy
Grouting Calendar (As of 7/23/2015)
S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 4Lift‐1 line plug Lift‐1 Lift‐3 Holiday
7 8 9 10 11 12 13 5 6 7 8 9 10 11Lift‐1 SDU‐6 Failed Coils Lift‐1 & 2 Lift‐3 Lift‐4 Lift‐5 Lift‐5
14 15 16 17 18 19 20 12 13 14 15 16 17 18Lift‐2 & 3 Lift‐3 Lift‐3 Lift‐3 Lift‐5 Lift‐5 Lift‐5 HTF Drill
21 22 23 24 25 26 27 19 20 21 22 23 24 25Lift‐3 Lift‐3 Lift‐3 Lift‐3 Lift‐5 Lift‐5 Eval. Riser Eval. Riser
28 29 30 26 27 28 29 30 31Lift‐3 Lift‐3
Days Tank 16 primary tank received grout Days Tank 16 failed cooling coils received grout
Days Tank 16 annulus received grout Days Tank 16 intact cooling coils received grout
Days Tank 16 riser(s) received grout Days Tank 16 in tank equipment received grout
Jun‐15 Jul‐15
35S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Status Tank 16(As of 7/23/2015)
Location % Complete
Primary Tank 94
Annulus 69
Failed Coils 100
Equipment Fill 0
Intact Coils 0
Risers 0
Inspection Ports 0
Overall 88
Total to Date~1,149,000 Gallons of grout~5689 Cubic Yards717 Trucks
36S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tank 16 Bulk Fill Grout Pump
37S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Annulus Grouting
Bulk fill grout will be used to fill annulus
Grout introduced into annulus through the East and West Risers
Initial filling of duct through ventilation inlets is not required (lower portion of duct will fill through open registers during bulk annulus fill)
Vertical sections of annulus ducting (inlet and exhaust) will be filled to grade level after bulk annulus fill is complete
Vertical Leg
Tank 5 Annulus
38S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Grout Testing Protocol
Grout Truck Arrival and Check-in:• Every Truck
Batch Tickets (Multiple Verifications)― Grout mix― Timing < 90 minutes― Revolutions < 300― Point of delivery water additions
• Daily First Batch & at least one truck after first
100 cubic yards― Molding Cylinders (7)― Compressive Strength (7 and 28 days)― Slump flow― Temperature― Unit weight/yield― Bleeding of grout― Air Content
• Additional testing frequency as determined by Construction Discipline Engineer (CDE)
Video of Grout Placement:• Continuous during grout placement
39S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Equipment Fill
Equipment fill grout will be prepared in small batches
SRR personnel pre-mix dry ingredients by weight
Water is combined with the dry materials as required, mixture is allowed to hydrate with low shear mixer
High shear mixer engaged to finish grout mixing and thin the grout
Grout is metered into equipment by gravity via hose and funnel
Equipment has high point vent that collects overflow indicating filling complete
40S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Cooling Coil Fill
Cooling coil grout is prepared using a commercial grout skid
Dry ingredients are premixed at vendor facility and delivered in a Super Sack®
SRR personnel batch a fixed amount of water with the contents of the Super Sack® (i.e., dry materials) and mix the contents
Pump is used to meter grout into cooling coils
Totalizer at flow meter provides real time quantity of grout added
Intact cooling coils will be grouted from the coil inlet. When grout is visually detected at cooling coil outlet, additional grout shall be introduced for a prescribed volume
Grout/flush water interface volume from intact coils will be collected and disposed of separately
Coils having guillotine failure were previously flushed, coils will be grouted from each end (inlet and outlet) into the waste tank
Tank 5/6 set-up shown for illustration
41S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 12 Grouting
Typical Type I Tank
42S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 12 Grouting Equipment
Note: Slickline routing shown is for illustration only. The slickline will be configured to support filling of one primary tank riser or annulus riser at a time using fittings and diversion valves. Actual slickline routing will be per field instruction
43S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 & 12
Tank 12
Tank 16
44S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tanks 16 & 12 Bulk Grout Fill
Concrete Truck Ingress/Egress Route
Cleanout Station
Testing and Accountability Entrance Station
Unloading Station
45S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Tank 16 & 12 Field Observation
• H-Tank Farm is a property protection area, no security escorts required for uncleared personnel within area.
• Personnel involved in tour should stay in contact with designated SRS personnel in order to provide instruction in the event of a need to shelter or evacuate the work area.
• During grouting operations, Grout Test area and truck unloading area is considered a construction work zone
• Construction work zones at a minimum require hard hat, side shield safety glasses and sturdy work shoes.
