Department Name00 Month 2010
ROOF FRAMING
MEMBERS AND CALCULATIONS.
Presentation Title | 00 Month 2010 | Slide 2
ROOF FRAMING
• RAFTERS• HIPS• VALLEYS• CREEPERS• UNDER PURLINS• PURLIN PROPS• OUT RIGGERS• CRIPPLE
CREEPERS• COLLAR TIES
Presentation Title | 00 Month 2010 | Slide 3
RAFTERS
Presentation Title | 00 Month 2010 | Slide 4
RAFTERS
Presentation Title | 00 Month 2010 | Slide 5
THE RAFTERS ARE THE MAIN STRUCTURE OF THE ROOF FRAME .THE RAFTERS SPAN ACROSS THE COMPLETE DISTANCE OF THE EXTERNAL WALL FRAMES.THE MAIN RAFTERS ARE CALLED COMMON RAFTERS .
Presentation Title | 00 Month 2010 | Slide 6
HIPS
Presentation Title | 00 Month 2010 | Slide 7
THE HIPS ARE VERY SIMILAR AS RAFTERS EXCEPT THEY COME FROM THE CORNERS OF THE HOUSE EG: 45o
THE HIPS ARE CUT AT THE SAME PITCH AS THE RAFTERS BUT HAVE A DIFFERENT PLUMB CUT.
HIP RAFTERS-
Presentation Title | 00 Month 2010 | Slide 8
VALLEY RAFTER
Presentation Title | 00 Month 2010 | Slide 9
VALLEY SET OUTS.
Presentation Title | 00 Month 2010 | Slide 10
• VALLEYS ARE THE SAME AS HIPS EXCEPT THEY START AND FINISH FROM THE INTERNAL CORNERS OF THE HOUSE FRAME ./ STILL AT 45o.
VALLEYS
Presentation Title | 00 Month 2010 | Slide 11
CREEPER RAFTERS.
Presentation Title | 00 Month 2010 | Slide 12
CREEPERS ARE ALSO KNOWN AS CREEPER RAFTERS .
THEY ARE THE RAFTERS THAT COME OFF THE HIP AT RIGHT ANGLES.
EACH CREEPER HAS A SHORTENING AT THE SAME DISTANCE.
CREEPERS
Presentation Title | 00 Month 2010 | Slide 13
UNDER PURLINS
Presentation Title | 00 Month 2010 | Slide 14
THE UNDER PURLIN IS FIXED UNDER THE RAFTERS AND 2/3rds UP THE ROOF SLOPE FROM THE TOP PLATES .
TO ASSIST IN THE CORRECT POSITIONING OF THE UNDER PURLIN LOCATION LINES SHOULD BE SET OUT ON THE PATTERN RAFTER.
UNDER PURLIN
Presentation Title | 00 Month 2010 | Slide 15
PURLIN PROPS
Presentation Title | 00 Month 2010 | Slide 16
PURLIN PROPS ARE THE UP RIGHT MEMBERS THAT SUPPORT THE ROOF LOAD.
THEY SIT ON TOP OF A WALL PLATE AND CONNECT TO THE UNDER PURLIN THIS IS CALLED A POINT LOAD AND SHOULD BE SUPPORTED TO THE GROUND.
PURLIN PROPS
Presentation Title | 00 Month 2010 | Slide 17
CRIPPLE CREEPERS
Presentation Title | 00 Month 2010 | Slide 18
CRIPPLE CEEPERS ARE SIMILAR TO CREEPERS ALTHOUGH THEY START FROM THE RIDGE OR FLYING HIP AND FINISH AT THE VALLEY.
THE DIFFERENCE BETWEEN THE CREEPER AND THE CRIPPLE CREEPER IS THAT THERE IS NO BIRDSMOUTH CUT . IT IS A STRAIGHT PLUMB CUT AT ONE END AND A REVERSED CREEPER CUT AT THE OTHER.
CRIPPLE CREEPERS
Presentation Title | 00 Month 2010 | Slide 19
COLLAR TIES
Presentation Title | 00 Month 2010 | Slide 20
COLLAR TIES ARE USED TO TIE THE OPPOSING RAFTERS TOGETHER.
TO STOP THEM FROM DROPPING AND FALLING APART.
COLLAR TIES ARE SET INTO POSITION
2/3rds UP THE ROOF SLOPE AND SIT ON
TOP OF THE UNDER PURLIN, THEN NAILED.
COLLAR TIES
Presentation Title | 00 Month 2010 | Slide 21
RAFTER LENGTH CALCULATION EXAMPLE.FIND THE SPAN EXAMPLE 6000 mmFIND THE 1/2 SPAN EXAMPLE 3000 mmFIND THE 1/2 SPAN MINUS 1/2 RIDGE THICKNESSEXAMPLE 3000mm MINUS 19mm = 2981 mm
Presentation Title | 00 Month 2010 | Slide 22
• RIDGE SIZE = 175 X 38• ROOF PITCH = 40 deg 2’• BUILDING SPAN = 6000 mm• BUILDING HALF SPAN = 3000 mm • = 2981 mm• = 3892 mm
ROOF FRAMING
Presentation Title | 00 Month 2010 | Slide 23
• 1/2 SPAN MINUS 1/2 RIDGE THICKNESS• = 2981mm• 2000 mm = 2612 mm• 900 mm = 1175 mm• 80 mm = 104mm• 1 mm = 1 mm• TOTAL RAFTER LENGTH = 3892 mm