7/26/2019 RO Package Bumhan Water Co.
1/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
RO Package
BUMHAN WATERS CO., LTD.
7/26/2019 RO Package Bumhan Water Co.
2/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
3/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
4/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
Functions : Removing small specific gravity suspended solids andcolloids. The Pressure filter is one of the sand filter whose tanks
are filled with sands, anthracites, gravels, etc. The suspended
solids & colloids shall be removed to protect the R membrane.
7/26/2019 RO Package Bumhan Water Co.
5/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
6/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
Pressure Filter Operation
1.Service
Removing small specific gravity suspended solids and colloids.
!"#$%'%(%,%'%() open*
2. Air Back Wash
+uspended solids & colloids in filter media removed for high efficiency, %
time of ir$backwash will be perfomed each ' times backwash.
!"#$%'%(',%'%(- pen *
3. Backwash
+uspended solids & colloids in filter media removed in general time.!"#$
%'%(,%'%(/ open*
4. Settling
0t will be operated to stabli1e the media rised by "ackwash.
!all valve close*
5. inse
Remaining suspended solids & colloids in filter media removed.!"#$
%'%(2,%'%( open*
7/26/2019 RO Package Bumhan Water Co.
7/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
%* 0n case level of Filtered 3ater Tank is less than middle of full li4uid, PF will be started, and if level of the tank
is high, the PF will be stopped.
)* 0n case level of R Permeate Tank is high, PF will be stopped.
* 0n case of being satisfied with the following level conditions, PF "ackwash will be started.
$ when level of filtered water tank is greater than 56ow5
$ 0n case level of filtered water tank is 56ow5 during backwash, "73 process will be stopped.
$ 0n case alarm is reset, the suspended "73 will be started from initial step.
/* 0n case alarm is occurred by 8P!8P0T$%'%(%7"* during PF service, the standby PF will be switched
over for operation after %( seconds automatically, and then backwash !"73* will be operated.
2* s a result of phenomenon clogged by suspended solids is severe for media, backwash will be operated
in air$backwash process. 0n case not being improved for media clogged phenomenon, backwash will be
operated. +tatistically % time of ir$backwash will be performed each ' times backwash.
* 0n case of changing new media, a sufficient backwash and rinse should be re4uired.
'* PF shall be designed to be treated for )m97hr!ma.* flow in basis, and controlled by the filtered water tank
level !60T$%'%/%* in the latter part of PF. lso, PF can control the level of filtered water tank !8$%-'* by
6#$%'%(- which is )$way valve.
-* 6#$%'%(- shall control the flow of PF outlet line as set value!+#*, and can be ad;usted with filtered at this time.
7/26/2019 RO Package Bumhan Water Co.
8/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
Pressure Filter set-point
Filtered water tank Level (LIT-167141)
more than 95% : HH larm
more than 9!% : H larm" #re$$re &ilter $to'
le$$ than 6!% : #re$$re &ilter $tart le$$ than !% : L larm" *+ 'm'" ,o &eed 'm' to'" #re$$re Filter *+ $to'
le$$ than 1!% : LL larm
2. Filtered water tank Level (D-1876)
Filtered water tank 6evel !60T$%'%/%*
> larm
larm, Pressure filter stops
(= : Pressure filter starts)(= : 6 larm, "73 pump, Ro feed pump +top, Pressure Filter "73 stop
%(= : 66 larm
2. Filtered water tank Level (D-1876)
7/26/2019 RO Package Bumhan Water Co.
9/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
Function : : R is a process that separates organic
compounds and inorganic materials from water
through a semipermeable which takes place to forcewater molecules to flow against a net osmostic
pressure. This is accomplished by applying enough
pressure on high concentration side of a
semipermeable membrane to reverse the net
migration of water molecules
?P
7/26/2019 RO Package Bumhan Water Co.
10/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
O !nit Operation
1.Pre"Service
Pre$service shall be carried out to reduce
conductivity of standby R unit
!"#$%'%(
7/26/2019 RO Package Bumhan Water Co.
11/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
To trenchRo permeate water
R Bnit 0nlet
%stR unit concentation water
R Bnit concentration water outlet
R Bnit permeate water outlet
7/26/2019 RO Package Bumhan Water Co.
12/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
%*R Bnit will consist of total sets, normally % set will be operated. sets of R Bnit can be operated by level of 8$%-'-.
)* R Bnit will be operated with auto mode, and operated by setting of service time step by step.
* R Feed pump!P$%-'* will be started when level of 8$%-' is greater than )(=.
/* Aicro filter!F6$%-'* shall be used to protect R Bnit from particles and other containments.
2* Flow transmitter !F0T$%'%-* of A" utlet will be operated lower than the set value!)m97hr* in R Bnit. 0f maintaining the value during 2
minutes, the R Bnit will be stopped.