• Personnel requiring access to these work areas will attend a safety briefing and sign safe work permit for applicable work package(s).
• In addition to requiring standard Personal Protective Equipment for a construction work zone, the area around the grout pump is designated as requiring hearing protection.
• Uncured grout is highly alkaline. In the event that grout comes in contact with skin or clothing, you will be directed to nearest eye wash/safety shower for flushing.
• No areas on tour path requires sign in on a Radiological Work Permit (RWP) or wearing of rad dosimetry.
• Heat oasis station is available for cool off and hydration as required.
46S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Technical Discussion Topics
(5) – Discuss questions related to site stability. Discuss Draft combined Tank Farm NRC
Monitoring Plan Follow-up Discussions
7/29 pm
Onsite Observation Guidance for July 28-29, 2015, Monitoring Visit to the Savannah River Site, F and H Area Tank Farms, ML15162B071.
47S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Site Stability
Follow-up Action Item #11 from March 2014 Visit• NRC arrange teleconference call with DOE regarding
on-going NRC waste tank structural analysis calculations.
• NRC provided questions just prior to July 2015 visit.
48S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Draft Tank Farm NRC Monitoring Plan
Draft Monitoring Plan Combining FTF and HTF• U.S. Nuclear Regulatory Commission Plan for
Monitoring Disposal Actions Taken by the U.S. Department of Energy at the Savannah River Site F-Area and H-Area Tank Farm Facilities in Accordance With the National Defense Authorization Act for Fiscal Year 2005.
49S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Final Outbrief: 7/29/2015
NRC Observation Visit Outbrief
NRC Staff Outbrief Action Items Captured Closing Statements
50S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Final Outbrief: Action Items
Action Items1. DOE to provide NRC an electronic copy of presentation material
including action items and attendance rosters. [SRR-CWDA-2015-00095, Revision 1]
2. DOE to provide NRC an electronic copy of Release of Radionuclides from Tank Waste Residual Solids, SRNL-MS-2015-00116.
3. DOE to provide NRC a copy of the FY2015 summary report on tank waste residual solids testing when available.
4. DOE to provide NRC a copy of the FY2015 summary report on lysimeter testing when available.
51S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Final Outbrief: Action Items
Action Items1. DOE to provide NRC an electronic copy of presentation material
including action items and attendance rosters. [SRR-CWDA-2015-00095, Revision 1] (Complete)
2. DOE to provide NRC an electronic copy of Release of Radionuclides from Tank Waste Residual Solids, SRNL-MS-2015-00116.
3. DOE to provide NRC a copy of the FY2015 summary report on tank waste residual solids testing when available.
4. DOE to provide NRC a copy of the FY2015 summary report on lysimeter testing when available.
5. DOE to provide information on lessons learned/procedure changes relative to the rejected Tank 6 grout truck.
52S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Final Outbrief: Action Items
Action Items6. DOE to provide the NRC a copy of the Grout Drop Testing Report. 7. NRC to set up a telecon to discuss ongoing NRC grout testing
relative to Tank Farm Grout. 8. DOE to provide SCDHEC with copies of the Tank 16 Grouting
Strategy, Closure Assurance Plan, and Subcontractor Surveillance Plan.
9. DOE to provide the NRC with responses to Tank 16 Closure Module comments related to NRC General Comment #5 (Inventory).
10.DOE to provide NRC video/photos of in-tank evaluation to determine placement locations for final bulk fill of primary tank and associated lessons learned.
11.DOE to provide NRC video of grout flow into annulus duct inlet ventilation ports.
53S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Observation Visit Final Outbrief: Action Items
Action Items12. DOE to provide NRC information on how pore water chemistry is
assigned to case selection (GoldSim Probabilistic)13. DOE to include photos from Tank 16/12 field observation in
Revision 1 of this presentation. (Complete: slides 56-61)
14. DOE to provide NRC video of Tank 16 grout operations (full video)
15. DOE to provide NRC latest revisions of H & F Tank Farm FARMS reports.
54S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Attendance Sheet (7/28/2015)
55S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Attendance Sheet (7/29/2015)
56S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 16 View From Roadway
57S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 16 View From Roadway
58S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 12 View From Roadway
59S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 12 View From Roadway
Area Radiation Monitor
60S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 12 Slickline Carrier Beam Support
61S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
H-Tank Farm Field Observation Photos (Action Item #13)
Tank 21 Slurry Pump Removal
62S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Notes
63S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Notes
64S AVA N N A H R I V E R S I T E • A I K E N , S C • w w w. S R Re m e d i a t i o n . c o m
We do the right thing.
Notes
Top Related