Download - ROY HILL PORT MATERIALS HANDLING ESTIMATE · The Roy Hill iron ore project included extensive materials handling and ship loading infrastructure at the port facility. AGC were tendering

Transcript
Page 1: ROY HILL PORT MATERIALS HANDLING ESTIMATE · The Roy Hill iron ore project included extensive materials handling and ship loading infrastructure at the port facility. AGC were tendering

ROYHILLPORTMATERIALSHANDLINGESTIMATE

‘experiencemakesadifference’Suite901,140BourkeStreet,MelbourneVictoria3000

Level6,87WickhamTerrace,SpringHillQueensland4000Tel:0396636661Fax:0396636330

Email:[email protected]

TheClient

AGCAusGroupareaconstructioncompanyactiveinmechanicalscaffoldingandinsulationinremotesites.

TheProject

TheRoyHillironoreprojectincludedextensivematerialshandlingandshiploadinginfrastructureattheportfacility.AGCweretenderingthetrainunloading,stockyardareaandstoragefacilityattheport.

TheChallenge

Ø Toperformfirstprinciplesestimatefortender-forconveyorsandconstructionofstackers,reclaimersandrailwagontippler

Ø Todevelopconstructionmethods,andconceiveconstructionschedule

TheOutcome

Ø EstimatepreparedfromFlagstaff’sextensivedatabaseofresourcecosts,productionratesandFlagstaff’sunderstandingofthebasicsofconstructioncontracting