* 0f 6evel of R Permeate tank !60T$%'%/)* is greater than igh Pressure Pump will be operated after ) minutes !delay time ) min.*. P+6$
%'%(% and P+6$%'%(/ should be stopped at the time.
%2* 0n R Bnit operation, P$%--) and P$%-- will be started automatically. The chemicals in;ection !+"+ and ntiscalant* will be controlled by
R Bnit operation.
%* 0n case all R Bnits stop, the P$%--) and P$%-- will be stopped.
7/26/2019 RO Package Bumhan Water Co.
13/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
@>CA0@6 @6CE0E +G+TCA
%* % set of R Bnit was designed in cleaning as capacity of R @0P Tank!8$%--/* is approimately (.2m9.
)* R Bnit cleaning will be performed as the following conditions.
$ when the differential pressure !8P* increases %2= rather than the initial condition.
$ 0n case of increasing %2= compared to initial treatment water conductivity.
$ 0n case of decreasing %2= compared to initial produced water 4uantity.
* @alculation of dilution chemicals amount
%. R #essel volume H !(.)m (.)m .%/ I /* .2m ea 2(=H(.%2m9)ea housing
). Pipe volume H !(.(/m (.(/m .%/ I / * %(mH (.(%m9
. Put the cleaning chemicals after filling up to '(= of the level in R @0P Tank
/. @leaning chemicals will be used with >@l and Ea>, and use chemicals with dilution to ad;ust p>.
!>@l )= H (./- liter, Ea> 2(= H (.( liter*
/* The cartridge filter shall be replaced for @0P Aicro filter!F6$%--/* in cleaning.
2* @leaning shall be used with >@l for rinse and then rinse with Ea>.
* ll steps of R @0P process will be operated manually. fter all processes are completed, check the
normal operating conditions, and then operate R Bnit in auto mode.
'* Rinse with Ea> to remove organic matters and >@l to remove inorganic matters for cleaning.
7/26/2019 RO Package Bumhan Water Co.
14/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
@>CA0@6 @6CE0E +TCP
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
15/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
chemical
1. #leaning water Preparation
P$%--/ run
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
16/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
2. ec$cle
P$%--/ run
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
17/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
Ro @0P Tank
R$%
%. @leaning water
preparation
). Recycle
R$%(
R$
R @0P Tank
R$%
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
18/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
3. Soak % &o 'low
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
19/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
4. (ow Pressure rinse
P$%--/ run
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
20/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
/. 6ow Pressure Rinse
R$igh Pressure Rinse
R $%
R $%(
R @0P TankR @0P Tank
P$%-'' run
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
23/40
The Professional Group in Ultra Pure Water System
J
RO !"# set-point
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
24/40
The Professional Group in Ultra Pure Water System
J
R Permeate tank 6evel !60T$%'%/)*
> larm, R BE0T stops
-2= : > larm, Pressure filter stops '(= : R Bnit %set starts
(= : R Bnit ) set starts
2(= : R Bnit set starts
)(= : 6 larm, A" Feed pump, A" Regen. pump +tops
%(= : 66 larm
2. RO Per$eate tank Level (D-1878)
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
25/40
The Professional Group in Ultra Pure Water System
Function: "oth @ation !)** and nion resin !O)"* can be added to
anion echange vessel and mied to create a mied bed echanger
because it has to separate and regenerate two resins. The intimate
miing of the cation and anion resin allows a very high degree of
deioni1ation. Aied bed echangers produce the highest 4uality
deminerali1ed water of any of the ion echange units
+")*, O)"t $pe -ie/ Be/ esin Be/
&a*
, 0*
#O3
2"
, )#O3
"
)*
O)"
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
26/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
27/40
The Professional Group in Ultra Pure Water System
1.Pre"Service
Pre$service shall be carried out to reduce to conductivity
of standby A" unit
!"#$%'%%,%'%)2 open*
-ie/ Be/ Operation
2. Service
Aied bed echangers produce the highest 4uality
deminerali1ed water.
!"#$%'%%,%'%%/ pen *
3. Backwash
"ackwash will be carried out to separate combined
cation and anion resins for regenerationpurpose.
!"#$%'%%2,%'%% open*
4. Settling
0t will be operated to stabili1e the resins rised by
"ackwash.
!ll valves close*
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
28/40
The Professional Group in Ultra Pure Water System
5.Basic nection
0n;ect Ea>!J2=* in the tower downward for anion
resin regeneration. Then, put water upward to
avoid contacting the cation resins for chemical
in;ection.
!"#$%'%%',%'%%-,%'%% not reacted.
Then, put water upward.
!"#$%'%%',%'%%-,%'%%
7/26/2019 RO Package Bumhan Water Co.
29/40
The Professional Group in Ultra Pure Water System
8.1st inse
Process to wash regeneration remaining chemical in
resin layer.
!"#$%'%%2,%'%%
7/26/2019 RO Package Bumhan Water Co.
30/40
The Professional Group in Ultra Pure Water System
13.2n/ inse"1
fter combining resins, the rinse process will be carried
to get a better 4uality of water and effluent the
remaining waste water with high flow rate. The
waste water will be drained.
!"#$%'%),%'%)/ open*
-ie/ Be/ Operation
14. 2n/ inse"2
fter combining resins, the rinse process will be carried
to get a better 4uality of water and effluent the
remaining waste water with high flow rate.
3ater will be recycled in filtered water tank.!"#$%'%),%'%)2 open*
15. Pre"service
Pre$service will be carried out to get a pure 4uality of
water. !"#$%'%),%'%)2 open*
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
31/40
The Professional Group in Ultra Pure Water System
%i&ed 'ed set-point
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
32/40
The Professional Group in Ultra Pure Water System
%* A" Tower will be operated automatically by service time, and can be turned over for standby.
)* A" Tower shall be affected by level of Treated 3ater +torage Tank. 0n case level is >, it shall be returned by F#$%'%(.
* 0n case A" "ackwash shall be satisfied with the following level conditions, A" backwash will be started.
$ 3hen R permeate tank level is more than 56ow5
$ 0n case R permeate tank level is 56ow 5 during A" regen, A" regen. process will be stopped. 0n case alarm is reset, suspended regen.
will be started from initial step.
/* 0n case conductivity!@C$%'%5 alarm will be occurred during A" service, change service time setting and turn over operation and
regeneration will be performed. Cven though regeneration operation, in case conductivity 5>5 alarm keeps occurring, check up the
system problem and then take the re4uied action.
2* 0n A" service start, Pre$service process will be progress and in case @C$%'%
7/26/2019 RO Package Bumhan Water Co.
33/40
The Professional Group in Ultra Pure Water System
&eutrali+ation Process
%* p> Aeter!C$%'% K %( >@l ecess of in;ection
p> @l small 4uantity of in;ection
p> 2J Ea> small 4uantity of in;ection
p>L2 Ea> ecess of in;ection
* Eeutrali1ation process shall be started by Eeutrali1ation sump level!60T$%'%/'*, and it will be stopped by set low level value.
/* 0f chemical will be in;ected during set circulation time, measure p> after circulation. 0n case of p> reaches standard value !p> M p> will be out of standard value, re$in;ect chemicals after circulation. Aeasure p> to estimate whether effluent or not.
#heical osing !nit
%* @hemical tank level will be setting (J%((=.
)* 0n 6 alarm operation, operation of agitator and electric heater will be stopped. @hemicals shall be supplementary.
* 0n 66 alarm operation, chemical pump will be stopped.
/* Clectric >eater of Ea> Tank will be started as configured temperature and it will be off after heating Ea> up to configured temperature.
2* gitator of chemical tank will be operated for )( minutes in case the level rises up with measuring tank level once a minute.
* @hemicals supplement shall be used with portable pump to be filled up for sufficient amount of chemicals
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
34/40
The Professional Group in Ultra Pure Water System
P FF60EC +3 is the switch to modify the internal parameter of touch screen.
Touch the button in the parameter to go to net screen.
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
35/40
The Professional Group in Ultra Pure Water System
$ Press Ney Pad call button :
0nput the Regen. time table setting value & +ervice Time
$ 0f press OPF regen.stop button during "ackwash, the process
will be stopped and time will be reset. 0f press OPF
Regen.restart button, the process will be started over.
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
36/40
The Professional Group in Ultra Pure Water System
>A0 peration
Pneumatic valve close status : ray
open status : reen
Pump stop status : white
run status : reen
Trouble status : Red
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
37/40
The Professional Group in Ultra Pure Water System
0f press ORegen.stop button during regen. process,
the process will be stopped and time will bereset. 0f press ORegen.restart button, the
process will be started over.
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
38/40
The Professional Group in Ultra Pure Water System
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
39/40
The Professional Group in Ultra Pure Water System
+etting #alue : Gellow
Aeasuring #alue : reen
Pump select state : Run pump : reen
+tanby pump : gray
0F touching the yellow input by hands, the
input key window will be appeared as
input status and input value can be
activated. nd then, press QCnterD
AAC EA PROJECT
7/26/2019 RO Package Bumhan Water Co.
40/40
The Professional Group in Ultra Pure Water System
+TRT : To check the alarm content, cursor movement, or enter alarm content. Press O+TRT button.
C0T : fter activating the alarm content, eit from the alarm screen. Press QCitD.
@N : fter checking the alarm, press 5@N5 button. 0f press the button, checked alarm time will be recorded andalarm color will be changed.
@6R : To delete the alarm history which recorded on the alarm screen. Press 5@6R5 button.